• MEM04004B - Prepare and mix sand for metal moulding

Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM04004B Mapping and Delivery Guide
Prepare and mix sand for metal moulding

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM04004B - Prepare and mix sand for metal moulding
Description This unit covers loading up a mixer, mixing the sand, taking test samples and interpreting the results, discharging the sand and cleaning the mixer.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit applies to the mixing of moulding sand in continuous and batch type mills.Band: AUnit Weight: 4
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field Casting and moulding
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Load mixer (mill/muller)
  • All pre start-up checks are performed safely and according to standard operating procedures.
  • Formula for sand mix is determined according to standard operating procedures.
  • Materials are measured and loaded according to formula specification.
       
Element: Mix sand
  • Sand is mixed for correct time to specifications.
  • The performance of mixer and the condition of the sand is monitored.
  • Material supply is maintained.
  • Faults are reported.
       
Element: Take and test samples
  • Sample is correctly extracted.
  • Test is applied in accordance with standard operating procedures.
  • Test results are compared against specifications.
  • Adjustments to formula/mix are made as required in accordance with standard operating procedures.
       
Element: Discharge mixture
  • Load is charged correctly according to standard operating procedures.
  • Unwanted treated sand is disposed of according to standard operating procedures.
       
Element: Clean mixer
  • Mixer is shut down to standard safety and operating procedures.
  • Mixer is cleaned according to standard operating procedures.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

A person who demonstrates competency in this unit must be able to prepare and mix moulding sand.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts.

Context of and specific resources for assessment

This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.

This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with mixing moulding sand or other units requiring the exercise of the skills and knowledge covered by this unit.

Method of assessment

Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.

Guidance information for assessment


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Look for evidence that confirms skills in:

reading and following written instructions and standard operating procedures

setting parameters for mixing

loading mixers

mixing sand and monitoring the process

sampling and testing mixed sand

discharging sand

closing down and cleaning

using measurement skills for preparing and mixing sand within the scope of this unit

Required knowledge

Look for evidence that confirms knowledge of:

characteristics, safe handling procedure and mixture applications of sand and binding agent

moulding requirements

mixers, applications, loading, operating and unloading procedures

volumes, quantities, ratios and percentages

sampling, testing and acceptance criteria for mixed sand

procedures for cleaning and shutting down mixer

environmental requirements for the disposal of unwanted sand

use and application of personal protective equipment

safe work practices and procedures

hazards and control measures related to preparing and mixing sand for metal moulding

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Materials

Sand, silica, zircon, chromite, mixtures, water

Faults

Chemical ratios - acid, binder, water

Mixer

Batch and continuous mixers

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
All pre start-up checks are performed safely and according to standard operating procedures. 
Formula for sand mix is determined according to standard operating procedures. 
Materials are measured and loaded according to formula specification. 
Sand is mixed for correct time to specifications. 
The performance of mixer and the condition of the sand is monitored. 
Material supply is maintained. 
Faults are reported. 
Sample is correctly extracted. 
Test is applied in accordance with standard operating procedures. 
Test results are compared against specifications. 
Adjustments to formula/mix are made as required in accordance with standard operating procedures. 
Load is charged correctly according to standard operating procedures. 
Unwanted treated sand is disposed of according to standard operating procedures. 
Mixer is shut down to standard safety and operating procedures. 
Mixer is cleaned according to standard operating procedures. 

Forms

Assessment Cover Sheet

MEM04004B - Prepare and mix sand for metal moulding
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM04004B - Prepare and mix sand for metal moulding

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: