Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

CPPSIS6022 Mapping and Delivery Guide
Produce mine drawings

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency CPPSIS6022 - Produce mine drawings
Description
Employability Skills
Learning Outcomes and Application This unit of competency specifies the outcomes required to use high-level design software program functions and features to produce mine drawings. The unit covers preparing the drawing environment by analysing project specifications; and setting up hardware, software, menus and drawing defaults accordingly. It also covers designing and creating mine drawings; producing drawing files that are saved in various formats; measuring and calculating mine volumes; and checking and validating the results to identify and resolve errors. The unit requires the ability to link drawing entities to database attributes and create and plot detailed views using various scales. The unit supports those who work in a technical management role in a mining environment and take responsibility for liaising with clients and end users to meet project requirements.Licensing, legislative, regulatory or certification requirements apply to this unit in some States where mining surveying must be undertaken under the supervision of a registered surveyor. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

The following must be present and available to learners during assessment activities:

Equipment:

personal computer, including drawing applications and software appropriate for producing mine drawings

hardware, including printer, scanner, plotter and multimedia devices and peripherals

Specifications:

project and design specifications

organisational policies, procedures and documentation relating to legal requirements for mines safety

Physical conditions:

access to equipped work station

Relationships with team members and supervisor:

working in a team

Relationships with client:

client consultation required.

Timeframe:

as specified by the client and project requirements.

Assessor requirements

As a minimum, assessors must satisfy the assessor requirements in the Standards for Registered Training Organisations (RTOs) current at the time of assessment.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare drawing environment.
  • Project specifications are sourced and analysed; and objectives, deliverables, constraints and principal work activities are identified and documented in consultation with appropriate persons.
  • Hardware and software are set up and used according to organisational requirements.
  • Menus and drawing defaults are customised to suit project specifications according to organisational requirements.
  • Survey database is created according to organisational requirements.
       
Element: Create mine drawings.
  • Drawings for surface mine are created using available software drawing functions and features to meet project specifications.
  • Drawings are designed to incorporate mines safety requirements according to project specifications and organisational requirements.
  • Drawing entities are linked to database attributes to suit project specifications.
  • Supplementary data is extracted from existing mining and engineering plans and drawings to meet project specifications.
  • Detailed views are created using various scales to meet project specifications.
  • Plots are produced at required scale to meet project specifications.
       
Element: Produce output.
  • Files are saved in various formats according to organisational requirements.
  • Entities are produced from drawing files or database and listed in required format to meet project specifications.
  • Identified spatial components are accurately measured or set out, and data is reduced to project reference system.
  • Mine volumes are calculated and validated using captured data and measurements, and errors are resolved or contingencies managed according to specifications and organisational requirements.
       
Element: Finalise drawings.
  • Drawings are finalised and checked for compliance with project specifications and organisational requirements.
  • Appropriate persons are notified of results according to organisational requirements.
  • Documentation is completed and spatial data archived according to organisational requirements.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Prepare drawing environment.

1.1.

Project specifications are sourced and analysed; and objectives, deliverables, constraints and principal work activities are identified and documented in consultation with appropriate persons.

1.2.

Hardware and software are set up and used according to organisational requirements.

1.3.

Menus and drawing defaults are customised to suit project specifications according to organisational requirements.

1.4.

Survey database is created according to organisational requirements.

2.

Create mine drawings.

2.1.

Drawings for surface mine are created using available software drawing functions and features to meet project specifications.

2.2.

Drawings are designed to incorporate mines safety requirements according to project specifications and organisational requirements.

2.3.

Drawing entities are linked to database attributes to suit project specifications.

2.4.

Supplementary data is extracted from existing mining and engineering plans and drawings to meet project specifications.

2.5.

Detailed views are created using various scales to meet project specifications.

2.6.

Plots are produced at required scale to meet project specifications.

3.

Produce output.

3.1.

Files are saved in various formats according to organisational requirements.

3.2.

Entities are produced from drawing files or database and listed in required format to meet project specifications.

3.3.

Identified spatial components are accurately measured or set out, and data is reduced to project reference system.

3.4.

Mine volumes are calculated and validated using captured data and measurements, and errors are resolved or contingencies managed according to specifications and organisational requirements.

4.

Finalise drawings.

4.1.

Drawings are finalised and checked for compliance with project specifications and organisational requirements.

4.2.

Appropriate persons are notified of results according to organisational requirements.

4.3.

Documentation is completed and spatial data archived according to organisational requirements.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit. The person must also use a range of design software program functions and features to produce mine drawings that meet technical specifications for two different projects.

While producing the above mine drawings, the person must:

define and document project objectives, constraints and main work activities

prepare the drawing environment by setting up hardware and software system and drawing defaults, and customising menus

communicate clearly with clients and stakeholders to clarify drawing requirements and detail

apply mathematical concepts and skills to a range of surveying-related problems

comply with standard operating procedures, drawing standards and organisational requirements relating to:

completing records and reporting

drafting mine drawings

protocols for saving and formatting drawing files

create mine drawings that comply with design requirements, including:

data extracted from existing mining and engineering drawings

drawing entities linked to database attributes

incorporating mines safety requirements

producing drawings, views and plots at required scale

exercise precision and accuracy in relation to measurements, tolerances and design

save drawing files in formats relevant to software

select and use appropriate equipment and software, as specified in the assessment conditions, to produce mine drawings.

A person demonstrating competency in this unit must demonstrate knowledge of:

display principles in relation to mine drawings, including:

colour

composition

font type

legends

media

scale

size

text and line style

drawing principles, capabilities and uses in relation to mine drawings

industry-accepted drawing standards, data formats, and precision and accuracy requirements for preparing mine drawings using software

methods for validating drawings and measurements to identify errors

organisational, legal and statutory requirements relating to:

records and documentation

reporting

standard engineering and mining plan design and presentation conventions

techniques for incorporating surface mining methods and mines safety requirements into mine drawings.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Prepare drawing environment.

1.1.

Project specifications are sourced and analysed; and objectives, deliverables, constraints and principal work activities are identified and documented in consultation with appropriate persons.

1.2.

Hardware and software are set up and used according to organisational requirements.

1.3.

Menus and drawing defaults are customised to suit project specifications according to organisational requirements.

1.4.

Survey database is created according to organisational requirements.

2.

Create mine drawings.

2.1.

Drawings for surface mine are created using available software drawing functions and features to meet project specifications.

2.2.

Drawings are designed to incorporate mines safety requirements according to project specifications and organisational requirements.

2.3.

Drawing entities are linked to database attributes to suit project specifications.

2.4.

Supplementary data is extracted from existing mining and engineering plans and drawings to meet project specifications.

2.5.

Detailed views are created using various scales to meet project specifications.

2.6.

Plots are produced at required scale to meet project specifications.

3.

Produce output.

3.1.

Files are saved in various formats according to organisational requirements.

3.2.

Entities are produced from drawing files or database and listed in required format to meet project specifications.

3.3.

Identified spatial components are accurately measured or set out, and data is reduced to project reference system.

3.4.

Mine volumes are calculated and validated using captured data and measurements, and errors are resolved or contingencies managed according to specifications and organisational requirements.

4.

Finalise drawings.

4.1.

Drawings are finalised and checked for compliance with project specifications and organisational requirements.

4.2.

Appropriate persons are notified of results according to organisational requirements.

4.3.

Documentation is completed and spatial data archived according to organisational requirements.

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Appropriate persons must include at least one of the following:

client

colleague

end user

registered or qualified surveyor

site personnel.

Drawing functions and features must include at least eight of the following:

arcs

area and volumes functions

creating output files using designs or survey pick-up data

dimensions

drawing features, such as polylines and texts

drawing functions

edit functions

grade reports

isometrics and perspectives

macros

methods for drawing lines

ore and waste reports

two-dimensional (2-D) coordinate plotting.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Project specifications are sourced and analysed; and objectives, deliverables, constraints and principal work activities are identified and documented in consultation with appropriate persons. 
Hardware and software are set up and used according to organisational requirements. 
Menus and drawing defaults are customised to suit project specifications according to organisational requirements. 
Survey database is created according to organisational requirements. 
Drawings for surface mine are created using available software drawing functions and features to meet project specifications. 
Drawings are designed to incorporate mines safety requirements according to project specifications and organisational requirements. 
Drawing entities are linked to database attributes to suit project specifications. 
Supplementary data is extracted from existing mining and engineering plans and drawings to meet project specifications. 
Detailed views are created using various scales to meet project specifications. 
Plots are produced at required scale to meet project specifications. 
Files are saved in various formats according to organisational requirements. 
Entities are produced from drawing files or database and listed in required format to meet project specifications. 
Identified spatial components are accurately measured or set out, and data is reduced to project reference system. 
Mine volumes are calculated and validated using captured data and measurements, and errors are resolved or contingencies managed according to specifications and organisational requirements. 
Drawings are finalised and checked for compliance with project specifications and organisational requirements. 
Appropriate persons are notified of results according to organisational requirements. 
Documentation is completed and spatial data archived according to organisational requirements. 

Forms

Assessment Cover Sheet

CPPSIS6022 - Produce mine drawings
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPPSIS6022 - Produce mine drawings

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: