Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

ICPSCP339 Mapping and Delivery Guide
Prepare stencil using direct projection method

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency ICPSCP339 - Prepare stencil using direct projection method
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to select, prepare, process and store photographic capillary stencils.It applies to individuals working in the printing and graphic arts industry who may have to set up and operate power-driven or hand-operated screen printing machines, and who may have to provide leadership and guidance to others and have some limited responsibility for the output of others.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the screen printing field of work and include access to direct electronic imaging equipment.

Assessors must satisfy NVR/AQTF assessor requirements.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare work area
  • Work area is made clean and functional prior to commencement of work
  • Equipment is inspected to ensure it is functional and, where necessary, appropriate remedial action is taken prior to commencement of work
  • Chemicals are prepared, if necessary, according to work health and safety (WHS) requirements and manufacturer or supplier specifications
  • Appropriate coating trough (or troughs for automatic coaters) is selected, ensuring it is free of nicks and burrs
       
Element: Prepare screen
  • Screen is selected according to job specifications
  • Chemicals are applied and removed according to WHS requirements and manufacturer or supplier specifications
       
Element: Select emulsion
  • Emulsion is selected according to requirements for ink type, print resolution, substrate, mesh type and machine type with minimisation of waste
  • Emulsion is checked for expiry date and appropriate action taken
  • Emulsion is prepared according to WHS requirements, and manufacturer or supplier specifications
  • Emulsion is used and dried according to manufacturer or supplier specifications
       
Element: Process material
  • Coated screen is positioned on projection frame holder according to manufacturer or supplier specifications
  • Projection light source equipment is positioned according to manufacturer or supplier specifications
  • Positive is positioned into projection light source which is then set to desired enlargement according to manufacturer or supplier specifications
  • Exposed screen is removed from positioning frame according to WHS requirements and manufacturer or supplier specifications
  • Exposed screen is washed out according to WHS requirements and manufacturer or supplier specifications
  • Processed stencil or screen is inspected for processing flaws
       
Element: Dry stencil
  • Processed stencil is dried according to manufacturer or supplier specifications
  • Backing sheet is carefully removed and stencil checked for full adhesion
       
Element: Block out screen
  • Non-image areas of prepared screen are blocked out with filler suitable for ink type and according to job specifications
  • Stencil is inspected for flaws, scum and orientation
  • Pinholes are spotted out with suitable filler and taped according to ink type and job specifications
       
Element: Store screen
  • Prepared screen is labelled according to enterprise specifications
  • Prepared screen is stored in clean, dry environment according to manufacturer or supplier specifications
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 Prepare work area

1.1 Work area is made clean and functional prior to commencement of work

1.2 Equipment is inspected to ensure it is functional and, where necessary, appropriate remedial action is taken prior to commencement of work

1.3 Chemicals are prepared, if necessary, according to work health and safety (WHS) requirements and manufacturer or supplier specifications

1.4 Appropriate coating trough (or troughs for automatic coaters) is selected, ensuring it is free of nicks and burrs

2 Prepare screen

2.1 Screen is selected according to job specifications

2.2 Chemicals are applied and removed according to WHS requirements and manufacturer or supplier specifications

3 Select emulsion

3.1 Emulsion is selected according to requirements for ink type, print resolution, substrate, mesh type and machine type with minimisation of waste

3.2 Emulsion is checked for expiry date and appropriate action taken

3.3 Emulsion is prepared according to WHS requirements, and manufacturer or supplier specifications

3.4 Emulsion is used and dried according to manufacturer or supplier specifications

4 Process material

4.1 Coated screen is positioned on projection frame holder according to manufacturer or supplier specifications

4.2 Projection light source equipment is positioned according to manufacturer or supplier specifications

4.3 Positive is positioned into projection light source which is then set to desired enlargement according to manufacturer or supplier specifications

4.4 Exposed screen is removed from positioning frame according to WHS requirements and manufacturer or supplier specifications

4.5 Exposed screen is washed out according to WHS requirements and manufacturer or supplier specifications

4.6 Processed stencil or screen is inspected for processing flaws

5 Dry stencil

5.1 Processed stencil is dried according to manufacturer or supplier specifications

5.2 Backing sheet is carefully removed and stencil checked for full adhesion

6 Block out screen

6.1 Non-image areas of prepared screen are blocked out with filler suitable for ink type and according to job specifications

6.2 Stencil is inspected for flaws, scum and orientation

6.3 Pinholes are spotted out with suitable filler and taped according to ink type and job specifications

7 Store screen

7.1 Prepared screen is labelled according to enterprise specifications

7.2 Prepared screen is stored in clean, dry environment according to manufacturer or supplier specifications

Evidence of the ability to:

safely prepare TWO different screens using the direct projection method according to all job, manufacturer, enterprise and work health and safety (WHS) requirements.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify the influence that mesh count has on final printed product

explain the importance of correctly tensioned screen and describe the tension that is required on screens of various mesh count or grades

describe the degreasing or cleaning techniques that are employed prior to coating the screen

summarise the information contained in the material safety data sheet (MSDS) about emulsion

discuss the pollution and environmental issues that need to be considered when working with emulsions

identify the maintenance that is required on the direct projection camera

outline the importance of working in a safelight area when using the direct projection method

describe the kinds of high sensitivity emulsions that are available and explain their characteristics, lifespans and areas of use, including the preparation method for the emulsion being used

identify the influence that length of run and ink being used have on the coating technique

identify the number of coats of emulsion and the best method of coating the screen, as well as the best position (horizontal or vertical) for drying the screen to prevent scum and streaking

identify the effect of heat on the emulsion during the drying process

outline health and safety concerns when exposing the screen

describe the operating features of the direct projection camera

explain how to set the enlargement factor and take into account registration on the frame for the appropriate printing machine

describe the exposure techniques and procedures that are used and how to calculate exposure time

identify the effect of temperature, pressure and period of washing on the emulsion, including how to determine when washing out is complete

outline the post-curing effect on the stencil

summarise the information that is obtained from the MSDSs for a particular blockout

explain how ink and stencil type influence the choice of blockout

outline the preventive measures that can be taken to minimise pinholes and the importance of taping the edge of the frame

describe how a screen can be identified at a later date

identify required manuals, safety and other documentation and briefly outline the relevant information in each source.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 Prepare work area

1.1 Work area is made clean and functional prior to commencement of work

1.2 Equipment is inspected to ensure it is functional and, where necessary, appropriate remedial action is taken prior to commencement of work

1.3 Chemicals are prepared, if necessary, according to work health and safety (WHS) requirements and manufacturer or supplier specifications

1.4 Appropriate coating trough (or troughs for automatic coaters) is selected, ensuring it is free of nicks and burrs

2 Prepare screen

2.1 Screen is selected according to job specifications

2.2 Chemicals are applied and removed according to WHS requirements and manufacturer or supplier specifications

3 Select emulsion

3.1 Emulsion is selected according to requirements for ink type, print resolution, substrate, mesh type and machine type with minimisation of waste

3.2 Emulsion is checked for expiry date and appropriate action taken

3.3 Emulsion is prepared according to WHS requirements, and manufacturer or supplier specifications

3.4 Emulsion is used and dried according to manufacturer or supplier specifications

4 Process material

4.1 Coated screen is positioned on projection frame holder according to manufacturer or supplier specifications

4.2 Projection light source equipment is positioned according to manufacturer or supplier specifications

4.3 Positive is positioned into projection light source which is then set to desired enlargement according to manufacturer or supplier specifications

4.4 Exposed screen is removed from positioning frame according to WHS requirements and manufacturer or supplier specifications

4.5 Exposed screen is washed out according to WHS requirements and manufacturer or supplier specifications

4.6 Processed stencil or screen is inspected for processing flaws

5 Dry stencil

5.1 Processed stencil is dried according to manufacturer or supplier specifications

5.2 Backing sheet is carefully removed and stencil checked for full adhesion

6 Block out screen

6.1 Non-image areas of prepared screen are blocked out with filler suitable for ink type and according to job specifications

6.2 Stencil is inspected for flaws, scum and orientation

6.3 Pinholes are spotted out with suitable filler and taped according to ink type and job specifications

7 Store screen

7.1 Prepared screen is labelled according to enterprise specifications

7.2 Prepared screen is stored in clean, dry environment according to manufacturer or supplier specifications

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work area is made clean and functional prior to commencement of work 
Equipment is inspected to ensure it is functional and, where necessary, appropriate remedial action is taken prior to commencement of work 
Chemicals are prepared, if necessary, according to work health and safety (WHS) requirements and manufacturer or supplier specifications 
Appropriate coating trough (or troughs for automatic coaters) is selected, ensuring it is free of nicks and burrs 
Screen is selected according to job specifications 
Chemicals are applied and removed according to WHS requirements and manufacturer or supplier specifications 
Emulsion is selected according to requirements for ink type, print resolution, substrate, mesh type and machine type with minimisation of waste 
Emulsion is checked for expiry date and appropriate action taken 
Emulsion is prepared according to WHS requirements, and manufacturer or supplier specifications 
Emulsion is used and dried according to manufacturer or supplier specifications 
Coated screen is positioned on projection frame holder according to manufacturer or supplier specifications 
Projection light source equipment is positioned according to manufacturer or supplier specifications 
Positive is positioned into projection light source which is then set to desired enlargement according to manufacturer or supplier specifications 
Exposed screen is removed from positioning frame according to WHS requirements and manufacturer or supplier specifications 
Exposed screen is washed out according to WHS requirements and manufacturer or supplier specifications 
Processed stencil or screen is inspected for processing flaws 
Processed stencil is dried according to manufacturer or supplier specifications 
Backing sheet is carefully removed and stencil checked for full adhesion 
Non-image areas of prepared screen are blocked out with filler suitable for ink type and according to job specifications 
Stencil is inspected for flaws, scum and orientation 
Pinholes are spotted out with suitable filler and taped according to ink type and job specifications 
Prepared screen is labelled according to enterprise specifications 
Prepared screen is stored in clean, dry environment according to manufacturer or supplier specifications 

Forms

Assessment Cover Sheet

ICPSCP339 - Prepare stencil using direct projection method
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICPSCP339 - Prepare stencil using direct projection method

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: