Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
FPPSTM330A Mapping and Delivery Guide
Shut down and bank steam boiler
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | FPPSTM330A - Shut down and bank steam boiler |
---|---|---|---|
Description | This unit describes the outcomes required to shut down and bank steam boiler/s in the pulp and paper industryGeneral legislation, regulatory, licensing and certification requirements applicable to this unit are detailed in the range statementSpecific high risk licensing requirements for this unit may be applicable and are to be met separately and prior to the achievement of this unit | ||
Employability Skills | This unit contains employability skills | ||
Learning Outcomes and Application | This unit applies to operators who shut down and bank steam boiler/s in the pulp and paper industry. This work typically involves complex integrated equipment and continuous operationsThis unit generally applies to those who:prepare boiler for shutdownconduct boiler inspection and maintenancestore boiler in shutdown moderespond to unplanned or emergency shutdowns, andrecord and report shutdown datato meet safety, quality and productivity requirementsIt does not include managing steam boiler startup, monitoring and controlling boiler operation or troubleshooting and rectifying boiler plant systems | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Not Applicable | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare boiler for shutdown |
| |||||||
Element: Conduct boiler inspection and maintenance |
| |||||||
Element: Store boiler in shutdown mode |
| |||||||
Element: Respond to unplanned or emergency shutdowns |
| |||||||
Element: Record and report shutdown data |
|