Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MEM20007A Mapping and Delivery Guide
Plan and prepare a masterkey system

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MEM20007A - Plan and prepare a masterkey system
Description This unit covers creating a new masterkey system for in-line pin tumbler cylinders up to and including a hierarchical GGMK system and maisoning.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit applies to manually developing a standard (even cut) progression in-line MK system and using a computer masterkeying package. Tools and equipment used would include pen paper, computer.All relevant legislative requirements, policies and procedures and codes of practice are adhered to including hazardous risk recognition and assessment, working safely around tools and equipment, emergency procedures, administering first aid.If a security survey/site assessment is required, then Unit MEM20014A (Perform a site security survey) should also be selected.For cross keying, submasterkeying and selective keying, refer to Unit MEM20008A (Develop and implement a masterkey system).Band: AUnit Weight: 4
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Path 1MEM20001A Produce keys MEM20002A Assemble and test lock mechanisms
Competency Field Locksmithing
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Assess customer requirements
  • Customer needs are discussed and clarified according to organisational procedures.
  • Appropriate levels of security/access are reviewed with respect to customer assets, activities and existing security arrangements.
  • Door and lock schedules and other appropriate documentation are prepared according to organisational procedures.
  • Customer requirements are matched to the mechanical possibilities and limitations of masterkey systems.
  • Options are identified and customer is advised on options and alternatives.
  • Personal limitations in assessing requirements for key systems and masterkey systems are identified and assistance is sought from appropriate person(s) in accordance with organisational procedures.
       
Element: Design masterkey system
  • Keying matrix is developed to customer requirements, allowing for future system expansion and mechanical capabilities of system.
  • Key codes (progression chart) are produced from mathematical permutations and calculations as per customer requirements.
  • Key codes are selected from progression chart that maximise system security.
  • Key cutting and cylinder loading charts are accurately developed.
  • Incidental masterkeys are identified within progression charts.
  • Principles of masterkeying are applied in accordance with industry practice and organisational requirements.
       
Element: Finalise system design
  • Final system design and keying requirements are reviewed and confirmed with appropriate person(s) in accordance with organisational requirements.
  • Documentation is accurately prepared and processed and stored in accordance with client, legislative and organisational requirements.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

A person who demonstrates competency in this unit must be able to survey and prepare a masterkey system to in-line GMK level. Competency in this unit cannot be claimed until all prerequisites have been satisfied.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and be capable of applying the competency in new and different situations and contexts.

Context of and specific resources for assessment

This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.

This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with surveying and preparing masterkey systems, or other units requiring the exercise of the skills and knowledge covered by this unit.

Method of assessment

Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency. The candidate must have access to all tools, equipment, materials and documentation required. The candidate must be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.

Guidance information for assessment


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Look for evidence that confirms skills in:

listening and questioning

reading architectural plans, floor plans and charts

applying calculations and formulae within the scope of this unit

recording information on a floor plan

developing key matrix

developing and reading progression charts

selecting codes from a progression chart that maximise system security

checking own and others' codes for interchange

identifying incidental masters in a key system

selecting groups of codes to form a maisioned cylinder

creating saving and storing information/documentation related

using key system

Required knowledge

Look for evidence that confirms knowledge of:

record keeping and management

manufacturers'/Australian/building standards

product knowledge/limitations

key matrixes and schedules

allowances for expansion

operation and limitations of masterkey systems

levels of systems (KD, KA, MK, GMK, GGMK)

door handing

cylinder types

criteria for key code selection

strategies for checking key systems for interchange

strategies for checking key systems for incidental masters

principles of maison keying

strategies for code selection

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Reviewed

Physically and/or off the plan

Customer requirements

Specific client requirements and quantities, completion times and dates, job requirements and tasks, signature authorities, OHS requirements, company requirements, compliance with relevant manufacturer requirements, warranties and service information.

Key systems

Restricted, semi-restricted and non-restricted system numbers, manufacturer restricted, factory restricted, locksmith restricted/managed, association restricted.

Levels including (KD, KA, MK,GMK,GGMK)

Masterkey system

A generic term to describe a group of cylinders operated by more than one key

System expansion

Creation of excess codes to allow for lost keys, unusable codes and future customer requirements, multibroaching

Calculations

Mathematical patterns

Documentation

Materials used, identified faults, warranties and recommendations, costs.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Customer needs are discussed and clarified according to organisational procedures. 
Appropriate levels of security/access are reviewed with respect to customer assets, activities and existing security arrangements. 
Door and lock schedules and other appropriate documentation are prepared according to organisational procedures. 
Customer requirements are matched to the mechanical possibilities and limitations of masterkey systems. 
Options are identified and customer is advised on options and alternatives. 
Personal limitations in assessing requirements for key systems and masterkey systems are identified and assistance is sought from appropriate person(s) in accordance with organisational procedures. 
Keying matrix is developed to customer requirements, allowing for future system expansion and mechanical capabilities of system. 
Key codes (progression chart) are produced from mathematical permutations and calculations as per customer requirements. 
Key codes are selected from progression chart that maximise system security. 
Key cutting and cylinder loading charts are accurately developed. 
Incidental masterkeys are identified within progression charts. 
Principles of masterkeying are applied in accordance with industry practice and organisational requirements. 
Final system design and keying requirements are reviewed and confirmed with appropriate person(s) in accordance with organisational requirements. 
Documentation is accurately prepared and processed and stored in accordance with client, legislative and organisational requirements. 

Forms

Assessment Cover Sheet

MEM20007A - Plan and prepare a masterkey system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM20007A - Plan and prepare a masterkey system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: