ICTPMG403 Mapping and Delivery Guide
Manage the delivery of network infrastructure

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency ICTPMG403 - Manage the delivery of network infrastructure
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to manage the delivery of network infrastructure, including scoping the project, developing a project brief, managing the project and directing the activities of installation staff, building workers, contractors, manufacturers and vendors.It applies to individuals who work in appropriate project management roles associated with access and core networks, including switching and transmission via optical fibre, radio, microwave and satellite.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – project management field of work and include access to:

sites on which projects may be conducted

relevant databases, legislative requirements and other project related documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Scope network infrastructure requirements
  • Determine requirements of project from client and approved network plan
  • Assess current access network conditions to determine existing network capacity and capability
  • Analyse site survey data and geographical information where necessary to assess suitability of site to design requirements
  • Assess risk of barriers to plan realisation to ensure delivery of network infrastructure project is achievable
  • Analyse impact on planning of relevant legislation and associated operational codes
  • Produce scoping document with consideration to new technology or technology features required in project
       
Element: Develop project brief
  • Develop planning options considering current and new technology, facilities, features, and present and future needs
  • Conduct cost-benefit studies to guide decision making processes according to sound business practice
  • Discuss project brief with client, as required, and obtain approval of planning options
  • Produce planning specifications relating to location, route, area, product and/or platform
  • Estimate timing, costing and operating budget according to enterprise policy
  • Prepare final project brief and present to operational staff for implementation
       
Element: Manage project
  • Define roles and responsibilities of stakeholders within terms of project
  • Establish reporting and communications line to ensure project is effectively managed
  • Review and continually monitor progress of project against deliverables and timelines, and invoke contingencies if required
  • Complete project documents in line with enterprise standards and guidelines
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Scope network infrastructure requirements

1.1 Determine requirements of project from client and approved network plan

1.2 Assess current access network conditions to determine existing network capacity and capability

1.3 Analyse site survey data and geographical information where necessary to assess suitability of site to design requirements

1.4 Assess risk of barriers to plan realisation to ensure delivery of network infrastructure project is achievable

1.5 Analyse impact on planning of relevant legislation and associated operational codes

1.6 Produce scoping document with consideration to new technology or technology features required in project

2. Develop project brief

2.1 Develop planning options considering current and new technology, facilities, features, and present and future needs

2.2 Conduct cost-benefit studies to guide decision making processes according to sound business practice

2.3 Discuss project brief with client, as required, and obtain approval of planning options

2.4 Produce planning specifications relating to location, route, area, product and/or platform

2.5 Estimate timing, costing and operating budget according to enterprise policy

2.6 Prepare final project brief and present to operational staff for implementation

3. Manage project

3.1 Define roles and responsibilities of stakeholders within terms of project

3.2 Establish reporting and communications line to ensure project is effectively managed

3.3 Review and continually monitor progress of project against deliverables and timelines, and invoke contingencies if required

3.4 Complete project documents in line with enterprise standards and guidelines

Evidence of the ability to:

determine scope of network infrastructure requirements

accurately analyse and document considerations in project specifications and the impact of legislative and environmental conditions on the project plan

prepare a project brief outlining specifications, timeframes, costing and operating budget

manage the delivery of network infrastructure to completion.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline Australian Communications and Media Authority (ACMA) licensing requirements

explain common client telecommunications applications and related equipment

identify correct computer operation

describe the workplace and industry environment

outline industry cabling practices

explain leasing versus purchase options

identify legislative and environmental impacts, including options for green information and communications technology (ICT) installations

outline network and transmission equipment, network topologies, interfaces and interconnect solutions

describe work health and safety (WHS) procedures

identify performance parameters and typical faults in equipment and related connection and transmission media, and various test equipment types

explain the process of project management

identify telecommunications components and assemblies

identify warranty information and contractor work guarantees.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Scope network infrastructure requirements

1.1 Determine requirements of project from client and approved network plan

1.2 Assess current access network conditions to determine existing network capacity and capability

1.3 Analyse site survey data and geographical information where necessary to assess suitability of site to design requirements

1.4 Assess risk of barriers to plan realisation to ensure delivery of network infrastructure project is achievable

1.5 Analyse impact on planning of relevant legislation and associated operational codes

1.6 Produce scoping document with consideration to new technology or technology features required in project

2. Develop project brief

2.1 Develop planning options considering current and new technology, facilities, features, and present and future needs

2.2 Conduct cost-benefit studies to guide decision making processes according to sound business practice

2.3 Discuss project brief with client, as required, and obtain approval of planning options

2.4 Produce planning specifications relating to location, route, area, product and/or platform

2.5 Estimate timing, costing and operating budget according to enterprise policy

2.6 Prepare final project brief and present to operational staff for implementation

3. Manage project

3.1 Define roles and responsibilities of stakeholders within terms of project

3.2 Establish reporting and communications line to ensure project is effectively managed

3.3 Review and continually monitor progress of project against deliverables and timelines, and invoke contingencies if required

3.4 Complete project documents in line with enterprise standards and guidelines

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Determine requirements of project from client and approved network plan 
Assess current access network conditions to determine existing network capacity and capability 
Analyse site survey data and geographical information where necessary to assess suitability of site to design requirements 
Assess risk of barriers to plan realisation to ensure delivery of network infrastructure project is achievable 
Analyse impact on planning of relevant legislation and associated operational codes 
Produce scoping document with consideration to new technology or technology features required in project 
Develop planning options considering current and new technology, facilities, features, and present and future needs 
Conduct cost-benefit studies to guide decision making processes according to sound business practice 
Discuss project brief with client, as required, and obtain approval of planning options 
Produce planning specifications relating to location, route, area, product and/or platform 
Estimate timing, costing and operating budget according to enterprise policy 
Prepare final project brief and present to operational staff for implementation 
Define roles and responsibilities of stakeholders within terms of project 
Establish reporting and communications line to ensure project is effectively managed 
Review and continually monitor progress of project against deliverables and timelines, and invoke contingencies if required 
Complete project documents in line with enterprise standards and guidelines 

Forms

Assessment Cover Sheet

ICTPMG403 - Manage the delivery of network infrastructure
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTPMG403 - Manage the delivery of network infrastructure

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: