Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEAAVI0033 Mapping and Delivery Guide
Perform routine removal and installation of miscellaneous aircraft electrical hardware or components

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEAAVI0033 - Perform routine removal and installation of miscellaneous aircraft electrical hardware or components
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to remove aircraft electrical hardware
  • Plan removal task with guidance from qualified person, using maintenance documentation and in accordance with standard enterprise procedures
  • Confirm system safety with qualified person
  • Remove electrical hardware in accordance with standard enterprise procedures and maintenance documentation while observing all relevant work health and safety (WHS) requirements
  • Complete and process required documentation in accordance with standard enterprise procedures
  • Tag, pack or discard removed components in accordance with specified procedures
       
Element: Install aircraft electrical hardware
  • Plan installation with guidance from qualified person, using maintenance documentation and in accordance with standard enterprise procedures
  • Confirm correct part numbers of electrical hardware components to be installed against maintenance documentation
  • Perform physical installation of electrical hardware in accordance with maintenance documentation and standard enterprise procedures
  • Complete and process required maintenance documentation in accordance with standard enterprise procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Plan removal task with guidance from qualified person, using maintenance documentation and in accordance with standard enterprise procedures 
Confirm system safety with qualified person 
Remove electrical hardware in accordance with standard enterprise procedures and maintenance documentation while observing all relevant work health and safety (WHS) requirements 
Complete and process required documentation in accordance with standard enterprise procedures 
Tag, pack or discard removed components in accordance with specified procedures 
Plan installation with guidance from qualified person, using maintenance documentation and in accordance with standard enterprise procedures 
Confirm correct part numbers of electrical hardware components to be installed against maintenance documentation 
Perform physical installation of electrical hardware in accordance with maintenance documentation and standard enterprise procedures 
Complete and process required maintenance documentation in accordance with standard enterprise procedures 

Forms

Assessment Cover Sheet

MEAAVI0033 - Perform routine removal and installation of miscellaneous aircraft electrical hardware or components
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEAAVI0033 - Perform routine removal and installation of miscellaneous aircraft electrical hardware or components

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: