Prepare a detailed design brief

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency ICTPMG611 - Prepare a detailed design brief
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to prepare a detailed design brief to realise a building and equipment provisioning project, including costing, vendor and technology choices, scheduling and resourcing.It applies to individuals with a high level of specialist technical skills and knowledge in optical telecommunications and IT networks using internet protocol (IP) systems for a new installation or upgrade of capacity or technology for an existing network or subsystem for convergence to next generation networks (NGN).No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – project management field of work and include access to:

sites on which projects may be designed

relevant databases, legislative requirements and other project related documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Evaluate design requirements
  • Consult relevant legislation, codes, regulations and standards that impact on project
  • Determine need for enhancement to new or existing telecommunications network from telecommunications project plan and associated project brief
  • Determine specific purpose and type of network growth and enhancement using collated data from other relevant sources
  • Consult client regarding enterprise criteria and determine timeframe for design plan
  • Establish and organise design resource requirements
       
Element: Evaluate information to prepare design drawings
  • Obtain site access through consultation with affected property owners where project impacts on private property
  • Collect field data and propose ways to manage physical impediments that may affect building construction work
  • Verify existing equipment, equipment layouts and building services to plan for network growth
  • Ascertain impact of relevant heritage, environmental and other governmental legislation, and initiate action or organise consultative processes to gain approvals according to enterprise policy
  • Prepare design drawing according to enterprise requirements
       
Element: Select design option
  • Analyse proposed network needs to determine set of realistic design options
  • Evaluate and select preferred design option according to approved enterprise criteria and discuss selected option with client
  • Assess system compatibility and make modifications to design
       
Element: Prepare design plan
  • Prepare detailed design plan, including relevant geographical and topological information, equipment and material and cost estimates
  • Discuss final designs with planners and project management, and obtain approval to proceed
  • Produce final detailed design brief with drawings, material requirements, and testing and maintenance plans for operational staff to follow
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Evaluate design requirements

1.1 Consult relevant legislation, codes, regulations and standards that impact on project

1.2 Determine need for enhancement to new or existing telecommunications network from telecommunications project plan and associated project brief

1.3 Determine specific purpose and type of network growth and enhancement using collated data from other relevant sources

1.4 Consult client regarding enterprise criteria and determine timeframe for design plan

1.5 Establish and organise design resource requirements

2. Evaluate information to prepare design drawings

2.1 Obtain site access through consultation with affected property owners where project impacts on private property

2.2 Collect field data and propose ways to manage physical impediments that may affect building construction work

2.3 Verify existing equipment, equipment layouts and building services to plan for network growth

2.4 Ascertain impact of relevant heritage, environmental and other governmental legislation, and initiate action or organise consultative processes to gain approvals according to enterprise policy

2.5 Prepare design drawing according to enterprise requirements

3. Select design option

3.1 Analyse proposed network needs to determine set of realistic design options

3.2 Evaluate and select preferred design option according to approved enterprise criteria and discuss selected option with client

3.3 Assess system compatibility and make modifications to design

4. Prepare design plan

4.1 Prepare detailed design plan, including relevant geographical and topological information, equipment and material and cost estimates

4.2 Discuss final designs with planners and project management, and obtain approval to proceed

4.3 Produce final detailed design brief with drawings, material requirements, and testing and maintenance plans for operational staff to follow

Evidence of the ability to:

assess the implications of legislation, regulations and standards on project design

analyse the network and enterprise needs to determine design options

consult widely to ensure design represents client requirements

prepare a design brief for building and equipment design provisioning

prepare detailed design documentation to enable realisation of design.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

explain common client telecommunications applications and related equipment

identify and critique connections to carrier infrastructure or equipment

describe cost-effective solutions in planning

identify and explore current legislation relating to installation of telecommunications equipment and connection to carrier services

review the range of client premises equipment (CPE)

outline environmental impacts and options for green information and communications technology (ICT) installations

review network and transmission equipment

explain network topologies, and interface and interconnection solutions

outline work health and safety (WHS) issues that are required to be included in the design brief for:

electrical safety

materials handling

physical hazards

confined spaces

heights

lifting

review the power requirements and electrical safety of the project

explain technology of next generation networks (NGN)

identify test equipment types.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Evaluate design requirements

1.1 Consult relevant legislation, codes, regulations and standards that impact on project

1.2 Determine need for enhancement to new or existing telecommunications network from telecommunications project plan and associated project brief

1.3 Determine specific purpose and type of network growth and enhancement using collated data from other relevant sources

1.4 Consult client regarding enterprise criteria and determine timeframe for design plan

1.5 Establish and organise design resource requirements

2. Evaluate information to prepare design drawings

2.1 Obtain site access through consultation with affected property owners where project impacts on private property

2.2 Collect field data and propose ways to manage physical impediments that may affect building construction work

2.3 Verify existing equipment, equipment layouts and building services to plan for network growth

2.4 Ascertain impact of relevant heritage, environmental and other governmental legislation, and initiate action or organise consultative processes to gain approvals according to enterprise policy

2.5 Prepare design drawing according to enterprise requirements

3. Select design option

3.1 Analyse proposed network needs to determine set of realistic design options

3.2 Evaluate and select preferred design option according to approved enterprise criteria and discuss selected option with client

3.3 Assess system compatibility and make modifications to design

4. Prepare design plan

4.1 Prepare detailed design plan, including relevant geographical and topological information, equipment and material and cost estimates

4.2 Discuss final designs with planners and project management, and obtain approval to proceed

4.3 Produce final detailed design brief with drawings, material requirements, and testing and maintenance plans for operational staff to follow

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Consult relevant legislation, codes, regulations and standards that impact on project 
Determine need for enhancement to new or existing telecommunications network from telecommunications project plan and associated project brief 
Determine specific purpose and type of network growth and enhancement using collated data from other relevant sources 
Consult client regarding enterprise criteria and determine timeframe for design plan 
Establish and organise design resource requirements 
Obtain site access through consultation with affected property owners where project impacts on private property 
Collect field data and propose ways to manage physical impediments that may affect building construction work 
Verify existing equipment, equipment layouts and building services to plan for network growth 
Ascertain impact of relevant heritage, environmental and other governmental legislation, and initiate action or organise consultative processes to gain approvals according to enterprise policy 
Prepare design drawing according to enterprise requirements 
Analyse proposed network needs to determine set of realistic design options 
Evaluate and select preferred design option according to approved enterprise criteria and discuss selected option with client 
Assess system compatibility and make modifications to design 
Prepare detailed design plan, including relevant geographical and topological information, equipment and material and cost estimates 
Discuss final designs with planners and project management, and obtain approval to proceed 
Produce final detailed design brief with drawings, material requirements, and testing and maintenance plans for operational staff to follow 

Forms

Assessment Cover Sheet

ICTPMG611 - Prepare a detailed design brief
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTPMG611 - Prepare a detailed design brief

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: