Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

LMFGG3004C Mapping and Delivery Guide
Process thick glass

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency LMFGG3004C - Process thick glass
Description This unit of competency covers the skills and knowledge required to cut, shape, drill and edge annealed and laminated glass, which is greater than 8 mm thick.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit involves the planning, preparation and processing of thick glass sheet and requires individuals to demonstrate discretion, judgement and problem solving in determining the appropriate techniques, methods and equipment to be used. It may be performed individually or in a team environment.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not applicable.
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Identify work requirements
  • Work requirements for processing thick glass, including materials, types of cuts, shapes and edges, processes and quantities required, are identified from work instructions or job order in accordance with workplace procedures
  • Occupational health and safety (OHS) requirements, including personal protective equipment, are observed throughout the work
  • Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition
  • Cutting list and quality standards are determined and procedures identified in accordance with workplace requirements and industry standards
  • Glass to be cut, shaped, drilled or edged is selected using information from the work order, including type of glass, thickness, colour and dimensions
  • Machines, equipment and settings required to perform the work are identified
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the language, literacy and numeracy capacity of the candidate and the work being performed.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently:

interpret work orders and plan processing operations

identify the materials, patterns/plans, processes, machines, equipment and settings to undertake a glass processing task

apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

set up for and prepare to process glass

follow work instructions, operating procedures and inspection practices to:

minimise the risk of injury to self and others

prevent damage to goods, equipment and products

maintain required production output and product quality

as a minimum:

identify and use AS/NZS 4667:2000 Quality requirements for cut-to-size and processed glass

process glass to specifications

complete straight cuts by hand and diamond saws, simple shapes, truncated and radius corners, circles and ovals in annealed and laminated glass greater than 8 mm and up to 1.0 m2

rough and smooth arrise annealed and laminated glass greater than 8 mm by hand and up to 0.5 m2

drill holes with diamond drills in annealed glass greater than 8 mm and up to 0.5 m2

calculate the cost of glass and edgework

work effectively with others.

Context of and specific resources for assessment

The application of competency is to be assessed in the workplace or realistically simulated workplace.

Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian Standard requirements.

The following resources should be made available:

glass sheet/product greater than 8 mm thick

processing facilities/equipment, such as cutting equipment and glass edging/drilling equipment

work table

appropriate work area

work orders

appropriate safety and personal protective equipment.

Method of assessment

Assessment must satisfy the endorsed Assessment Guidelines of the LMF02 Furnishing Industry Training Package.

Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge.

Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure correct interpretation and application.

Assessment may be applied under project-related conditions (real or simulated) and require evidence of process.

Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.

Assessment may be in conjunction with assessment of other units of competency.

Guidance information for assessment


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills include:

collecting, organising and understanding information related to work orders, basic plans and safety procedures

using communication skills to the level required to confirm work requirements and specifications; communicate effectively regarding work requirements with supervisors, other workers and customers; report work outcomes and problems; and relate to people from a range of social, cultural and ethnic backgrounds, and of varying physical and mental abilities

using literacy skills to the level required to understand information related to work orders, including common industry terminology, plans and safety procedures;, prepare reports; and interpret technical information and specifications

planning and organising activities, including the preparation and layout of the work area, and the obtaining of equipment and materials to avoid any backtracking, workflow interruptions or wastage

working with others and in a team by recognising dependencies and using cooperative approaches to optimise workflow and productivity

using mathematical ideas and techniques to correctly complete measurements, calculate area, estimate glass requirements and minimise waste

using pre-checking and inspection techniques to anticipate processing problems, and avoid re-working and wastage

using workplace technology related to the processing of glass, including handling aids, tools, equipment, calculators and measuring devices

modifying activities to cater for variations in workplace contexts and environment

Required knowledge includes:

the qualities and characteristics of glass, including hazards and handling requirements

identification of glass processing equipment, functions and procedures

the set-up and operation of glass processing equipment, including procedures for reporting product defects or equipment faults

workplace safety system requirements related to glass processing

workflow requirements in relation to glass processing

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Thick glass is:

annealed sheet and laminated glass for residential and commercial windows and doors greater than 8 mm thick

structural glass

Materials may include, but are not limited to:

table tops and shower screens

Glass processing by hand includes:

cutting

use of portable diamond saws

shaping

drilling and edging (edging may include arising)

Workplace procedures include:

workplace procedures relating to the use and operation of tools and equipment required for the handling and processing of glass

workplace instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communications

manufacturer instructions for the use of equipment and materials

quality standards and procedures

Personal protective equipment includes:

that prescribed under legislation, regulations and enterprise practices and procedures, and may include:

gloves and gauntlets

safety glasses and footwear

aprons and overalls

Tools and equipment may include, but are not limited to:

cutting tables

tungsten wheel glass cutters

speed cutters

circle cutters

portable diamond saws

L-squares and straight edges

tape measures

glass handling gloves

safety glasses

gauntlets

aprons

marking pens

chinagraph pencils

templates and lubricants

Drilling equipment may include, but is not limited to:

portable diamond drills

glass drilling machine

Edging tools may include, but are not limited to:

edging stones and hand arrisers

upright belt

handheld belt machines

Glass processing tables may include:

air flotation tables

roller castor table or tilt table with air flotation or roller castors

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work requirements for processing thick glass, including materials, types of cuts, shapes and edges, processes and quantities required, are identified from work instructions or job order in accordance with workplace procedures 
Occupational health and safety (OHS) requirements, including personal protective equipment, are observed throughout the work 
Tools, equipment and materials are selected and checked prior to use to ensure they are appropriate for the work, serviceable and in a safe condition 
Cutting list and quality standards are determined and procedures identified in accordance with workplace requirements and industry standards 
Glass to be cut, shaped, drilled or edged is selected using information from the work order, including type of glass, thickness, colour and dimensions 
Machines, equipment and settings required to perform the work are identified 

Forms

Assessment Cover Sheet

LMFGG3004C - Process thick glass
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

LMFGG3004C - Process thick glass

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: