Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
CPPWMT3020 Mapping and Delivery Guide
Place and compact waste
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | CPPWMT3020 - Place and compact waste |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit of competency specifies the outcomes required to place and compact waste to form a batter at a landfill site. The unit covers preparing for plant operation by reviewing work specifications, identifying hazards and risks, and organising required equipment, tools and materials. It also covers conducting pre-operational checks of plant and equipment to ensure correct and safe operation and resolving identified problems. The unit requires following manufacturer specifications to start, operate, isolate, shut down, clean and maintain plant and equipment. It requires the ability to work with others to maintain communication while operating plant, and monitor gauges, inputs and outputs to ensure optimal operation and safety at all times. The unit also requires the ability to place and compact waste according to the stage of batter development, and using movement and compaction techniques which aid the formation of the waste battering angle, tight compaction and minimise dust and contamination to the environment.The unit supports those who work under limited supervision in a waste management team.Licensing, legislative, regulatory or certification requirements may apply to this unit of competency in some States where a licence is required to operate various plant, vehicles or equipment used to transport, shift, load, unload, lift, compact or otherwise process waste. Relevant state and territory regulatory authorities should be consulted to confirm those requirements. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. The following must be present and available to learners during assessment activities: equipment: personal protective equipment (PPE), as specified by organisational requirements plant and equipment required to place and compact waste, as specified by organisational requirements relationships with team members and supervisor: working under limited supervision. Timeframe: as specified by organisational requirements. Assessor requirements As a minimum, assessors must satisfy the assessor requirements in the Standards for Registered Training Organisations (RTOs) current at the time of assessment. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to place and compact waste. |
| |||||||
Element: Conduct pre-operational checks on plant and equipment. |
| |||||||
Element: Operate plant to place and compact waste. |
| |||||||
Element: Finalise waste placement and compaction activities. |
|