Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

CPPWMT3020 Mapping and Delivery Guide
Place and compact waste

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency CPPWMT3020 - Place and compact waste
Description
Employability Skills
Learning Outcomes and Application This unit of competency specifies the outcomes required to place and compact waste to form a batter at a landfill site. The unit covers preparing for plant operation by reviewing work specifications, identifying hazards and risks, and organising required equipment, tools and materials. It also covers conducting pre-operational checks of plant and equipment to ensure correct and safe operation and resolving identified problems. The unit requires following manufacturer specifications to start, operate, isolate, shut down, clean and maintain plant and equipment. It requires the ability to work with others to maintain communication while operating plant, and monitor gauges, inputs and outputs to ensure optimal operation and safety at all times. The unit also requires the ability to place and compact waste according to the stage of batter development, and using movement and compaction techniques which aid the formation of the waste battering angle, tight compaction and minimise dust and contamination to the environment.The unit supports those who work under limited supervision in a waste management team.Licensing, legislative, regulatory or certification requirements may apply to this unit of competency in some States where a licence is required to operate various plant, vehicles or equipment used to transport, shift, load, unload, lift, compact or otherwise process waste. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

The following must be present and available to learners during assessment activities:

equipment:

personal protective equipment (PPE), as specified by organisational requirements

plant and equipment required to place and compact waste, as specified by organisational requirements

relationships with team members and supervisor:

working under limited supervision.

Timeframe:

as specified by organisational requirements.

Assessor requirements

As a minimum, assessors must satisfy the assessor requirements in the Standards for Registered Training Organisations (RTOs) current at the time of assessment.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to place and compact waste.
  • Work specifications are reviewed in consultation with relevant personnel to identify waste placement and compaction requirements.
  • Plant and associated equipment, tools and materials for waste placement and compaction are selected and obtained according to organisational requirements.
  • Personal protective equipment (PPE) is selected, checked and used according to organisational and compliance requirements.
  • Landfill cell is assessed to determine waste placement requirements and cell capacity.
  • Hazards and risks are identified and managed or reported according to organisational and compliance requirements.
  • Safety barriers and signs are erected at work site to ensure safe operating procedures according to organisational and compliance requirements.
       
Element: Conduct pre-operational checks on plant and equipment.
  • Pre-start visual checks and service checks are conducted according to manufacturer specifications, organisational and compliance requirements.
  • Plant systems and associated equipment are tested for correct functioning according to manufacturer specifications and organisational requirements.
  • Associated equipment is checked and tested to ensure it is operating effectively according to manufacturer specifications.
       
Element: Operate plant to place and compact waste.
  • Plant is started, operated and driven in a safe and efficient manner according to manufacturer specifications and organisational requirements.
  • Surrounding environment is continuously observed to identify and avoid or minimise potential hazards.
  • Plant operation and gauges are monitored to ensure correct operational functioning according to manufacturer specifications.
  • Communication with other personnel is maintained to ensure safe plant operation according to organisational and compliance requirements.
  • Waste types to be placed are selected according to stage of batter development, and organisational and compliance requirements.
  • Moving and compaction techniques are used to aid the formation of waste battering angle, tight waste compaction and to minimise dust and contamination to surrounding environment.
  • Smaller waste is placed on top of larger waste objects on the batter to ensure even placement and to avoid large waste objects protruding from the batter.
  • Placed waste is traversed to ensure a smooth, tight and compacted surface.
       
Element: Finalise waste placement and compaction activities.
  • Plant is shut down according to manufacturer specifications and organisational requirements.
  • Plant is parked or stored in a safe location to avoid damage to plant, obstruction of surrounding site activity, and unauthorised use.
  • Plant and associated equipment are cleaned to remove debris and contamination and ensure safe and efficient operation according to manufacturer specifications.
  • Record of placement and compaction activities are completed according to organisational and compliance requirements.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Prepare to place and compact waste.

1.1.

Work specifications are reviewed in consultation with relevant personnel to identify waste placement and compaction requirements.

1.2.

Plant and associated equipment, tools and materials for waste placement and compaction are selected and obtained according to organisational requirements.

1.3.

Personal protective equipment (PPE) is selected, checked and used according to organisational and compliance requirements.

1.4.

Landfill cell is assessed to determine waste placement requirements and cell capacity.

1.5.

Hazards and risks are identified and managed or reported according to organisational and compliance requirements.

1.6.

Safety barriers and signs are erected at work site to ensure safe operating procedures according to organisational and compliance requirements.

2.

Conduct pre-operational checks on plant and equipment.

2.1.

Pre-start visual checks and service checks are conducted according to manufacturer specifications, organisational and compliance requirements.

2.2.

Plant systems and associated equipment are tested for correct functioning according to manufacturer specifications and organisational requirements.

2.3.

Associated equipment is checked and tested to ensure it is operating effectively according to manufacturer specifications.

3.

Operate plant to place and compact waste.

3.1.

Plant is started, operated and driven in a safe and efficient manner according to manufacturer specifications and organisational requirements.

3.2.

Surrounding environment is continuously observed to identify and avoid or minimise potential hazards.

3.3.

Plant operation and gauges are monitored to ensure correct operational functioning according to manufacturer specifications.

3.4.

Communication with other personnel is maintained to ensure safe plant operation according to organisational and compliance requirements.

3.5.

Waste types to be placed are selected according to stage of batter development, and organisational and compliance requirements.

3.6.

Moving and compaction techniques are used to aid the formation of waste battering angle, tight waste compaction and to minimise dust and contamination to surrounding environment.

3.7.

Smaller waste is placed on top of larger waste objects on the batter to ensure even placement and to avoid large waste objects protruding from the batter.

3.8.

Placed waste is traversed to ensure a smooth, tight and compacted surface.

4.

Finalise waste placement and compaction activities.

4.1.

Plant is shut down according to manufacturer specifications and organisational requirements.

4.2.

Plant is parked or stored in a safe location to avoid damage to plant, obstruction of surrounding site activity, and unauthorised use.

4.3.

Plant and associated equipment are cleaned to remove debris and contamination and ensure safe and efficient operation according to manufacturer specifications.

4.4.

Record of placement and compaction activities are completed according to organisational and compliance requirements.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit.

The person must also place and compact waste at a landfill site to form a batter on two separate occasions.

While placing and compacting waste, the person must:

conduct an assessment of the landfill cell to correctly identify:

accessibility due to weather or ground conditions

cover material requirements for batter and stage of landfill development

prepare for the plant operation by interpreting work specifications and organising the required equipment, materials and personnel

follow organisational procedures to work safely and comply with regulatory and legal requirements

follow manufacturer specifications to:

conduct pre-operational checks of the plant and associated equipment to confirm correct function and operation, including:

pre-start visual checks, as specified in the range of conditions

service checks, as specified in the range of conditions

clean the plant and associated equipment

start-up, shut-down and isolate the plant

identify and segregate waste types including regulated and non-conforming waste and valuable resources in waste

use industry-approved techniques to move, place and compact waste to create a batter, including:

aiding the formation of the waste battering angle

ensuring tight waste compaction

minimising dust and contamination to the surrounding environment.

A person demonstrating competency in this unit must demonstrate knowledge of:

classifications of waste

equipment and materials which may be required to operate, clean and maintain plant for waste placement and compaction

hazards and risks associated with waste placement and compaction

organisational policies and procedures and regulatory and legal requirements relating to placing and compacting waste

procedures used to start-up, shut-down, isolate, maintain and clean plant used for waste placement and compaction

techniques used to move and compact waste in a landfill cell

types, streams and characteristics of waste including hazardous and dangerous waste

waste management hierarchy

waste non-conformances and contaminants.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Prepare to place and compact waste.

1.1.

Work specifications are reviewed in consultation with relevant personnel to identify waste placement and compaction requirements.

1.2.

Plant and associated equipment, tools and materials for waste placement and compaction are selected and obtained according to organisational requirements.

1.3.

Personal protective equipment (PPE) is selected, checked and used according to organisational and compliance requirements.

1.4.

Landfill cell is assessed to determine waste placement requirements and cell capacity.

1.5.

Hazards and risks are identified and managed or reported according to organisational and compliance requirements.

1.6.

Safety barriers and signs are erected at work site to ensure safe operating procedures according to organisational and compliance requirements.

2.

Conduct pre-operational checks on plant and equipment.

2.1.

Pre-start visual checks and service checks are conducted according to manufacturer specifications, organisational and compliance requirements.

2.2.

Plant systems and associated equipment are tested for correct functioning according to manufacturer specifications and organisational requirements.

2.3.

Associated equipment is checked and tested to ensure it is operating effectively according to manufacturer specifications.

3.

Operate plant to place and compact waste.

3.1.

Plant is started, operated and driven in a safe and efficient manner according to manufacturer specifications and organisational requirements.

3.2.

Surrounding environment is continuously observed to identify and avoid or minimise potential hazards.

3.3.

Plant operation and gauges are monitored to ensure correct operational functioning according to manufacturer specifications.

3.4.

Communication with other personnel is maintained to ensure safe plant operation according to organisational and compliance requirements.

3.5.

Waste types to be placed are selected according to stage of batter development, and organisational and compliance requirements.

3.6.

Moving and compaction techniques are used to aid the formation of waste battering angle, tight waste compaction and to minimise dust and contamination to surrounding environment.

3.7.

Smaller waste is placed on top of larger waste objects on the batter to ensure even placement and to avoid large waste objects protruding from the batter.

3.8.

Placed waste is traversed to ensure a smooth, tight and compacted surface.

4.

Finalise waste placement and compaction activities.

4.1.

Plant is shut down according to manufacturer specifications and organisational requirements.

4.2.

Plant is parked or stored in a safe location to avoid damage to plant, obstruction of surrounding site activity, and unauthorised use.

4.3.

Plant and associated equipment are cleaned to remove debris and contamination and ensure safe and efficient operation according to manufacturer specifications.

4.4.

Record of placement and compaction activities are completed according to organisational and compliance requirements.

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Work specificationsmust include at least five of the following:

materials for covering activities

details of special burials, including:

classification of waste

characteristics of waste

waste types

emergency and PPE requirements

tools, equipment, labour and material requirements

landfill development sequence

plant operation requirements

potential hazards and risks

reporting requirements

site requirements

waste types to be processed

work schedules.

Relevant personnel must include at least one of the following:

supervisor or team leader

team member.

Compliance requirements must include:

commonwealth, state and territory legislation relating to waste placement and compaction, including:

environmental protection

hazardous substances and dangerous goods

industry codes

work health and safety

licensing requirements.

Pre-start visual checks must include checks for:

blockages

component wear

damage

leaks

obstructions

potential hazards.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work specifications are reviewed in consultation with relevant personnel to identify waste placement and compaction requirements. 
Plant and associated equipment, tools and materials for waste placement and compaction are selected and obtained according to organisational requirements. 
Personal protective equipment (PPE) is selected, checked and used according to organisational and compliance requirements. 
Landfill cell is assessed to determine waste placement requirements and cell capacity. 
Hazards and risks are identified and managed or reported according to organisational and compliance requirements. 
Safety barriers and signs are erected at work site to ensure safe operating procedures according to organisational and compliance requirements. 
Pre-start visual checks and service checks are conducted according to manufacturer specifications, organisational and compliance requirements. 
Plant systems and associated equipment are tested for correct functioning according to manufacturer specifications and organisational requirements. 
Associated equipment is checked and tested to ensure it is operating effectively according to manufacturer specifications. 
Plant is started, operated and driven in a safe and efficient manner according to manufacturer specifications and organisational requirements. 
Surrounding environment is continuously observed to identify and avoid or minimise potential hazards. 
Plant operation and gauges are monitored to ensure correct operational functioning according to manufacturer specifications. 
Communication with other personnel is maintained to ensure safe plant operation according to organisational and compliance requirements. 
Waste types to be placed are selected according to stage of batter development, and organisational and compliance requirements. 
Moving and compaction techniques are used to aid the formation of waste battering angle, tight waste compaction and to minimise dust and contamination to surrounding environment. 
Smaller waste is placed on top of larger waste objects on the batter to ensure even placement and to avoid large waste objects protruding from the batter. 
Placed waste is traversed to ensure a smooth, tight and compacted surface. 
Plant is shut down according to manufacturer specifications and organisational requirements. 
Plant is parked or stored in a safe location to avoid damage to plant, obstruction of surrounding site activity, and unauthorised use. 
Plant and associated equipment are cleaned to remove debris and contamination and ensure safe and efficient operation according to manufacturer specifications. 
Record of placement and compaction activities are completed according to organisational and compliance requirements. 

Forms

Assessment Cover Sheet

CPPWMT3020 - Place and compact waste
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPPWMT3020 - Place and compact waste

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: