Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

ICTSUS403 Mapping and Delivery Guide
Install and test power management software

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency ICTSUS403 - Install and test power management software
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to select, install and test power management software in network elements.It applies to individuals who usually operate with a degree of autonomy, but may also supervise the work of others in the information and communications technology (ICT) industry.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – sustainability field of work and include access to:

a site on which energy saving solutions can be implemented

power saving hardware currently used in industry

relevant documentation, feasibility studies, equipment manuals and other site-related documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan to install power management software
  • Arrange access to work site according to required procedure
  • Assess extent of software implementation using feasibility report and organisational guidelines
  • Liaise with appropriate person to obtain approval for plans
  • Determine and source new software required
       
Element: Install software
  • Bench test software for performance
  • Install and configure software according to work health and safety (WHS) and environmental requirements, plan, installation procedures and organisational requirements
  • Resolve identified technical problems
       
Element: Complete documentation and sign off procedures
  • Document installation and configuration process according to organisational guidelines
  • Provide user documentation
  • Notify client and obtain sign off
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan to install power management software

1.1 Arrange access to work site according to required procedure

1.2 Assess extent of software implementation using feasibility report and organisational guidelines

1.3 Liaise with appropriate person to obtain approval for plans

1.4 Determine and source new software required

2. Install software

2.1 Bench test software for performance

2.2 Install and configure software according to work health and safety (WHS) and environmental requirements, plan, installation procedures and organisational requirements

2.3 Resolve identified technical problems

3. Complete documentation and sign off procedures

3.1 Document installation and configuration process according to organisational guidelines

3.2 Provide user documentation

3.3 Notify client and obtain sign off

Evidence of the ability to:

clarify and meet client requirements for installation and testing of power management software

plan and connect the software components according to vendor and technical specifications across a variety of situations.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify areas of the hardware relevant to configuration and testing

explain current industry-accepted software products, with general features and capabilities

summarise appropriate installation procedures

outline work health and safety (WHS) requirements in relation to work safety, environmental factors and ergonomic considerations

explain power saving software functionality

describe set up and configuration procedures

discuss systems diagnostic features

explain vendor specifications and requirements for component installation.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan to install power management software

1.1 Arrange access to work site according to required procedure

1.2 Assess extent of software implementation using feasibility report and organisational guidelines

1.3 Liaise with appropriate person to obtain approval for plans

1.4 Determine and source new software required

2. Install software

2.1 Bench test software for performance

2.2 Install and configure software according to work health and safety (WHS) and environmental requirements, plan, installation procedures and organisational requirements

2.3 Resolve identified technical problems

3. Complete documentation and sign off procedures

3.1 Document installation and configuration process according to organisational guidelines

3.2 Provide user documentation

3.3 Notify client and obtain sign off

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Arrange access to work site according to required procedure 
Assess extent of software implementation using feasibility report and organisational guidelines 
Liaise with appropriate person to obtain approval for plans 
Determine and source new software required 
Bench test software for performance 
Install and configure software according to work health and safety (WHS) and environmental requirements, plan, installation procedures and organisational requirements 
Resolve identified technical problems 
Document installation and configuration process according to organisational guidelines 
Provide user documentation 
Notify client and obtain sign off 

Forms

Assessment Cover Sheet

ICTSUS403 - Install and test power management software
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTSUS403 - Install and test power management software

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: