Unit of Competency ICTCBL312 - Cutover new systems and equipment on customer premises
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to cutover new or upgraded systems and equipment on a customer premises. This may include indoor or outdoor installations of communications applications in telephony, broadband, data, video, radio frequency (RF) equipment, security and computer networks, including local area networks (LAN), wide area networks (WAN) and multimedia systems. It applies to telecommunications trade workers carrying out new or upgrades of domestic, commercial or industrial systems and equipment at a customer's premises.Work functions in the occupational areas where this unit may be used are subject to regulatory requirements. Refer to the Implementation Guide Companion Volume or the relevant regulator for specific guidance on requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – cabling field of work and include access to:

a site where installation of customer premises equipment may be conducted

plant, tools and equipment currently used in industry

relevant regulatory and equipment documentation that impacts on work activities.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare system and equipment cutover
  • Obtain relevant legislation, codes, regulations and standards
  • Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements
  • Notify appropriate personnel of identified safety hazards at worksite
  • Determine cable route and type of cable and equipment from project plan, and identify and avoid other services
  • Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently
  • Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval
  • Notify customer and network carrier of proposed cutover details and arrange for customer representation
       
Element: Cutover system or equipment into service
  • Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work
  • Test all cable connections, equipment and facilities as instructed in technical manuals and specifications
  • Evaluate test results to ensure proper system operation and performance, and rectify if required
       
Element: Complete project documentation
  • Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements
  • Recover obsolete materials and equipment, and return to appropriate point for disposal
  • Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction
  • Notify appropriate personnel of job completion and obtain sign off
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare system and equipment cutover

1.1 Obtain relevant legislation, codes, regulations and standards

1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

1.3 Notify appropriate personnel of identified safety hazards at worksite

1.4 Determine cable route and type of cable and equipment from project plan, and identify and avoid other services

1.5 Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently

1.6 Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval

1.7 Notify customer and network carrier of proposed cutover details and arrange for customer representation

2. Cutover system or equipment into service

2.1 Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work

2.2 Test all cable connections, equipment and facilities as instructed in technical manuals and specifications

2.3 Evaluate test results to ensure proper system operation and performance, and rectify if required

3. Complete project documentation

3.1 Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements

3.2 Recover obsolete materials and equipment, and return to appropriate point for disposal

3.3 Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction

3.4 Notify appropriate personnel of job completion and obtain sign off

Evidence of the ability to:

read and interpret plans and specifications

develop and implement a cutover work plan

install customer premises equipment

configure and test systems and equipment

apply relevant regulations and standards.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify and select cabling types, connectors and cabling structures

describe the legislation, codes of practice and other formal agreements that impact on the work activity

describe the manufacturer’s requirements for safe operation of equipment

explain the equipment requiring cutover at the customer's premises

specify the health and safety requirements relating to the activity and site conditions

identify and select the test methods and performance requirements

describe the features and operating requirements of test equipment for cutover

identify typical issues and challenges that occur on the worksite.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare system and equipment cutover

1.1 Obtain relevant legislation, codes, regulations and standards

1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

1.3 Notify appropriate personnel of identified safety hazards at worksite

1.4 Determine cable route and type of cable and equipment from project plan, and identify and avoid other services

1.5 Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently

1.6 Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval

1.7 Notify customer and network carrier of proposed cutover details and arrange for customer representation

2. Cutover system or equipment into service

2.1 Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work

2.2 Test all cable connections, equipment and facilities as instructed in technical manuals and specifications

2.3 Evaluate test results to ensure proper system operation and performance, and rectify if required

3. Complete project documentation

3.1 Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements

3.2 Recover obsolete materials and equipment, and return to appropriate point for disposal

3.3 Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction

3.4 Notify appropriate personnel of job completion and obtain sign off

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain relevant legislation, codes, regulations and standards 
Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements 
Notify appropriate personnel of identified safety hazards at worksite 
Determine cable route and type of cable and equipment from project plan, and identify and avoid other services 
Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently 
Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval 
Notify customer and network carrier of proposed cutover details and arrange for customer representation 
Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work 
Test all cable connections, equipment and facilities as instructed in technical manuals and specifications 
Evaluate test results to ensure proper system operation and performance, and rectify if required 
Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements 
Recover obsolete materials and equipment, and return to appropriate point for disposal 
Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction 
Notify appropriate personnel of job completion and obtain sign off 

Forms

Assessment Cover Sheet

ICTCBL312 - Cutover new systems and equipment on customer premises
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTCBL312 - Cutover new systems and equipment on customer premises

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: