Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

ICPSCP215 Mapping and Delivery Guide
Prepare screen

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency ICPSCP215 - Prepare screen
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to safely select and prepare screens for printing using appropriate equipment and procedures.It applies to individuals working under direct supervision and performing mainly routine tasks.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the screen printing field of work and include access to:

chemicals

tools and equipment

mesh

frames.

Assessors must satisfy NVR/AQTF assessor requirements.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Select frame
  • Frame is selected according to job specifications
  • Quality, type and finish of frame are specified
       
Element: Prepare frame
  • Frame surface is appropriately prepared free of imperfections to receive mesh
  • Tools and equipment used in frame preparation are suitable to achieve standard indicated in job specifications
       
Element: Select mesh
  • Required mesh type is selected according to job specifications
  • Imperfections and flaws are identified and appropriate remedial action is taken
  • Mesh is measured and cut from bulk supply to meet screen specifications with minimum wastage
       
Element: Stretch and fix mesh
  • Mesh is positioned in tensioning equipment at correct angle according to job specifications
  • Tension is set and applied according to job specifications
  • Tension is checked according to manufacturer or supplier specifications
  • Mesh is pre-stretched prior to fixing and mesh is fixed to frame according to frame construction requirements
  • Chemicals are mixed for application according to manufacturer specifications
  • Screen is removed from apparatus after appropriate curing
       
Element: Convert mesh
  • Chemicals are selected for conversion of mesh according to manufacturer or supplier specifications
  • Chemicals are applied to effect conversion according to manufacturer or supplier specifications and to work health and safety (WHS) requirements
       
Element: Store screen
  • Screens are identified and labelled
  • Screens are stored in safe, clean and dry environment in subdued light
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 Select frame

1.1 Frame is selected according to job specifications

1.2 Quality, type and finish of frame are specified

2 Prepare frame

2.1 Frame surface is appropriately prepared free of imperfections to receive mesh

2.2 Tools and equipment used in frame preparation are suitable to achieve standard indicated in job specifications

3 Select mesh

3.1 Required mesh type is selected according to job specifications

3.2 Imperfections and flaws are identified and appropriate remedial action is taken

3.3 Mesh is measured and cut from bulk supply to meet screen specifications with minimum wastage

4 Stretch and fix mesh

4.1 Mesh is positioned in tensioning equipment at correct angle according to job specifications

4.2 Tension is set and applied according to job specifications

4.3 Tension is checked according to manufacturer or supplier specifications

4.4 Mesh is pre-stretched prior to fixing and mesh is fixed to frame according to frame construction requirements

4.5 Chemicals are mixed for application according to manufacturer specifications

4.6 Screen is removed from apparatus after appropriate curing

5 Convert mesh

5.1 Chemicals are selected for conversion of mesh according to manufacturer or supplier specifications

5.2 Chemicals are applied to effect conversion according to manufacturer or supplier specifications and to work health and safety (WHS) requirements

6 Store screen

6.1 Screens are identified and labelled

6.2 Screens are stored in safe, clean and dry environment in subdued light

Evidence of the ability to:

select TWO different screen frame types, either fixed or microchase, stretch and fix mesh as appropriate and prepare screen for stencil application, according to manufacturer and job specifications, enterprise procedures and work health and safety (WHS) requirements.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

explain why a frame is needed and how a particular frame is selected

list the tools needed to prepare the frame surface

describe what to look for to achieve a good surface for mesh adhesion

list different mesh types and explain what type of job each mesh type would be suited to

describe common flaws or imperfections in screen mesh, how to identify them and what to do about them

explain techniques used to minimise wastage when cutting mesh

explain the position that the mesh is placed in before tensioning

explain the methods of pre-stretching the mesh prior to securing it

describe how tension is measured

describe the various methods of fixing mesh to frame

identify the pre-tensioning techniques that can be used

describe the methods for converting screen mesh chemically and mechanically

explain the method used to identify the mesh on a screen

describe the ideal conditions for storing screens

identify manuals, safety and other documentation relevant to this task, where they are kept and the information included in these documents.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 Select frame

1.1 Frame is selected according to job specifications

1.2 Quality, type and finish of frame are specified

2 Prepare frame

2.1 Frame surface is appropriately prepared free of imperfections to receive mesh

2.2 Tools and equipment used in frame preparation are suitable to achieve standard indicated in job specifications

3 Select mesh

3.1 Required mesh type is selected according to job specifications

3.2 Imperfections and flaws are identified and appropriate remedial action is taken

3.3 Mesh is measured and cut from bulk supply to meet screen specifications with minimum wastage

4 Stretch and fix mesh

4.1 Mesh is positioned in tensioning equipment at correct angle according to job specifications

4.2 Tension is set and applied according to job specifications

4.3 Tension is checked according to manufacturer or supplier specifications

4.4 Mesh is pre-stretched prior to fixing and mesh is fixed to frame according to frame construction requirements

4.5 Chemicals are mixed for application according to manufacturer specifications

4.6 Screen is removed from apparatus after appropriate curing

5 Convert mesh

5.1 Chemicals are selected for conversion of mesh according to manufacturer or supplier specifications

5.2 Chemicals are applied to effect conversion according to manufacturer or supplier specifications and to work health and safety (WHS) requirements

6 Store screen

6.1 Screens are identified and labelled

6.2 Screens are stored in safe, clean and dry environment in subdued light

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Frame is selected according to job specifications 
Quality, type and finish of frame are specified 
Frame surface is appropriately prepared free of imperfections to receive mesh 
Tools and equipment used in frame preparation are suitable to achieve standard indicated in job specifications 
Required mesh type is selected according to job specifications 
Imperfections and flaws are identified and appropriate remedial action is taken 
Mesh is measured and cut from bulk supply to meet screen specifications with minimum wastage 
Mesh is positioned in tensioning equipment at correct angle according to job specifications 
Tension is set and applied according to job specifications 
Tension is checked according to manufacturer or supplier specifications 
Mesh is pre-stretched prior to fixing and mesh is fixed to frame according to frame construction requirements 
Chemicals are mixed for application according to manufacturer specifications 
Screen is removed from apparatus after appropriate curing 
Chemicals are selected for conversion of mesh according to manufacturer or supplier specifications 
Chemicals are applied to effect conversion according to manufacturer or supplier specifications and to work health and safety (WHS) requirements 
Screens are identified and labelled 
Screens are stored in safe, clean and dry environment in subdued light 

Forms

Assessment Cover Sheet

ICPSCP215 - Prepare screen
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICPSCP215 - Prepare screen

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: