Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

MSMRV375 Mapping and Delivery Guide
Complete installing recreational vehicle walls and roofs

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency MSMRV375 - Complete installing recreational vehicle walls and roofs
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to complete installing walls and roofs
  • Identify walls and roof installation completion requirements from job instructions
  • Select and check all required tools and equipment are ready to use
  • Gather wall and roof materials and other items required by job specifications, and check they meet quality requirements and are ready for installation
  • Identify hazards and hazard controls and check the hazard controls are in place and operating
  • Check the recreational vehicle and work area are ready to complete installing the walls and roof
       
Element: Install insulation and cladding
  • Cut insulation to fit the area and to ensure it is clear from wiring
  • Press insulation into place
  • Cut the cladding according to job instructions
  • Make penetrations in the cladding for cables, wires, switches and fitting-off items
  • Apply adhesive and lift, align in the correct position and fasten the cladding using safe manual handling practices
  • Trim off excess and finish fitting the cladding to meet quality requirements
       
Element: Install checker plate and finishing mouldings
  • Cut the checker plate according to job specifications
  • Make penetrations in the checker plate for external and fit-off items
  • Cut mouldings to size and fit them
  • Apply adhesive and lift, correctly position and fasten the checker plate using safe manual handling practices and according to job procedures
  • Trim off excess and finish fitting the checker plate to meet quality requirements
  • Install finishing moulding around walls, the roof and checker plate according to workplace standards
       
Element: Complete the installation according to workplace procedures
  • Clean up the recreational vehicle in readiness for the next task
  • Clean up the work area, identify items for recycling and dispose of waste
  • Identify, tag and report any damage to equipment and tools
  • Check, clean and do routine maintenance on equipment and tools and store them and unused materials
  • Complete task outcome documentation
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify walls and roof installation completion requirements from job instructions 
Select and check all required tools and equipment are ready to use 
Gather wall and roof materials and other items required by job specifications, and check they meet quality requirements and are ready for installation 
Identify hazards and hazard controls and check the hazard controls are in place and operating 
Check the recreational vehicle and work area are ready to complete installing the walls and roof 
Cut insulation to fit the area and to ensure it is clear from wiring 
Press insulation into place 
Cut the cladding according to job instructions 
Make penetrations in the cladding for cables, wires, switches and fitting-off items 
Apply adhesive and lift, align in the correct position and fasten the cladding using safe manual handling practices 
Trim off excess and finish fitting the cladding to meet quality requirements 
Cut the checker plate according to job specifications 
Make penetrations in the checker plate for external and fit-off items 
Cut mouldings to size and fit them 
Apply adhesive and lift, correctly position and fasten the checker plate using safe manual handling practices and according to job procedures 
Trim off excess and finish fitting the checker plate to meet quality requirements 
Install finishing moulding around walls, the roof and checker plate according to workplace standards 
Clean up the recreational vehicle in readiness for the next task 
Clean up the work area, identify items for recycling and dispose of waste 
Identify, tag and report any damage to equipment and tools 
Check, clean and do routine maintenance on equipment and tools and store them and unused materials 
Complete task outcome documentation 

Forms

Assessment Cover Sheet

MSMRV375 - Complete installing recreational vehicle walls and roofs
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSMRV375 - Complete installing recreational vehicle walls and roofs

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: