Unit of Competency ICTWOR401 - Undertake a civil site survey
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to assess a site for a telecommunications project, including gathering information about the site and the project, surveying the site and evaluating the suitability of the site for the work. It applies to individuals who work as technical staff with a range of telecommunications skills, involves a degree of autonomy and may include limited supervision of others.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – workplace effectiveness field of work and include access to:

a site for survey

current equipment

relevant regulatory and enterprise documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for survey
  • Discuss detailed requirements and arrange access to site with key stakeholders
  • Examine regulatory and statutory requirements associated with telecommunications project
  • Determine need for specialist studies for site
       
Element: Survey land, buildings and facilities
  • Survey existing buildings to assess capability of meeting changes required for project
  • Collect information through site survey
  • Determine environmental impact of development
  • Estimate impact of prevailing weather conditions on planned changes
  • Assess and document building options should new structure be necessary
  • Assess geographical nature of land and determine barriers to signalling
       
Element: Report findings and recommendations
  • Outline survey findings and recommendations to accommodate project requirements on site
  • Develop options to meet planned changes and associated cost-benefit data
  • Complete report and forward to relevant stakeholders following relevant procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for survey

1.1 Discuss detailed requirements and arrange access to site with key stakeholders

1.2 Examine regulatory and statutory requirements associated with telecommunications project

1.3 Determine need for specialist studies for site

2. Survey land, buildings and facilities

2.1 Survey existing buildings to assess capability of meeting changes required for project

2.2 Collect information through site survey

2.3 Determine environmental impact of development

2.4 Estimate impact of prevailing weather conditions on planned changes

2.5 Assess and document building options should new structure be necessary

2.6 Assess geographical nature of land and determine barriers to signalling

3. Report findings and recommendations

3.1 Outline survey findings and recommendations to accommodate project requirements on site

3.2 Develop options to meet planned changes and associated cost-benefit data

3.3 Complete report and forward to relevant stakeholders following relevant procedures

Evidence of the ability to:

negotiate with key stakeholders, enterprise personnel, clients, community representatives, specialists and other contractors on environmental and network needs

accurately undertake a survey of environmental conditions, land, buildings and facilities for a telecommunications project

apply legislative requirements to the project, including relevant operational codes, work health and safety (WHS) requirements and work practices

report survey findings, outlining options and including recommendations with supporting reasons and coverage of existing and proposed needs.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline the background information required to undertake a civil site survey

explain basic meteorology and weather conditions

describe the features and operating requirements of construction equipment

describe geographical barriers to signalling

identify legislation, codes of practice and other formal agreements that impact on the work activity

describe licensing and regulatory issues applying to a civil site survey on telecommunications sites

outline soil testing methods and requirements

describe

civil site safety practices

personal protective equipment for civil survey projects

WHS requirements relating to surveys and site conditions

outline typical issues and challenges that occur on site.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for survey

1.1 Discuss detailed requirements and arrange access to site with key stakeholders

1.2 Examine regulatory and statutory requirements associated with telecommunications project

1.3 Determine need for specialist studies for site

2. Survey land, buildings and facilities

2.1 Survey existing buildings to assess capability of meeting changes required for project

2.2 Collect information through site survey

2.3 Determine environmental impact of development

2.4 Estimate impact of prevailing weather conditions on planned changes

2.5 Assess and document building options should new structure be necessary

2.6 Assess geographical nature of land and determine barriers to signalling

3. Report findings and recommendations

3.1 Outline survey findings and recommendations to accommodate project requirements on site

3.2 Develop options to meet planned changes and associated cost-benefit data

3.3 Complete report and forward to relevant stakeholders following relevant procedures

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Discuss detailed requirements and arrange access to site with key stakeholders 
Examine regulatory and statutory requirements associated with telecommunications project 
Determine need for specialist studies for site 
Survey existing buildings to assess capability of meeting changes required for project 
Collect information through site survey 
Determine environmental impact of development 
Estimate impact of prevailing weather conditions on planned changes 
Assess and document building options should new structure be necessary 
Assess geographical nature of land and determine barriers to signalling 
Outline survey findings and recommendations to accommodate project requirements on site 
Develop options to meet planned changes and associated cost-benefit data 
Complete report and forward to relevant stakeholders following relevant procedures 

Forms

Assessment Cover Sheet

ICTWOR401 - Undertake a civil site survey
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTWOR401 - Undertake a civil site survey

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: