Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
NWP216B Mapping and Delivery Guide
Install basic metering equipment and flow control devices for irrigation systems
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | NWP216B - Install basic metering equipment and flow control devices for irrigation systems |
---|---|---|---|
Description | This unit of competency describes the outcomes required to install meters, flow control and regulating devices for irrigation systems. These installations may occur in ground and surface water source irrigation systems. | ||
Employability Skills | The required outcomes described in this unit of competency contain applicable facets of employability skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying employability skill requirements. | ||
Learning Outcomes and Application | This unit supports the attainment of skills and knowledge required for field and operational staff involved in the accurate installation of key water industry metering and flow control devices. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Not applicable. | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work. |
| |||||||
Element: Install flow control devices in irrigation systems. |
| |||||||
Element: Install metering devices in irrigation systems. |
| |||||||
Element: Maintain flow control and metering devices in irrigation systems. |
| |||||||
Element: Review, record and report activities. |
|