Install engineered timber flooring

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSFFL2024 - Install engineered timber flooring
Description
Employability Skills
Learning Outcomes and Application This unit of competency covers floating or installing stick by stick an engineered timber floor within a space over a soft underlay, including preparation, cutting, laying and fixing. It applies to a variety of flooring technology installation operations in an on-site environment and involves application of skills and knowledge at the sub-trade worker level. Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must:

hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors

have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification

be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.

Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.

Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.

Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.

Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.

Access is required to a realistic installation workplace location, and materials and equipment relevant for the installation of engineered timber flooring.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare materials for installation
  • Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing engineered timber flooring are verified and complied with
  • WHS requirements, including personal protection needs, are observed throughout the work
  • Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  • Sub-floor condition is assessed for suitability for installation of engineered timber flooring
  • Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • Sequence of work is planned, including the selection of a starting point, to ensure efficiency and quality of installation
       
Element: Set out materials for installation
  • Engineered timber flooring is acclimatised according to manufacturer recommendations
  • Engineered timber flooring for fixing is organised and used in accordance with relevant safety management requirements
  • Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining
  • Adhesives and edge strips are prepared for use as required
       
Element: Lay out flooring
  • Instructions and sequence for laying and fixing are followed
  • Engineered timber flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins
  • The aesthetics of the materials are maximised, including matching grains and colours
  • Engineered timber flooring materials are accurately and clearly marked for cutting
  • Materials are cut to length and size for final laying ensuring minimum waste
       
Element: Lay flooring
  • Materials for fixing are organised and used in accordance with relevant safety management requirements
  • Adhesives and edge strips/accessories are prepared for use as required
  • Fixing methods and equipment are used following manufacturer recommendations
  • Appropriate field and perimeter expansion joints are allowed
  • Skirting boards or cover trims are fitted/re-fitted and finished
  • Finished job is inspected and any imperfections are rectified following workplace procedures
  • Any required preparations for sanding of flooring are made
       
Element: Complete housekeeping
  • Unused materials are stored or recycled as required
  • Tools and equipment are cleaned and stored appropriately
  • Work area is cleaned and rubbish is disposed of appropriately
  • Workplace documentation is completed
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare materials for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing engineered timber flooring are verified and complied with

1.2

WHS requirements, including personal protection needs, are observed throughout the work

1.3

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.4

Sub-floor condition is assessed for suitability for installation of engineered timber flooring

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned, including the selection of a starting point, to ensure efficiency and quality of installation

2

Set out materials for installation

2.1

Engineered timber flooring is acclimatised according to manufacturer recommendations

2.2

Engineered timber flooring for fixing is organised and used in accordance with relevant safety management requirements

2.3

Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining

2.4

Adhesives and edge strips are prepared for use as required

3

Lay out flooring

3.1

Instructions and sequence for laying and fixing are followed

3.2

Engineered timber flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins

3.3

The aesthetics of the materials are maximised, including matching grains and colours

3.4

Engineered timber flooring materials are accurately and clearly marked for cutting

3.5

Materials are cut to length and size for final laying ensuring minimum waste

4

Lay flooring

4.1

Materials for fixing are organised and used in accordance with relevant safety management requirements

4.2

Adhesives and edge strips/accessories are prepared for use as required

4.3

Fixing methods and equipment are used following manufacturer recommendations

4.4

Appropriate field and perimeter expansion joints are allowed

4.5

Skirting boards or cover trims are fitted/re-fitted and finished

4.6

Finished job is inspected and any imperfections are rectified following workplace procedures

4.7

Any required preparations for sanding of flooring are made

5

Complete housekeeping

5.1

Unused materials are stored or recycled as required

5.2

Tools and equipment are cleaned and stored appropriately

5.3

Work area is cleaned and rubbish is disposed of appropriately

5.4

Workplace documentation is completed

Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing engineered timber flooring, including ventilation standards

Apply safe handling requirements for equipment, products and materials, including the use of personal protective equipment

Follow work instructions, operating procedures and inspection practices to:

minimise the risk of injury to self and others

prevent damage to goods, equipment and products

maintain required production output and product quality

Complete the following different types of installation:

direct stick system

self-locking system

inserted plastic tongue system

Modify activities to cater for variations in workplace contexts and environment

Collect, organise and understand information related to work orders, basic plans and safety procedures

Communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the reporting of work outcomes and problems

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

Use pre-checking and inspection techniques to anticipate installation problems to avoid re-work and wastage

Recognise and respond to circumstances outside instructions or personal competence

Plan and organise activities, including the preparation and layout of the worksite and the obtaining of equipment and materials, to avoid any backtracking, work flow interruptions or wastage

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate other material requirements

Maintain current knowledge of:

tools and materials

parquetry installation techniques

Use the limited workplace technology related to the timber flooring installing requirement, including tools, equipment, calculators and measuring devices

State or territory WHS legislation, regulations, standards and codes of practice relevant to the installation of engineered timber flooring

Organisational and site standards, requirements, policies and procedures for the installation of engineered timber flooring

Types, characteristics, uses and limitations of:

engineered timber flooring

installation adhesives

The types and uses of installation tools and equipment

Workplace safety systems relevant to the installation of engineered timber flooring

Characteristics and requirements of sub-floor preparation

Work flow in relation to flooring installation operations

Environmental protection requirements

Established communication channels and protocols

Relevant problem identification and resolution

Appropriate mathematical procedures for estimation and measurement

Procedures for the recording, reporting and maintenance of workplace records and information


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare materials for installation

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing engineered timber flooring are verified and complied with

1.2

WHS requirements, including personal protection needs, are observed throughout the work

1.3

Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.4

Sub-floor condition is assessed for suitability for installation of engineered timber flooring

1.5

Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.6

Sequence of work is planned, including the selection of a starting point, to ensure efficiency and quality of installation

2

Set out materials for installation

2.1

Engineered timber flooring is acclimatised according to manufacturer recommendations

2.2

Engineered timber flooring for fixing is organised and used in accordance with relevant safety management requirements

2.3

Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining

2.4

Adhesives and edge strips are prepared for use as required

3

Lay out flooring

3.1

Instructions and sequence for laying and fixing are followed

3.2

Engineered timber flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins

3.3

The aesthetics of the materials are maximised, including matching grains and colours

3.4

Engineered timber flooring materials are accurately and clearly marked for cutting

3.5

Materials are cut to length and size for final laying ensuring minimum waste

4

Lay flooring

4.1

Materials for fixing are organised and used in accordance with relevant safety management requirements

4.2

Adhesives and edge strips/accessories are prepared for use as required

4.3

Fixing methods and equipment are used following manufacturer recommendations

4.4

Appropriate field and perimeter expansion joints are allowed

4.5

Skirting boards or cover trims are fitted/re-fitted and finished

4.6

Finished job is inspected and any imperfections are rectified following workplace procedures

4.7

Any required preparations for sanding of flooring are made

5

Complete housekeeping

5.1

Unused materials are stored or recycled as required

5.2

Tools and equipment are cleaned and stored appropriately

5.3

Work area is cleaned and rubbish is disposed of appropriately

5.4

Workplace documentation is completed

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Legislative requirements include:

applicable legislation from all levels of government that affect organisational operation

award and enterprise agreements

industrial relations

Australian Standards

confidentiality and privacy

WHS

the environment

equal employment opportunity (EEO)

anti-discrimination

relevant industry codes of practice

duty of care and heritage

WHS requirements include:

Commonwealth, state or territory legislation and regulations

organisational safety policies and procedures

the use of personal protective equipment and clothing

firefighting equipment

first aid equipment

hazard and risk control and elimination

control of hazardous materials and substances

manual handling, including lifting and carrying

Organisational requirements include:

legal, organisational and site guidelines

policies and procedures relating to own role and responsibility

quality assurance

procedural manuals

quality and continuous improvement processes and standards

WHS

emergency and evacuation

ethical standards

recording and reporting

access and equity principles and practices

equipment use, maintenance and storage

environmental management (waste disposal, recycling and re-use guidelines)

Instructions include:

workplace procedures relating to the use and operation of tools and equipment

workplace instructions, instructions, including job sheets, plans, drawings and designs

workplace procedures relating to reporting and communications

manufacturer instructions for the use of equipment and materials

Sub-floor assessment includes:

testing for moisture content, expansion, rot, structural strength, smoothness and plane

Tools and equipment include:

drop saw

jig saw

hand saw

undercut saw

plunge saw

hammer

bar scriber

utility knife

circular saw

bench saw

straight edge

glue gun

staple gun

nailers

flooring cramps

strap clamps

wall clamps

Materials include:

timber flooring materials

underlay

edge strips

tapes

adhesives

Adhesives include:

polyvinyl alcohol (PVA)

epoxy

polyurethane elastomeric

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Applicable work health and safety (WHS), legislative and organisational requirements relevant to installing engineered timber flooring are verified and complied with 
WHS requirements, including personal protection needs, are observed throughout the work 
Instructions and/or plans are read and interpreted to identify process required to complete work tasks 
Sub-floor condition is assessed for suitability for installation of engineered timber flooring 
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Sequence of work is planned, including the selection of a starting point, to ensure efficiency and quality of installation 
Engineered timber flooring is acclimatised according to manufacturer recommendations 
Engineered timber flooring for fixing is organised and used in accordance with relevant safety management requirements 
Skirting boards or cover trims are removed or undercut, if required, and stored for re-fitting or sent for machining 
Adhesives and edge strips are prepared for use as required 
Instructions and sequence for laying and fixing are followed 
Engineered timber flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins 
The aesthetics of the materials are maximised, including matching grains and colours 
Engineered timber flooring materials are accurately and clearly marked for cutting 
Materials are cut to length and size for final laying ensuring minimum waste 
Materials for fixing are organised and used in accordance with relevant safety management requirements 
Adhesives and edge strips/accessories are prepared for use as required 
Fixing methods and equipment are used following manufacturer recommendations 
Appropriate field and perimeter expansion joints are allowed 
Skirting boards or cover trims are fitted/re-fitted and finished 
Finished job is inspected and any imperfections are rectified following workplace procedures 
Any required preparations for sanding of flooring are made 
Unused materials are stored or recycled as required 
Tools and equipment are cleaned and stored appropriately 
Work area is cleaned and rubbish is disposed of appropriately 
Workplace documentation is completed 

Forms

Assessment Cover Sheet

MSFFL2024 - Install engineered timber flooring
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL2024 - Install engineered timber flooring

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: