Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

CPPBDN5017 Mapping and Delivery Guide
Produce 2-D drawings for building design projects using CAD software

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency CPPBDN5017 - Produce 2-D drawings for building design projects using CAD software
Description
Employability Skills
Learning Outcomes and Application This unit of competency specifies the outcomes required to produce two-dimensional (2-D) drawings from instructions, sketches, drawings and plans for design projects using computer-aided design (CAD) software. It requires knowledge of Australian standards and drawing protocols to ensure the drawings produced and notations included conform to those standards and protocols.The unit supports the production of 2-D building design drawings for residential, commercial and industrial building design projects. It applies to all construction industry personnel who are required to produce 2-D building design drawings using CAD software.Licensing, legislative, regulatory or certification requirements apply to this unit of competency in some States. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

The following must be present and available to learners during assessment activities:

equipment:

computer with two different types of 2-D CAD software

file management system

contingencies:

incompatible files supplied for importing into 2-D CAD drawing

specifications:

2-D CAD software user manual

details of drawings required

AS 1100.101 Technical drawing – General principles

AS 1100.301 Technical drawing – Architectural drawing.

Timeframe:

according to project schedule.

Assessor requirements

As a minimum, assessors must satisfy the assessor requirements in the Standards for Registered Training Organisations (RTOs) current at the time of assessment.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Create drawing template files.
  • Basic drawing environment is set up according to organisational standards and industry protocols.
  • Layering strategy is created as needed to meet standard drawing requirements.
  • Architectural library is created to meet standard drawing requirements.
  • Text and dimension styles are created to meet standard drawing requirements.
  • Line types of different thicknesses are created to meet standard drawing requirements.
  • Hatch patterns and types are created to meet standard drawing requirements.
  • Title blocks are set up for different drawing sizes.
  • Reference schedules are set up according to workplace and statutory requirements.
       
Element: Create 2-D drawings.
  • Drawing requirements are identified and confirmed with project personnel.
  • -D CAD software programs and functions are used to produce different types of -D drawings using suitable layers if required.
  • Notations, compliant with Australian standards and drawing protocols, are added to drawings as required.
  • Dimensions are added to drawings as required, and scales are applied according to Australian standards and drawing protocols.
       
Element: Import files.
  • Digital text and drawing files from other software applications are imported into 2-D CAD drawings.
  • External 2-D drawing files are inserted into 2-D CAD drawings.
  • Hard copy documents are scanned and saved as correct file types to import into 2-D CAD drawings.
       
Element: Edit drawing components.
  • Editing commands are used to modify drawing elements and text.
       
Element: Print CAD drawings.
  • Page layout for the drawing file is set to suit printing requirements.
  • Print parameters for the printer are set.
  • Drawings are printed on the correct media.
       
Element: Save and back up files.
  • File directories are created for the drawing project.
  • Drawing files are saved for later retrieval and backed up to specified drives or directories according to workplace procedures.
       
Element: Export files.
  • Drawing files are created and sent to external personnel for use in different software applications.
  • PDF files are created for personnel to view completed drawings without using CAD software packages.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Create drawing template files.

1.1.

Basic drawing environment is set up according to organisational standards and industry protocols.

1.2.

Layering strategy is created as needed to meet standard drawing requirements.

1.3.

Architectural library is created to meet standard drawing requirements.

1.4.

Text and dimension styles are created to meet standard drawing requirements.

1.5.

Line types of different thicknesses are created to meet standard drawing requirements.

1.6.

Hatch patterns and types are created to meet standard drawing requirements.

1.7.

Title blocks are set up for different drawing sizes.

1.8.

Reference schedules are set up according to workplace and statutory requirements.

2.

Create 2-D drawings.

2.1.

Drawing requirements are identified and confirmed with project personnel.

2.2.

2-D CAD software programs and functions are used to produce different types of 2-D drawings using suitable layers if required.

2.3.

Notations, compliant with Australian standards and drawing protocols, are added to drawings as required.

2.4.

Dimensions are added to drawings as required, and scales are applied according to Australian standards and drawing protocols.

3.

Import files.

3.1.

Digital text and drawing files from other software applications are imported into 2-D CAD drawings.

3.2.

External 2-D drawing files are inserted into 2-D CAD drawings.

3.3.

Hard copy documents are scanned and saved as correct file types to import into 2-D CAD drawings.

4.

Edit drawing components.

4.1.

Elements that are not required are deleted or purged from drawings.

4.2.

Editing commands are used to modify drawing elements and text.

5.

Print CAD drawings.

5.1.

Page layout for the drawing file is set to suit printing requirements.

5.2.

Print parameters for the printer are set.

5.3.

Drawings are printed on the correct media.

6.

Save and back up files.

6.1.

File directories are created for the drawing project.

6.2.

Drawing files are saved for later retrieval and backed up to specified drives or directories according to workplace procedures.

7.

Export files.

7.1.

Drawing files are created and sent to external personnel for use in different software applications.

7.2.

PDF files are created for personnel to view completed drawings without using CAD software packages.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit.

The person must use two different types of two-dimensional (2-D) computer-aided design (CAD) software according to manufacturer specifications and organisational standards to produce at least five different types of 2-D building design drawings selected from the following:

bracing plan

electrical power and lighting plan

floor framing plan

floor plan

house drainage plan (sewerage)

lot plan

roof drainage plan

roof framing plan

site plan

slab or footing layout plan

stormwater layout plan.

In doing the above, the person must:

identify and apply drawing standards and protocols

identify and apply styles, characteristics, technologies and decorative styles

demonstrate sound understanding of the structural function of building elements

import and export information

use range of 2-D CAD functions.

A person demonstrating competency in this unit must demonstrate knowledge of:

architectural styles and terminology that apply to the building design drawings specified in the performance evidence

building materials used in building design projects, and their representation in drawings

structural systems used in building design projects and the structural function of building elements

drafting and drawing standards and protocols, including:

AS 1100.101 Technical drawing – General principles

AS 1100.301 Technical drawing – Architectural drawing

construction technology relating to building design projects

functions and operation of 2-D CAD software programs

general work health and safety (WHS) principles and responsibilities that apply to the production of 2-D CAD drawings

hard copy and digital file management procedures

types and uses of architectural drawings.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Create drawing template files.

1.1.

Basic drawing environment is set up according to organisational standards and industry protocols.

1.2.

Layering strategy is created as needed to meet standard drawing requirements.

1.3.

Architectural library is created to meet standard drawing requirements.

1.4.

Text and dimension styles are created to meet standard drawing requirements.

1.5.

Line types of different thicknesses are created to meet standard drawing requirements.

1.6.

Hatch patterns and types are created to meet standard drawing requirements.

1.7.

Title blocks are set up for different drawing sizes.

1.8.

Reference schedules are set up according to workplace and statutory requirements.

2.

Create 2-D drawings.

2.1.

Drawing requirements are identified and confirmed with project personnel.

2.2.

2-D CAD software programs and functions are used to produce different types of 2-D drawings using suitable layers if required.

2.3.

Notations, compliant with Australian standards and drawing protocols, are added to drawings as required.

2.4.

Dimensions are added to drawings as required, and scales are applied according to Australian standards and drawing protocols.

3.

Import files.

3.1.

Digital text and drawing files from other software applications are imported into 2-D CAD drawings.

3.2.

External 2-D drawing files are inserted into 2-D CAD drawings.

3.3.

Hard copy documents are scanned and saved as correct file types to import into 2-D CAD drawings.

4.

Edit drawing components.

4.1.

Elements that are not required are deleted or purged from drawings.

4.2.

Editing commands are used to modify drawing elements and text.

5.

Print CAD drawings.

5.1.

Page layout for the drawing file is set to suit printing requirements.

5.2.

Print parameters for the printer are set.

5.3.

Drawings are printed on the correct media.

6.

Save and back up files.

6.1.

File directories are created for the drawing project.

6.2.

Drawing files are saved for later retrieval and backed up to specified drives or directories according to workplace procedures.

7.

Export files.

7.1.

Drawing files are created and sent to external personnel for use in different software applications.

7.2.

PDF files are created for personnel to view completed drawings without using CAD software packages.

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Drawing requirementsmust include:

details:

area analysis

construction notes

general notes

location of neighbouring buildings

services plans

structural information

five or more of the following:

bracing plans

electrical power and lighting plans

floor framing plans

floor plans

house drainage plans (sewerage)

lot plans

roof drainage plans

roof framing plans

site plans

slab or footing layout plans

stormwater layout plans.

Drawing protocolsmust include:

abbreviations

commonly used symbols

dimensioning

drawing titles

hatched regions

legends

lettering standards

line types

numbering

paper size

scale

schedules

standard units of measurement.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Basic drawing environment is set up according to organisational standards and industry protocols. 
Layering strategy is created as needed to meet standard drawing requirements. 
Architectural library is created to meet standard drawing requirements. 
Text and dimension styles are created to meet standard drawing requirements. 
Line types of different thicknesses are created to meet standard drawing requirements. 
Hatch patterns and types are created to meet standard drawing requirements. 
Title blocks are set up for different drawing sizes. 
Reference schedules are set up according to workplace and statutory requirements. 
Drawing requirements are identified and confirmed with project personnel. 
-D CAD software programs and functions are used to produce different types of -D drawings using suitable layers if required. 
Notations, compliant with Australian standards and drawing protocols, are added to drawings as required. 
Dimensions are added to drawings as required, and scales are applied according to Australian standards and drawing protocols. 
Digital text and drawing files from other software applications are imported into 2-D CAD drawings. 
External 2-D drawing files are inserted into 2-D CAD drawings. 
Hard copy documents are scanned and saved as correct file types to import into 2-D CAD drawings. 
Editing commands are used to modify drawing elements and text. 
Page layout for the drawing file is set to suit printing requirements. 
Print parameters for the printer are set. 
Drawings are printed on the correct media. 
File directories are created for the drawing project. 
Drawing files are saved for later retrieval and backed up to specified drives or directories according to workplace procedures. 
Drawing files are created and sent to external personnel for use in different software applications. 
PDF files are created for personnel to view completed drawings without using CAD software packages. 

Forms

Assessment Cover Sheet

CPPBDN5017 - Produce 2-D drawings for building design projects using CAD software
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPPBDN5017 - Produce 2-D drawings for building design projects using CAD software

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: