Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

ICPCBF218 Mapping and Delivery Guide
Produce basic folded and glued cartons

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency ICPCBF218 - Produce basic folded and glued cartons
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to produce basic folded and glued cartons and correctly shut down machinery when the job is completed.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the converting, binding and finishing field of work and include access to special purpose tools, equipment and materials, as well as one of these machines:

Royal 40

Bobst Media

Bobst Domino.

Assessors must satisfy NVR/AQTF assessor requirements.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Maintain operation of carton blank system
  • Feeder is monitored and adjusted to ensure continuous and efficient feeding to machine
  • Carton blank pick-up and transport system is monitored and adjusted to ensure accurate and continuous carton blank handling and efficient operation
  • Transfer systems are monitored and adjusted to ensure correct and continuous carton blank handling and efficient operation
  • Delivery is monitored and adjusted to ensure quality and efficient product delivery
       
Element: Maintain basic gluing and continuous folding process
  • Registration and squareness of fold are monitored and adjusted to ensure quality of product meets approved sample standard
  • Registration of gluing is monitored and adjusted to ensure quality of product meets approved sample standard
  • Adhesion is monitored and adjusted to ensure quality meets approved sample standard
       
Element: Maintain production process
  • Production process is operated in association with fellow workers and according to enterprise procedures and planned daily schedule
  • Production is maintained according to work health and safety (WHS) requirements, manufacturer’s specifications and enterprise procedures
  • Performance is monitored and verified using the process control system according to enterprise procedures
  • Production difficulties are anticipated and preventive action taken to prevent occurrence by timely intervention
  • Process adjustments to eliminate problems are reported according to enterprise procedures
  • Faulty performance of equipment is identified and reported according to enterprise procedures
  • Waste is sorted according to procedures
       
Element: Identify and rectify minor problems
  • Problems in folding operation are identified and reported according to enterprise procedures
  • Adjustments or corrections are carried out according to enterprise procedures
  • Folding is checked to ensure correct operation
  • Problems in gluing unit are identified and reported according to enterprise requirements
  • Adjustments or corrections are carried out according to enterprise procedures, and consistent with operator’s skill level
  • Gluing unit operation is checked to ensure correct operation
       
Element: Conduct shutdown of production process
  • Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures
  • Shutdown is conducted in association with fellow workers and in compliance with WHS requirements
  • Glue system is washed ready for next run and liquid waste is disposed of according to regulatory requirements and enterprise procedures
  • Waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures
  • Machine faults requiring repair are identified and reported to designated person, according to enterprise procedures
  • Repair/adjustment is verified prior to resumption of operations
  • Production records or other documentation are accurately completed where required by enterprise procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Maintain operation of carton blank system

1.1 Feeder is monitored and adjusted to ensure continuous and efficient feeding to machine

1.2 Carton blank pick-up and transport system is monitored and adjusted to ensure accurate and continuous carton blank handling and efficient operation

1.3 Transfer systems are monitored and adjusted to ensure correct and continuous carton blank handling and efficient operation

1.4 Delivery is monitored and adjusted to ensure quality and efficient product delivery

2. Maintain basic gluing and continuous folding process

2.1 Registration and squareness of fold are monitored and adjusted to ensure quality of product meets approved sample standard

2.2 Registration of gluing is monitored and adjusted to ensure quality of product meets approved sample standard

2.3 Adhesion is monitored and adjusted to ensure quality meets approved sample standard

3. Maintain production process

3.1 Production process is operated in association with fellow workers and according to enterprise procedures and planned daily schedule

3.2 Production is maintained according to work health and safety (WHS) requirements, manufacturer’s specifications and enterprise procedures

3.3 Performance is monitored and verified using the process control system according to enterprise procedures

3.4 Production difficulties are anticipated and preventive action taken to prevent occurrence by timely intervention

3.5 Process adjustments to eliminate problems are reported according to enterprise procedures

3.6 Faulty performance of equipment is identified and reported according to enterprise procedures

3.7 Waste is sorted according to procedures

4. Identify and rectify minor problems

4.1 Problems in folding operation are identified and reported according to enterprise procedures

4.2 Adjustments or corrections are carried out according to enterprise procedures

4.3 Folding is checked to ensure correct operation

4.4 Problems in gluing unit are identified and reported according to enterprise requirements

4.5 Adjustments or corrections are carried out according to enterprise procedures, and consistent with operator’s skill level

4.6 Gluing unit operation is checked to ensure correct operation

5. Conduct shutdown of production process

5.1 Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures

5.2 Shutdown is conducted in association with fellow workers and in compliance with WHS requirements

5.3 Glue system is washed ready for next run and liquid waste is disposed of according to regulatory requirements and enterprise procedures

5.4 Waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures

5.5 Machine faults requiring repair are identified and reported to designated person, according to enterprise procedures

5.6 Repair/adjustment is verified prior to resumption of operations

5.7 Production records or other documentation are accurately completed where required by enterprise procedures

Evidence of the ability to:

produce at least FOUR simple straight line folded and glued cartons of different sizes and weights according to manufacturer’s and job specifications and enterprise procedures on one of the following machines:

Royal 40

Bobst Media

Bobst Domino.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify the work health and safety factors for:

setting and/or operating machine delivery systems

using the folder/gluer machine

adjusting/correcting the machine

cleaning the machine

identify areas of the sheet-fed feeder that need to be monitored to ensure trouble-free operation

list checks to be undertaken when substrate is removed from the machine

identify areas to continually observe to ensure smooth trouble-free operation of the machine

list causes of out-of-square folding and how each can be corrected

identify segments of quality assurance that are inspected at completion of the sample run, and changes required to production to ensure client requirements are met

list part(s) of the machine that can be adjusted if carton blanks are creasing

determine factors that cause poor glue adhesion on cartons, and requirements to adjust glue application

list important tasks to correctly shut down the machine

list tasks to prepare the finished work for dispatch

identify areas of the machine that need regular cleaning, and materials that need to be cleaned from the machine

identify requirements to keep the machine clear of surface rust (condensation)

list factors that determine a quality product in a completed folded job

identify machine manuals and safety documentation relevant to this task, where they are kept, and the information included in them.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Maintain operation of carton blank system

1.1 Feeder is monitored and adjusted to ensure continuous and efficient feeding to machine

1.2 Carton blank pick-up and transport system is monitored and adjusted to ensure accurate and continuous carton blank handling and efficient operation

1.3 Transfer systems are monitored and adjusted to ensure correct and continuous carton blank handling and efficient operation

1.4 Delivery is monitored and adjusted to ensure quality and efficient product delivery

2. Maintain basic gluing and continuous folding process

2.1 Registration and squareness of fold are monitored and adjusted to ensure quality of product meets approved sample standard

2.2 Registration of gluing is monitored and adjusted to ensure quality of product meets approved sample standard

2.3 Adhesion is monitored and adjusted to ensure quality meets approved sample standard

3. Maintain production process

3.1 Production process is operated in association with fellow workers and according to enterprise procedures and planned daily schedule

3.2 Production is maintained according to work health and safety (WHS) requirements, manufacturer’s specifications and enterprise procedures

3.3 Performance is monitored and verified using the process control system according to enterprise procedures

3.4 Production difficulties are anticipated and preventive action taken to prevent occurrence by timely intervention

3.5 Process adjustments to eliminate problems are reported according to enterprise procedures

3.6 Faulty performance of equipment is identified and reported according to enterprise procedures

3.7 Waste is sorted according to procedures

4. Identify and rectify minor problems

4.1 Problems in folding operation are identified and reported according to enterprise procedures

4.2 Adjustments or corrections are carried out according to enterprise procedures

4.3 Folding is checked to ensure correct operation

4.4 Problems in gluing unit are identified and reported according to enterprise requirements

4.5 Adjustments or corrections are carried out according to enterprise procedures, and consistent with operator’s skill level

4.6 Gluing unit operation is checked to ensure correct operation

5. Conduct shutdown of production process

5.1 Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures

5.2 Shutdown is conducted in association with fellow workers and in compliance with WHS requirements

5.3 Glue system is washed ready for next run and liquid waste is disposed of according to regulatory requirements and enterprise procedures

5.4 Waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures

5.5 Machine faults requiring repair are identified and reported to designated person, according to enterprise procedures

5.6 Repair/adjustment is verified prior to resumption of operations

5.7 Production records or other documentation are accurately completed where required by enterprise procedures

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Feeder is monitored and adjusted to ensure continuous and efficient feeding to machine 
Carton blank pick-up and transport system is monitored and adjusted to ensure accurate and continuous carton blank handling and efficient operation 
Transfer systems are monitored and adjusted to ensure correct and continuous carton blank handling and efficient operation 
Delivery is monitored and adjusted to ensure quality and efficient product delivery 
Registration and squareness of fold are monitored and adjusted to ensure quality of product meets approved sample standard 
Registration of gluing is monitored and adjusted to ensure quality of product meets approved sample standard 
Adhesion is monitored and adjusted to ensure quality meets approved sample standard 
Production process is operated in association with fellow workers and according to enterprise procedures and planned daily schedule 
Production is maintained according to work health and safety (WHS) requirements, manufacturer’s specifications and enterprise procedures 
Performance is monitored and verified using the process control system according to enterprise procedures 
Production difficulties are anticipated and preventive action taken to prevent occurrence by timely intervention 
Process adjustments to eliminate problems are reported according to enterprise procedures 
Faulty performance of equipment is identified and reported according to enterprise procedures 
Waste is sorted according to procedures 
Problems in folding operation are identified and reported according to enterprise procedures 
Adjustments or corrections are carried out according to enterprise procedures 
Folding is checked to ensure correct operation 
Problems in gluing unit are identified and reported according to enterprise requirements 
Adjustments or corrections are carried out according to enterprise procedures, and consistent with operator’s skill level 
Gluing unit operation is checked to ensure correct operation 
Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures 
Shutdown is conducted in association with fellow workers and in compliance with WHS requirements 
Glue system is washed ready for next run and liquid waste is disposed of according to regulatory requirements and enterprise procedures 
Waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures 
Machine faults requiring repair are identified and reported to designated person, according to enterprise procedures 
Repair/adjustment is verified prior to resumption of operations 
Production records or other documentation are accurately completed where required by enterprise procedures 

Forms

Assessment Cover Sheet

ICPCBF218 - Produce basic folded and glued cartons
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICPCBF218 - Produce basic folded and glued cartons

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: