Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM18093B Mapping and Delivery Guide
Maintain and repair integrated industrial refrigeration and/or large air handling system controls

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM18093B - Maintain and repair integrated industrial refrigeration and/or large air handling system controls
Description This unit covers repairing/replacing integrated industrial refrigeration and/or air handling system controls.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit applies to installation, adjustment, repairs, replacements and overhauls undertaken to site or manufacturers' specifications, using application of principles of industrial refrigeration and/or air handling systems control sequencing which may include: PLCs relay logic control systems, unitised/modular sensors, transducers, timers, counters and associated equipment.In applying this competency, system circuit components are identified, traced, inspected and operational function is assessed and verified using refrigeration/air conditioning principles to predetermined specifications interpreted for data sheets and circuit diagrams. The application of this competency must cover a variety of refrigeration equipment and systems.Band: BUnit Weight: 8
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Path 1MEM09002B Interpret technical drawing MEM10002B Terminate and connect electrical wiring MEM12002B Perform electrical/electronic measurement MEM12023A Perform engineering measurements MEM18001C Use hand tools MEM18002B Use power tools/hand held operations MEM18049C Disconnect/reconnect fixed wired equipment up to 1000 volts a.c./1500 volts d.c. MEM18055B Dismantle, replace and assemble engineering components MEM18086B Test, recover, evacuate and charge refrigeration systems MEM18090B Maintain and repair industrial refrigeration systems and components Path 2MEM09002B Interpret technical drawing MEM10002B Terminate and connect electrical wiring MEM12002B Perform electrical/electronic measurement MEM12023A Perform engineering measurements MEM18001C Use hand tools MEM18002B Use power tools/hand held operations MEM18049C Disconnect/reconnect fixed wired equipment up to 1000 volts a.c./1500 volts d.c. MEM18055B Dismantle, replace and assemble engineering components MEM18086B Test, recover, evacuate and charge refrigeration systems MEM18089B Maintain and repair central air handling systems
Competency Field Maintenance and diagnostics
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Install/replace refrigeration/air handling system controls
  • Refrigeration/air handling control principles and system diagrams are interpreted.
  • Control system/circuit components are identified and inspected for compliance to specifications.
  • Sequential installation is undertaken according to manufacturers' specifications and standard operating procedures.
       
Element: Check and adjust refrigeration/air handling system control sequence and operation
  • The temperature, quality, pressure and properties of the air delivered by the air handling system is checked for conformance to specification.
  • Controls and system operation are checked against operational specifications using appropriate test equipment and application of principles/techniques.
  • Adjustments are performed to sequence system to meet/align to operational requirements and specifications.
  • Modifications/alterations are recorded and reported in accordance with standard operating procedures.
  • Controls and system operation are checked and commissioned to specifications.
       
Element: Fault find refrigeration/air handling system control circuits
  • Control system/circuit diagrams and data sheets are interpreted.
  • Control system/circuit components are identified and inspected.
  • Control system/circuit is traced and action of components is diagnosed to identify and localise faults.
  • Control system/circuit parts are tested using appropriate test equipment and application principles.
  • Control system/circuit parts are assessed against operational specification.
  • Fault condition is localised at the component level.
  • Faulty condition is evaluated, root cause is analysed and corrective action is planned.
       
Element: Maintain, repair/replace system control components
  • Correct maintenance procedures are applied according to standard operating procedures.
  • Repair procedures are selected and applied using correct and appropriate techniques, tools and equipment.
  • Faulty items are tested, repaired or replaced using sequential installation procedures according to manufacturers' specifications.
  • Replacement items are selected from manufacturers' catalogues to meet specifications.
  • System control components are reassembled using appropriate principles and procedures according to specification.
       
Element: Check and adjust sequence of refrigeration/air handling system controls
  • Using circuit diagram and refrigeration/air handling system control principles, circuit sensors and controllers are identified.
  • Necessary adjustments are made to sequence system control circuit to meet operational specification.
  • Correct operation of system control circuit is checked and confirmed against operational specification.
  • Refrigeration/air handling system controls are commissioned to specification.
  • Appropriate follow-up procedures are adopted.
  • Service/maintenance report is completed to standard operating procedures.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

A person who demonstrates competency in this unit must be able to maintain and repair integrated industrial refrigeration and/or large air handling system controls. Competency in this unit cannot be claimed until all prerequisites have been satisfied.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts.

Context of and specific resources for assessment

This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.

This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with the repair/replacement of integrated industrial refrigeration and air handling systems, or other units requiring the exercise of the skills and knowledge covered by this unit.

Method of assessment

Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.

Guidance information for assessment


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Look for evidence that confirms skills in:

using tools, techniques and equipment necessary to check integrated industrial refrigeration and/or large air handling system controls for correct operation

obtaining, reading and interpreting specifications

comparing system and component/circuit control performance/operation against specification

identifying faulty components and non-compliances

making required adjustments to achieve specifications

sourcing and using relevant catalogues/lists

applying safety procedures, standard operating procedures and legislative requirements to all work undertaken

documenting results of the adjustments

reading, interpreting and following information on written job instructions, specifications, standard operating procedures, charts, lists, drawings and other applicable reference documents

planning and sequencing operations

checking task-related information

undertaking calculations and numerical operations within the scope of this unit

Required knowledge

Look for evidence that confirms knowledge of:

safe work practices and procedures

system operational requirements and specifications

application of common refrigeration/air handling system components and controllers

importance of following installation procedures in terms of control operation, safety and reliability

measuring instruments/equipment and specifications for checking air temperatures, air flows, air quality and air properties

procedures for reporting non-conformances

refrigeration/air conditioning test equipment and application

operational sequence of systems

typical adjustments to correct sequencing variations from specification

procedures for recording/reporting modifications/alterations

typical causes of component failure

procedures for rectifying faulty conditions

maintenance schedule and procedures

common adjustments that can be made to control systems and their effect

procedures for returning to service or commissioning refrigeration/air handling control systems

maintenance/service recording/reporting requirements

hazard and control measures associated with maintaining and repairing integrated industrial refrigeration and/or large air handling system controls, including housekeeping

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Test equipment

Multimeter, ammeter, megohm meter, cable analyser, pressure gauges

Adjustments

Pressure controls, timers, thermostats

Modifications/alterations

Pressure control settings, timer settings, thermostat settings. Must comply with manufacturers' specifications. Must be documented in site drawings/documents

Maintenance procedures

Testing of all control sequences, testing of all safety devices

Corrective action

Replacement, repair, adjustment

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Refrigeration/air handling control principles and system diagrams are interpreted. 
Control system/circuit components are identified and inspected for compliance to specifications. 
Sequential installation is undertaken according to manufacturers' specifications and standard operating procedures. 
The temperature, quality, pressure and properties of the air delivered by the air handling system is checked for conformance to specification. 
Controls and system operation are checked against operational specifications using appropriate test equipment and application of principles/techniques. 
Adjustments are performed to sequence system to meet/align to operational requirements and specifications. 
Modifications/alterations are recorded and reported in accordance with standard operating procedures. 
Controls and system operation are checked and commissioned to specifications. 
Control system/circuit diagrams and data sheets are interpreted. 
Control system/circuit components are identified and inspected. 
Control system/circuit is traced and action of components is diagnosed to identify and localise faults. 
Control system/circuit parts are tested using appropriate test equipment and application principles. 
Control system/circuit parts are assessed against operational specification. 
Fault condition is localised at the component level. 
Faulty condition is evaluated, root cause is analysed and corrective action is planned. 
Correct maintenance procedures are applied according to standard operating procedures. 
Repair procedures are selected and applied using correct and appropriate techniques, tools and equipment. 
Faulty items are tested, repaired or replaced using sequential installation procedures according to manufacturers' specifications. 
Replacement items are selected from manufacturers' catalogues to meet specifications. 
System control components are reassembled using appropriate principles and procedures according to specification. 
Using circuit diagram and refrigeration/air handling system control principles, circuit sensors and controllers are identified. 
Necessary adjustments are made to sequence system control circuit to meet operational specification. 
Correct operation of system control circuit is checked and confirmed against operational specification. 
Refrigeration/air handling system controls are commissioned to specification. 
Appropriate follow-up procedures are adopted. 
Service/maintenance report is completed to standard operating procedures. 

Forms

Assessment Cover Sheet

MEM18093B - Maintain and repair integrated industrial refrigeration and/or large air handling system controls
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM18093B - Maintain and repair integrated industrial refrigeration and/or large air handling system controls

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: