Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

ICTTEN408 Mapping and Delivery Guide
Complete equipment and software upgrades

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency ICTTEN408 - Complete equipment and software upgrades
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to upgrade telecommunications equipment and software in service provider networks and customer premises, and may apply to switching, transmission, radio, and computer networks using cable, optical fibre, radio, microwave and satellite transmission.It applies to individuals who supervise installation and maintenance teams involved in new installations or maintenance, upgrades and cut overs of emerging technologies in IP-based telecommunications networks.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications networks engineering field of work and include access to:

a site where upgrade may be conducted

equipment, software, test and monitoring equipment currently used in industry

relevant regulatory, equipment, enterprise and vendor documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for upgrade activity
  • Obtain relevant legislation, codes, regulations and standards for compliance when conducting work
  • Contact customer for site access, security arrangements and location details of equipment for upgrade
  • Identify site hazards and notify appropriate personnel to make site safe
  • Prepare an upgrade plan against work order and seek approval from customer
  • Organise system back-up from support personnel
  • Obtain tools and test equipment and check for accuracy and safety
  • Allocate specific tasks according to the skill mix of staff involved
  • Run test plan on current equipment and identify and rectify problems in consultation with planners
  • Complete functional testing of new systems and equipment prior to upgrade to minimise system downtime
  • Analyse test results to predict compatibility and interoperability issues of equipment and systems prior to the upgrade work
       
Element: Undertake upgrade
  • Implement upgrade according to design specification, following work health and safety (WHS) and environmental requirements
  • Follow procedures for upgrade of network in sequential order as defined in instruction manuals
  • Monitor progress of upgrade periodically to ensure plans in relation to time and duration are being met
  • Notify planner of problems encountered with detail of the impact on the upgrade plan
  • Abort upgrade and implement contingency plan if upgrade plan cannot be realised without major disruption to network
  • Monitor system response during upgrade and take action according to instructions provided
       
Element: Test upgrade for acceptance
  • Undertake tests according to predetermined test plan
  • Analyse test results and verify against specified performance levels
  • Escalate problems encountered according to enterprise policy
  • Invoke reversion procedure to pre-upgrade state, if directed by planners, according to enterprise policy
  • Record upgrade test results and provide to network management group
  • Run post-upgrade routines according to documented procedures
       
Element: Monitor post-upgrade performance
  • Conduct ongoing tests to ensure success of upgrade
  • Monitor relevant alarms to measure impact of upgrade
  • Review customer complaints to assess impact of upgrade on customer satisfaction
       
Element: Finalise administrative work and clean up worksite
  • Complete relevant work documentation and administrative tasks according to enterprise policy
  • Amend site records to show upgraded equipment layout
  • Organise customer training in the new or modified system
  • Clean up and restore site to customer satisfaction
  • Collect and dispose of waste material and debris according to environmental requirements
  • Declare asset ready for use
  • Notify customer of upgrade job completion to obtain sign-off of work order and present with a copy of documentation
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for upgrade activity

1.1 Obtain relevant legislation, codes, regulations and standards for compliance when conducting work

1.2 Contact customer for site access, security arrangements and location details of equipment for upgrade

1.3 Identify site hazards and notify appropriate personnel to make site safe

1.4 Prepare an upgrade plan against work order and seek approval from customer

1.5 Organise system back-up from support personnel

1.6 Obtain tools and test equipment and check for accuracy and safety

1.7 Allocate specific tasks according to the skill mix of staff involved

1.8 Run test plan on current equipment and identify and rectify problems in consultation with planners

1.9 Complete functional testing of new systems and equipment prior to upgrade to minimise system downtime

1.10 Analyse test results to predict compatibility and interoperability issues of equipment and systems prior to the upgrade work

2. Undertake upgrade

2.1 Implement upgrade according to design specification, following work health and safety (WHS) and environmental requirements

2.2 Follow procedures for upgrade of network in sequential order as defined in instruction manuals

2.3 Monitor progress of upgrade periodically to ensure plans in relation to time and duration are being met

2.4 Notify planner of problems encountered with detail of the impact on the upgrade plan

2.5 Abort upgrade and implement contingency plan if upgrade plan cannot be realised without major disruption to network

2.6 Monitor system response during upgrade and take action according to instructions provided

3. Test upgrade for acceptance

3.1 Undertake tests according to predetermined test plan

3.2 Analyse test results and verify against specified performance levels

3.3 Escalate problems encountered according to enterprise policy

3.4 Invoke reversion procedure to pre-upgrade state, if directed by planners, according to enterprise policy

3.5 Record upgrade test results and provide to network management group

3.6 Run post-upgrade routines according to documented procedures

4. Monitor post-upgrade performance

4.1 Conduct ongoing tests to ensure success of upgrade

4.2 Monitor relevant alarms to measure impact of upgrade

4.3 Review customer complaints to assess impact of upgrade on customer satisfaction

5. Finalise administrative work and clean up worksite

5.1 Complete relevant work documentation and administrative tasks according to enterprise policy

5.2 Amend site records to show upgraded equipment layout

5.3 Organise customer training in the new or modified system

5.4 Clean up and restore site to customer satisfaction

5.5 Collect and dispose of waste material and debris according to environmental requirements

5.6 Declare asset ready for use

5.7 Notify customer of upgrade job completion to obtain sign-off of work order and present with a copy of documentation

Evidence of ability to:

analyse implications of hardware and software upgrade on remainder of the network

identify components of the upgrade process

prepare an upgrade plan and organise system back-up

run test plan and analyse test results

implement upgrade according to work health and safety requirements

monitor progress of upgrade periodically using both vendor- and enterprise-specific monitoring tools

implement contingency plan when required, and analyse alarms and alarm conditions

escalate unresolved problems and review customer complaints to assess impact of upgrade

make necessary arrangements with the customer for site access and training.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

explain alarms used to monitor operation of computer software systems

explain use of back-up systems

illustrate common upgrades and post-upgrade routines

describe escalation and outage procedures

investigate network management systems

outline telecommunications networks and equipment

identify telecommunications monitoring tools

describe telecommunications test equipment and test set-ups

describe telecommunications wiring practices.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for upgrade activity

1.1 Obtain relevant legislation, codes, regulations and standards for compliance when conducting work

1.2 Contact customer for site access, security arrangements and location details of equipment for upgrade

1.3 Identify site hazards and notify appropriate personnel to make site safe

1.4 Prepare an upgrade plan against work order and seek approval from customer

1.5 Organise system back-up from support personnel

1.6 Obtain tools and test equipment and check for accuracy and safety

1.7 Allocate specific tasks according to the skill mix of staff involved

1.8 Run test plan on current equipment and identify and rectify problems in consultation with planners

1.9 Complete functional testing of new systems and equipment prior to upgrade to minimise system downtime

1.10 Analyse test results to predict compatibility and interoperability issues of equipment and systems prior to the upgrade work

2. Undertake upgrade

2.1 Implement upgrade according to design specification, following work health and safety (WHS) and environmental requirements

2.2 Follow procedures for upgrade of network in sequential order as defined in instruction manuals

2.3 Monitor progress of upgrade periodically to ensure plans in relation to time and duration are being met

2.4 Notify planner of problems encountered with detail of the impact on the upgrade plan

2.5 Abort upgrade and implement contingency plan if upgrade plan cannot be realised without major disruption to network

2.6 Monitor system response during upgrade and take action according to instructions provided

3. Test upgrade for acceptance

3.1 Undertake tests according to predetermined test plan

3.2 Analyse test results and verify against specified performance levels

3.3 Escalate problems encountered according to enterprise policy

3.4 Invoke reversion procedure to pre-upgrade state, if directed by planners, according to enterprise policy

3.5 Record upgrade test results and provide to network management group

3.6 Run post-upgrade routines according to documented procedures

4. Monitor post-upgrade performance

4.1 Conduct ongoing tests to ensure success of upgrade

4.2 Monitor relevant alarms to measure impact of upgrade

4.3 Review customer complaints to assess impact of upgrade on customer satisfaction

5. Finalise administrative work and clean up worksite

5.1 Complete relevant work documentation and administrative tasks according to enterprise policy

5.2 Amend site records to show upgraded equipment layout

5.3 Organise customer training in the new or modified system

5.4 Clean up and restore site to customer satisfaction

5.5 Collect and dispose of waste material and debris according to environmental requirements

5.6 Declare asset ready for use

5.7 Notify customer of upgrade job completion to obtain sign-off of work order and present with a copy of documentation

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain relevant legislation, codes, regulations and standards for compliance when conducting work 
Contact customer for site access, security arrangements and location details of equipment for upgrade 
Identify site hazards and notify appropriate personnel to make site safe 
Prepare an upgrade plan against work order and seek approval from customer 
Organise system back-up from support personnel 
Obtain tools and test equipment and check for accuracy and safety 
Allocate specific tasks according to the skill mix of staff involved 
Run test plan on current equipment and identify and rectify problems in consultation with planners 
Complete functional testing of new systems and equipment prior to upgrade to minimise system downtime 
Analyse test results to predict compatibility and interoperability issues of equipment and systems prior to the upgrade work 
Implement upgrade according to design specification, following work health and safety (WHS) and environmental requirements 
Follow procedures for upgrade of network in sequential order as defined in instruction manuals 
Monitor progress of upgrade periodically to ensure plans in relation to time and duration are being met 
Notify planner of problems encountered with detail of the impact on the upgrade plan 
Abort upgrade and implement contingency plan if upgrade plan cannot be realised without major disruption to network 
Monitor system response during upgrade and take action according to instructions provided 
Undertake tests according to predetermined test plan 
Analyse test results and verify against specified performance levels 
Escalate problems encountered according to enterprise policy 
Invoke reversion procedure to pre-upgrade state, if directed by planners, according to enterprise policy 
Record upgrade test results and provide to network management group 
Run post-upgrade routines according to documented procedures 
Conduct ongoing tests to ensure success of upgrade 
Monitor relevant alarms to measure impact of upgrade 
Review customer complaints to assess impact of upgrade on customer satisfaction 
Complete relevant work documentation and administrative tasks according to enterprise policy 
Amend site records to show upgraded equipment layout 
Organise customer training in the new or modified system 
Clean up and restore site to customer satisfaction 
Collect and dispose of waste material and debris according to environmental requirements 
Declare asset ready for use 
Notify customer of upgrade job completion to obtain sign-off of work order and present with a copy of documentation 

Forms

Assessment Cover Sheet

ICTTEN408 - Complete equipment and software upgrades
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTTEN408 - Complete equipment and software upgrades

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: