Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

ICTTEN427 Mapping and Delivery Guide
Conduct site surveys to identify carrier installation requirements

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency ICTTEN427 - Conduct site surveys to identify carrier installation requirements
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to implement design processes, develop solutions, and merge technological development and product implementation in access, building and core networks.It applies to individuals working as technical staff on projects within a carrier network for carrier, commercial or industrial installations. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the telecommunications networks engineering field of work and include access to:

a network planning area, systems and deployment rules and standards

relevant databases, licensing requirements and other site related procedures

a location and scenario suitable to conduct a site survey.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Obtain access to work site
  • Notify appropriate personnel, if necessary, to arrange site access, discuss installation requirements and identify carrier network systems
  • Assess site-specific safety requirements and enterprise work health and safety (WHS) processes and procedures
  • Use network information systems to obtain planning data
       
Element: Identify existing infrastructure
  • Confirm details of installation with stakeholders
  • Verify site conditions and building construction
  • Locate and record existing facilities and systems
  • Confirm installation locations and identify barriers to planned network extension
  • Integrate existing network and floor plans into documentation where available
       
Element: Integrate existing infrastructure into design brief
  • Review existing plans, drawings and databases against the design brief
  • Calculate capacity of existing facilities against proposed usage to ensure appropriate design decisions for new installation
  • Incorporate all data into new installation design
  • Mark up plans and prepare report on new installation design
  • Develop contingency plans for anticipated constraints
       
Element: Review design for compliance with standards and legislation
  • Examine standards, practices and requirements for locating telecommunications infrastructure in the access network
  • Review installation design to ensure compliance with requirements of federal, state and local regulations, relevant legislation, codes and standards
  • Initiate any special studies or investigations necessary for completion of the project
       
Element: Complete required reports and documentation
  • Complete required documents promptly and according to planning parameters
  • Obtain carrier confirmation from documented requirements
  • Distribute design documentation to stakeholders promptly
  • Obtain project plan sign-off from carrier
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Obtain access to work site

1.1 Notify appropriate personnel, if necessary, to arrange site access, discuss installation requirements and identify carrier network systems

1.2 Assess site-specific safety requirements and enterprise work health and safety (WHS) processes and procedures

1.3 Use network information systems to obtain planning data

2. Identify existing infrastructure

2.1 Confirm details of installation with stakeholders

2.2 Verify site conditions and building construction

2.3 Locate and record existing facilities and systems

2.4 Confirm installation locations and identify barriers to planned network extension

2.5 Integrate existing network and floor plans into documentation where available

3. Integrate existing infrastructure into design brief

3.1 Review existing plans, drawings and databases against the design brief

3.2 Calculate capacity of existing facilities against proposed usage to ensure appropriate design decisions for new installation

3.3 Incorporate all data into new installation design

3.4 Mark up plans and prepare report on new installation design

3.5 Develop contingency plans for anticipated constraints

4. Review design for compliance with standards and legislation

4.1 Examine standards, practices and requirements for locating telecommunications infrastructure in the access network

4.2 Review installation design to ensure compliance with requirements of federal, state and local regulations, relevant legislation, codes and standards

4.3 Initiate any special studies or investigations necessary for completion of the project

5. Complete required reports and documentation

5.1 Complete required documents promptly and according to planning parameters

5.2 Obtain carrier confirmation from documented requirements

5.3 Distribute design documentation to stakeholders promptly

5.4 Obtain project plan sign-off from carrier

Evidence of ability to:

evaluate existing infrastructure on an installation site

integrate existing infrastructure into an installation design

develop design specifications for an installation project

engage stakeholders and carriers in design approval process.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify and explain the impact of relevant legislation, codes of practice and other formal agreements that impact communications work

describe access networks in Australia and state how it influences development of projects

identify costs associated with carrier installations and determine estimates and operating budgets for an installation

identify network performance information required to produce a network design

specify current, new and emerging technologies to be considered for a communications design, including barriers that may have an impact

define project management and its purpose and explain associated databases and project management software programs used

explain economic and political influences and trends that impact communications installations for public and commercial enterprises

describe a network plan and its components

explain the purpose of having authorities and delegations required when costing and estimating financials for projects

explain the impact of local and international economic conditions on telecommunications installations and infrastructure, and typical challenges and limits facing technology today and on future needs

describe the process and documentation required to collate and write project briefs, reports and project charters

identify specific work health and safety requirements relating to site conditions and activities, including manufacturer's requirements for safe operation of equipment to be incorporated into project documentation.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Obtain access to work site

1.1 Notify appropriate personnel, if necessary, to arrange site access, discuss installation requirements and identify carrier network systems

1.2 Assess site-specific safety requirements and enterprise work health and safety (WHS) processes and procedures

1.3 Use network information systems to obtain planning data

2. Identify existing infrastructure

2.1 Confirm details of installation with stakeholders

2.2 Verify site conditions and building construction

2.3 Locate and record existing facilities and systems

2.4 Confirm installation locations and identify barriers to planned network extension

2.5 Integrate existing network and floor plans into documentation where available

3. Integrate existing infrastructure into design brief

3.1 Review existing plans, drawings and databases against the design brief

3.2 Calculate capacity of existing facilities against proposed usage to ensure appropriate design decisions for new installation

3.3 Incorporate all data into new installation design

3.4 Mark up plans and prepare report on new installation design

3.5 Develop contingency plans for anticipated constraints

4. Review design for compliance with standards and legislation

4.1 Examine standards, practices and requirements for locating telecommunications infrastructure in the access network

4.2 Review installation design to ensure compliance with requirements of federal, state and local regulations, relevant legislation, codes and standards

4.3 Initiate any special studies or investigations necessary for completion of the project

5. Complete required reports and documentation

5.1 Complete required documents promptly and according to planning parameters

5.2 Obtain carrier confirmation from documented requirements

5.3 Distribute design documentation to stakeholders promptly

5.4 Obtain project plan sign-off from carrier

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Notify appropriate personnel, if necessary, to arrange site access, discuss installation requirements and identify carrier network systems 
Assess site-specific safety requirements and enterprise work health and safety (WHS) processes and procedures 
Use network information systems to obtain planning data 
Confirm details of installation with stakeholders 
Verify site conditions and building construction 
Locate and record existing facilities and systems 
Confirm installation locations and identify barriers to planned network extension 
Integrate existing network and floor plans into documentation where available 
Review existing plans, drawings and databases against the design brief 
Calculate capacity of existing facilities against proposed usage to ensure appropriate design decisions for new installation 
Incorporate all data into new installation design 
Mark up plans and prepare report on new installation design 
Develop contingency plans for anticipated constraints 
Examine standards, practices and requirements for locating telecommunications infrastructure in the access network 
Review installation design to ensure compliance with requirements of federal, state and local regulations, relevant legislation, codes and standards 
Initiate any special studies or investigations necessary for completion of the project 
Complete required documents promptly and according to planning parameters 
Obtain carrier confirmation from documented requirements 
Distribute design documentation to stakeholders promptly 
Obtain project plan sign-off from carrier 

Forms

Assessment Cover Sheet

ICTTEN427 - Conduct site surveys to identify carrier installation requirements
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTTEN427 - Conduct site surveys to identify carrier installation requirements

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: