Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

LMFFL3310A Mapping and Delivery Guide
Cut and install resilient floor coverings to stairs

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency LMFFL3310A - Cut and install resilient floor coverings to stairs
Description This unit covers the competencies required to install resilient floor covering to stairs, stringers and steps including planning, preparation, cutting, welding, layout and fixing.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit supports the attainment of skills and knowledge required for competent workplace performance in the wide variety of flooring technology operations. The competency applies to an on site environment and involves application of skills and knowledge at a trade worker level. These skills and knowledge are to be used within the scope of the individual's job and authority.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Nil
Competency Field Resilient
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for installation
  • Applicable legislative, OHS and organisational requirements relevant to cutting and installing resilient floor coverings to stairs are verified and complied with
  • Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  • Sub-floor condition is assessed for suitability for installation of resilient floor coverings to stairs
  • Any remedial work to stairway is carried out
  • Stairway or step is measured and the required amount of floor covering including allowances for type of stairs, is calculated and obtained
  • Underlay (if required) is checked against specified type and fitting
  • Suitable adhesives, trims and accessories are selected
  • Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation
       
Element: Set-out floor coverings
  • Resilient floor coverings to be used are checked against order
  • Resilient floor coverings are acclimatised according to manufacturer recommendations
  • Resilient floor coverings for fixing are organised and used in accordance with relevant safety management requirements
  • Working lines and starting point are established
  • Pre-form fillet is cut and fitted (if required)
       
Element: Lay resilient floor coverings
  • Instructions and sequence for laying and fixing is followed
  • Resilient floor coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate
  • Patterns are cut as required for stairs and used to accurately and clearly mark resilient floor covering for cutting
  • Resilient floor coverings are cut to required pattern and shape with minimum waste of materials
  • Materials for welding and fixing are organised and used in accordance with relevant safety management requirements
  • Welding and fixing methods, equipment and materials are used following manufacturers' instructions
  • Resilient skirting, reducer and edge strips are set out and installed (as required)
  • Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures
       
Element: Complete housekeeping
  • Unused materials are stored or recycled as required
  • Tools and equipment are cleaned and stored appropriately
  • Work area is cleaned and rubbish disposed of appropriately
  • Workplace documentation and/or reports are completed
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for cutting and installing resilient floor coverings to stairs

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Follow work instructions, operating procedures and inspection practices to:

minimise the risk of injury to self and others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete a minimum of the installation of resilient floor coverings to:

a box step stairway, stringer and PVC stair nosing

a kite winder treads stairway, and PVC stair nosing

a bull nose step stairway PVC stair nosing

a recessed step stairway

Work effectively with others

Modify activities to cater for variations in workplace contexts and environment

Context of, and specific resources for assessment

The application of competency is to be assessed in the workplace or realistically simulated workplace

Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints

Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context

Assessment is to comply with relevant regulatory or Australian Standards requirements

The following resources should be made available:

workplace location or simulated workplace

materials and equipment relevant to installing resilient floor coverings to stairs

specifications and work instructions

Method of assessment

Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package

Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge

Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application

Assessment may be applied under project related conditions (real or simulated) and require evidence of process

Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances

Assessment may be in conjunction with assessment of other units of competency


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

collect, organise and understand information related to work orders, basic plans and safety procedures

communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the reporting of work outcomes and problems

work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

use pre-checking and inspection techniques to anticipate problems, cutting and installing resilient floor coverings to stairs to avoid rework and wastage

recognise and respond to circumstances outside instructions or personal competence

plan and organise activities including the preparation and layout of the worksite and the obtaining of equipment and materials to avoid any back tracking, work flow interruptions or wastage

use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate other material requirements

clarify and confirm work instructions

plan work within given task parameters

accept responsibility for given tasks

set, monitor and satisfy personal work goals

satisfy the competency requirements for the job

maintain current knowledge of:

tools and materials

installation techniques

seek learning opportunities

use the limited workplace technology related to the cutting and installing resilient floor coverings to stairs including tools, equipment, calculators and measuring devices.

Required knowledge

State or Territory OHS legislation, regulations, standards and codes of practice relevant to cutting and installing resilient floor coverings to stairs

organisational and site standards, requirements, policies and procedures for cutting and installing resilient coverings to stairs

environmental protection requirements

established communication channels and protocols

problem identification and resolution

types of tools and equipment and procedures for their safe use, operation and maintenance

characteristics of materials, products and defects

set up and operation of equipment

products assembly techniques

procedures for the recording, reporting and maintenance of workplace records and information

appropriate mathematical procedures for estimation and measurement

type, characteristics, uses and limitations of:

weldable resilient floor coverings

resilient floor covering installation adhesives

forming and welding techniques for installing resilient floor coverings to stairs

types and uses of resilient floor covering installation tools and equipment

workplace safety system requirements related to resilient floor covering installation

characteristics and requirements of sub-floor preparation

work flow in relation to cutting, welding and laying resilient flooring to stairs

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Legislative requirements

are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage

OHS requirements

are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling including lifting and carrying

Organisational requirements

may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)

Resilient floor covering

includes homogenous/heterogeneous, linoleum sheet, encapsulated glass fibre, inlaid and rotogravure

Stairs

may include open newell, bullnose steps, circular, recessed steps, open tread, box steps and kit winder treads

Work involves the cutting, welding, laying and fixing of resilient floor covering to stairs.

Instructions

Workplace procedures relating to the use and operation of tools and equipment

Workplace instructions, including job sheets, plans, drawings and designs

Workplace procedures relating to reporting and communications

Manufacturer instructions for the use of equipment and materials

Adhesives

may include:

plasticised and rubber resin acrylic

two part epoxy

polyurethane

water-based and solvent-based contact adhesive

Tools and equipment

may include:

utility knife with hook, straight and concave blades

straight edge

square

chalk and chalk-line

tape measure

hacksaw

notched trowel

hammer

seam and edge trimmer

recess scriber and pre-formed linoleum recess scribers

scribing bar

welding gun and accessories

hot air gun

grooving tool

divider

pencil cove roller

hand roller

cove gauging tool

roller

gas bottle and gun

rubber mallet

paint brush and bucket

spatula knife

builder's pencil

contact bucket

linoleum trolley

liquid seam sealer

seam sealer applicator

wall trimmer

Materials

are to include but are not limited to:

resilient flooring

skirting

reducing and edge strips

welding rod

coving accessories

tapes

pattern paper

adhesives

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Applicable legislative, OHS and organisational requirements relevant to cutting and installing resilient floor coverings to stairs are verified and complied with 
Instructions and/or plans are read and interpreted to identify process required to complete work tasks 
Sub-floor condition is assessed for suitability for installation of resilient floor coverings to stairs 
Any remedial work to stairway is carried out 
Stairway or step is measured and the required amount of floor covering including allowances for type of stairs, is calculated and obtained 
Underlay (if required) is checked against specified type and fitting 
Suitable adhesives, trims and accessories are selected 
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation 
Resilient floor coverings to be used are checked against order 
Resilient floor coverings are acclimatised according to manufacturer recommendations 
Resilient floor coverings for fixing are organised and used in accordance with relevant safety management requirements 
Working lines and starting point are established 
Pre-form fillet is cut and fitted (if required) 
Instructions and sequence for laying and fixing is followed 
Resilient floor coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate 
Patterns are cut as required for stairs and used to accurately and clearly mark resilient floor covering for cutting 
Resilient floor coverings are cut to required pattern and shape with minimum waste of materials 
Materials for welding and fixing are organised and used in accordance with relevant safety management requirements 
Welding and fixing methods, equipment and materials are used following manufacturers' instructions 
Resilient skirting, reducer and edge strips are set out and installed (as required) 
Completed installation is checked for flaws in installation and materials and faults rectified following workplace procedures 
Unused materials are stored or recycled as required 
Tools and equipment are cleaned and stored appropriately 
Work area is cleaned and rubbish disposed of appropriately 
Workplace documentation and/or reports are completed 

Forms

Assessment Cover Sheet

LMFFL3310A - Cut and install resilient floor coverings to stairs
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

LMFFL3310A - Cut and install resilient floor coverings to stairs

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: