FPPPUL330A Mapping and Delivery Guide
Co-ordinate and implement pulping plant shutdowns

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency FPPPUL330A - Co-ordinate and implement pulping plant shutdowns
Description This unit describes the outcomes required to co-ordinate and implement pulping plant shutdowns in the pulp and paper industry General legislation, regulatory, licensing and certification requirements applicable to this unit are detailed in the range statementSpecific high risk (and non-high risk) load shifting licensing requirements for this unit may be applicable and are to be met separately and prior to the achievement of this unit
Employability Skills This unit contains employability skills
Learning Outcomes and Application This unit applies to operators who co-ordinate and implement pulping plant shutdowns in the pulp and paper industry. This work typically involves complex integrated equipment and continuous operationsThis unit generally applies to those who:assess causes and effects of shutdown implement shutdown procedures, andrecord and report shutdown informationto meet safety, quality and productivity requirementsIt does not include starting up, monitoring, controlling or troubleshooting and rectifying pulping plant operations
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not Applicable
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Assess causes and effects of shutdown
  • Causes and effects of shutdown operations are assess within Occupational Health and Safety (OHS) regulations, environmental and safe working requirements/practices, Standard Operating Procedures (SOP), and housekeeping requirements
  • Work area instructions or maintenance schedules are used to co-ordinate a planned shutdown
  • Cause of unplanned shutdown is identified and located
  • Effects of unplanned shutdown are assessed to determine impact on operations
  • Unplanned shutdown is communicated as required
       
Element: Implement shutdown procedures
  • Shutdown procedures are implemented within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
  • Planned shutdown is implemented
  • Unplanned shutdown is responded to and rectified
  • Isolation requirements are implemented as required
  • Shutdown information is communicated to relevant personnel as required
       
Element: Record and report shutdown information
  • Shutdown information is recorded and reported within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements
  • Shutdown information is recorded, including corrective action as required
  • Shutdown information is reported to relevant personnel
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence should be relevant to the work. It should satisfy the requirements of the elements and performance criteria and include consideration of:

the required knowledge and skills tailored to the needs of the specific workplace

applicable OHS regulations, environmental and safe working requirements/practices, SOP and housekeeping requirements

applicable aspects of the range statement

practical workplace demonstration of skills in co-ordinating and implementing pulping plant shutdowns

Context of and specific resources for assessment

A workplace assessment must be used to assess:

the application of required knowledge on the job

the application of skills on the job, over time and under a range of typical conditions that may be experienced in pulping operations.

Access to the full range of equipment involved in integrated continuous manufacturing of pulping plant operations in a pulp or paper mill is required

Method of assessment

A combination of assessment methods should be used. The following examples are appropriate for this unit:

observation of applied skills and knowledge on the job

workplace demonstrations via a mock-up or simulation that replicate part/s of the job

answers to written or verbal questions about specific skills and knowledge

third-party reports from relevant and skilled personnel

written evidence e.g. log sheet entries, checklist entries, test results

Assessment processes and techniques must be culturally appropriate and in keeping with the language and literacy capacity of the learner and the work being performed. This includes conducting an assessment in a manner that allows thoughts to be conveyed verbally so that the learner can both understand and be understood by the assessor (e.g. use plain English and terminology used on the job)

A holistic assessment with other units relevant to the pulp and paper industry, mill and job role is recommended

Additional information on approaches to assessment for the pulp and paper industry is provided in the Assessment Guidelines for this Training Package


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This describes the skills and knowledge required for this unit.

Required skills

Uses required forms of communication in co-ordinating and implementing a pulping plant shutdown

Reads and interprets required documentation, procedures and reports

Accesses, navigates and enters computer-based information

Interprets instruments, gauges and data recording equipment

Identifies and actions problems within level of responsibility

Identifies and responds appropriately to shutdown causes

Respond to problems associated with plant shutdown and unplanned shutdown to ensure safety quality and productivity

Coordinates and plans shutdown activity

Identifies and monitors process control points

Maintains situational awareness in work area

Uses measuring equipment as required

Operates manual or materials handling equipment

Operates high risk (and non-high risk) load shifting equipment as required

Analyses and uses sensory information to adjust process to maintain and co-ordinate safety, quality and productivity

Uses electronic and other control systems to control equipment and processes as required

Required knowledge

Procedures, regulations and legislative requirements relevant to pulping plant operations including OHS, environmental including relevant sustainability requirements/practices, SOP, isolation procedures, safe working requirements, risks and hazard identification and housekeeping

Relevant forms of communication

Basic problem-solving techniques consistent with level of responsibility

Causes and effects of system faults and rectification requirements

Impact of inappropriate responses

Working knowledge of pulping plant, processes, layout and associated services sufficient to carry out shutdown activities within level of responsibility

Types, causes and effects of pulping plant shutdowns

Required responses to all unplanned shutdowns (e.g. power outage, mechanical breakdown, blockages, jamming, air supply, control system failure) to ensure safety quality and productivity

Process and procedures for plant shutdowns and unplanned shutdowns

Plant and machinery functions and operations

Emergency procedures and responses

Application of high risk (and non-high risk) load shifting equipment as required

Sensory information that indicates a deviation from standard operating parameters

Sufficient knowledge of electronic and other control systems, operation and application to make appropriate adjustments that control the pulping operations, within level of responsibility

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Productivity requirements may include:

energy efficiency

waste minimisation

evaporation minimisation, including landfill and waste water reduction

environmentally safe waste disposal

consideration of resource utilisation, including fibre efficiency

minimising delays

chemical recovery maximisation

meeting key performance indicators

line speed

handovers

quality checks

meeting output targets i.e. net tonnes per employee per annum

machine/process time availability i.e. time the machine or process is making product

machine/process production rate

Operational parameters may include:

flows

temperatures

pressures

through put

consistencies

amps

set points

valve settings

levels

interlocks

Storage levels may include:

vats

chests

silos

tanks

bins

piles

Pulping processes - chemical, mechanical and semi-chemical pulping may include:

bleaching plant operations

refining

chip preparation

cleaning or washing systems

chemical preparation and treatment

pulp lapping production

stock distribution and storage

digester operations

mechanical pulping systems

Products of these processes may include:

bleached or unbleached pulp

fluff pulp

crumbed pulp

baled, rolled or sheet pulp

slushed pulp

Materials and supplies may include:

woodchips

pulp

steam

water

chemicals

power

Equipment may include:

power and steam systems

hydraulic and electrical systems

chemical delivery and processing

conveyors and pump distribution equipment

pneumatic systems

process plant

materials handling equipment

hand and power tools

computer systems

electronic screens and alarms

process control systems

analogue and digital instruments

fully automated, semi-automated, manually operated plant and equipment appropriate to pulping operations

Electronic control systems may include:

Digital Control System (DCS)

touch screens

robotics

Legislation, regulatory, licensing and certification requirements may include:

OHS and environmental requirements (local, state and commonwealth)

activity or task specific high risk (and non-high risk) load shifting licensing requirements

relevant endorsed licences

hazardous chemical handling

air and gas discharges

safety instructions

Documentation, procedures and reports may include:

SOP

work instructions or purchase orders

environmental sustainability requirements/practices

plant manufacturing operating manuals

quality procedures

oil or chemical spills and disposal guidelines

plant isolation documentation

safe work documentation e.g. plant clearance, job safety analysis, permit systems

log sheets and shift reports

work orders

delivery or distribution documentation

tally or production records

incident reports

Materials Safety Data Sheets (MSDS)

process and instrumentation diagrams

Maintenance may include:

operator level maintenance as per site agreement

operator maintenance schedules

calibrating test equipment

maintenance systems

maintenance suppliers

proactive maintenance strategies e.g. Total Productive Maintenance (TPM), Reliability Centred Maintenance (RCM)

Actions may include:

process adjustments

reporting to authorised person

rectifying problem within level of responsibility

Communications may include

interaction with:

internal or external

customers and suppliers

team members

maintenance services

operational management

statutory authorities

Situational awareness may include

awareness of:

traffic

pedestrians

location of equipment

product

hazards

obstruction

unexpected movement

Sensory information may include:

visual

sound

feel

touch

smell

vibration

temperature

Forms of communications may include:

written e.g. log books, emails, incident and other reports, run sheets, data entry

reading and interpreting documentation e.g. SOP, manuals, checklists, drawings

verbal e.g. radio skills, telephone, face to face, handover

non-verbal e.g. hand signals, alarms, observations

signage e.g. safety, access

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Causes and effects of shutdown operations are assess within Occupational Health and Safety (OHS) regulations, environmental and safe working requirements/practices, Standard Operating Procedures (SOP), and housekeeping requirements 
Work area instructions or maintenance schedules are used to co-ordinate a planned shutdown 
Cause of unplanned shutdown is identified and located 
Effects of unplanned shutdown are assessed to determine impact on operations 
Unplanned shutdown is communicated as required 
Shutdown procedures are implemented within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements 
Planned shutdown is implemented 
Unplanned shutdown is responded to and rectified 
Isolation requirements are implemented as required 
Shutdown information is communicated to relevant personnel as required 
Shutdown information is recorded and reported within OHS regulations, environmental and safe working requirements/practices, SOP, and housekeeping requirements 
Shutdown information is recorded, including corrective action as required 
Shutdown information is reported to relevant personnel 

Forms

Assessment Cover Sheet

FPPPUL330A - Co-ordinate and implement pulping plant shutdowns
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

FPPPUL330A - Co-ordinate and implement pulping plant shutdowns

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: