ICTCBL313 Mapping and Delivery Guide
Modify and cutover cable

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency ICTCBL313 - Modify and cutover cable
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to modify an infrastructure to cutover new cables into an existing indoor and outdoor, domestic, commercial or industrial cabling installation including communications applications in telephony, broadband, data, video, radio frequency (RF) equipment, security and computer networks, including local area networks (LAN), wide area networks (WAN) and multimedia. It applies to field officers, technicians or lineman installers from carriers, contractors or other service providers who upgrade coaxial or optical fibre cables as part of a hybrid fibre coaxial (HFC) network, a broadband access network or a large client private network. Work functions in the occupational areas where this unit may be used are subject to regulatory requirements. Refer to the Implementation Guide Companion Volume or the relevant regulator for specific guidance on requirements.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – cabling field of work and include access to:

systems and equipment involving cutover

installation equipment currently used in industry

relevant regulatory and equipment documentation that impacts on work activities.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for cable modification and cutover
  • Obtain relevant legislation, codes, regulations and standards for given work
  • Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements
  • Notify appropriate personnel of identified safety hazards at worksite
  • Determine cable route and type of cable from project plan, and identify and avoid other services
  • Obtain plant, tools and safety equipment and material to perform tasks safely and efficiently
  • Prepare implementation plan with cutover tasks based on identified nature of job and seek client approval
  • Notify client and network carrier of proposed cutover details and proposed disruption to services
  • Undertake additional preparatory non-jointing work, as required, according to enterprise guidelines and site conditions
  • Select labour support required according to cutover tasks and available skills
  • Select technical equipment for cutover to suit materials being used, cable type and joint enclosure
       
Element: Joint and cutover cable
  • Follow work health and safety (WHS) and environmental requirements for given work
  • Joint cable according to sequencing plan, materials, joint type, location, and enterprise and manufacturer’s guidelines
  • Test cable for performance and rectify any faults relating to cutover according to location, materials available and industry practice
  • Seal all joints according to cable type, location, and enterprise and manufacturer’s guidelines
       
Element: Complete project documentation
  • Record test results for future reference, complete reports on cutover installation and design amendments to reflect existing cable layout according to enterprise requirements
  • Recover obsolete materials and return to appropriate point for disposal
  • Restore siteaccording to requirements of enterprise or approving authority and to client satisfaction
  • Notify appropriate personnel completion of cutover and obtain sign off
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for cable modification and cutover

1.1 Obtain relevant legislation, codes, regulations and standards for given work

1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

1.3 Notify appropriate personnel of identified safety hazards at worksite

1.4 Determine cable route and type of cable from project plan, and identify and avoid other services

1.5 Obtain plant, tools and safety equipment and material to perform tasks safely and efficiently

1.6 Prepare implementation plan with cutover tasks based on identified nature of job and seek client approval

1.7 Notify client and network carrier of proposed cutover details and proposed disruption to services

1.8 Undertake additional preparatory non-jointing work, as required, according to enterprise guidelines and site conditions

1.9 Select labour support required according to cutover tasks and available skills

1.10 Select technical equipment for cutover to suit materials being used, cable type and joint enclosure

2. Joint and cutover cable

2.1 Follow work health and safety (WHS) and environmental requirements for given work

2.2 Joint cable according to sequencing plan, materials, joint type, location, and enterprise and manufacturer’s guidelines

2.3 Test cable for performance and rectify any faults relating to cutover according to location, materials available and industry practice

2.4 Seal all joints according to cable type, location, and enterprise and manufacturer’s guidelines

3. Complete project documentation

3.1 Record test results for future reference, complete reports on cutover installation and design amendments to reflect existing cable layout according to enterprise requirements

3.2 Recover obsolete materials and return to appropriate point for disposal

3.3 Restore siteaccording to requirements of enterprise or approving authority and to client satisfaction

3.4 Notify appropriate personnel completion of cutover and obtain sign off

Evidence of the ability to:

prepare for cutover

rearrange cable

conduct tests to determine success of cutover

interpret results and rectify faults occurring as a result of cutover

apply regulations and standards related to the cable rearrangement

comply with all related health and safety requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

recognise cabling types, connectors and cabling structures

describe legislation, codes of practice and other formal agreements that impact on the work activity

describe the manufacturer’s requirements for safe operation of equipment

explain how the cutover of cable is performed on the client's equipment

specify the health and safety requirements relating to the activity and site conditions

describe the test methods and performance requirements

describe the features and operating requirements of test equipment

Identify typical issues and challenges that occur on the worksite

describe the purpose of warranties and service level agreements (SLA).


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for cable modification and cutover

1.1 Obtain relevant legislation, codes, regulations and standards for given work

1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

1.3 Notify appropriate personnel of identified safety hazards at worksite

1.4 Determine cable route and type of cable from project plan, and identify and avoid other services

1.5 Obtain plant, tools and safety equipment and material to perform tasks safely and efficiently

1.6 Prepare implementation plan with cutover tasks based on identified nature of job and seek client approval

1.7 Notify client and network carrier of proposed cutover details and proposed disruption to services

1.8 Undertake additional preparatory non-jointing work, as required, according to enterprise guidelines and site conditions

1.9 Select labour support required according to cutover tasks and available skills

1.10 Select technical equipment for cutover to suit materials being used, cable type and joint enclosure

2. Joint and cutover cable

2.1 Follow work health and safety (WHS) and environmental requirements for given work

2.2 Joint cable according to sequencing plan, materials, joint type, location, and enterprise and manufacturer’s guidelines

2.3 Test cable for performance and rectify any faults relating to cutover according to location, materials available and industry practice

2.4 Seal all joints according to cable type, location, and enterprise and manufacturer’s guidelines

3. Complete project documentation

3.1 Record test results for future reference, complete reports on cutover installation and design amendments to reflect existing cable layout according to enterprise requirements

3.2 Recover obsolete materials and return to appropriate point for disposal

3.3 Restore siteaccording to requirements of enterprise or approving authority and to client satisfaction

3.4 Notify appropriate personnel completion of cutover and obtain sign off

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain relevant legislation, codes, regulations and standards for given work 
Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements 
Notify appropriate personnel of identified safety hazards at worksite 
Determine cable route and type of cable from project plan, and identify and avoid other services 
Obtain plant, tools and safety equipment and material to perform tasks safely and efficiently 
Prepare implementation plan with cutover tasks based on identified nature of job and seek client approval 
Notify client and network carrier of proposed cutover details and proposed disruption to services 
Undertake additional preparatory non-jointing work, as required, according to enterprise guidelines and site conditions 
Select labour support required according to cutover tasks and available skills 
Select technical equipment for cutover to suit materials being used, cable type and joint enclosure 
Follow work health and safety (WHS) and environmental requirements for given work 
Joint cable according to sequencing plan, materials, joint type, location, and enterprise and manufacturer’s guidelines 
Test cable for performance and rectify any faults relating to cutover according to location, materials available and industry practice 
Seal all joints according to cable type, location, and enterprise and manufacturer’s guidelines 
Record test results for future reference, complete reports on cutover installation and design amendments to reflect existing cable layout according to enterprise requirements 
Recover obsolete materials and return to appropriate point for disposal 
Restore siteaccording to requirements of enterprise or approving authority and to client satisfaction 
Notify appropriate personnel completion of cutover and obtain sign off 

Forms

Assessment Cover Sheet

ICTCBL313 - Modify and cutover cable
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTCBL313 - Modify and cutover cable

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: