Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
NWPNET021 Mapping and Delivery Guide
Install metering equipment
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | NWPNET021 - Install metering equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit describes the skills required to plan prepare and install metering equipment.This unit applies to those working as a field staff with specific responsibility for ensuring that the installation of meter equipment is completed in compliance with all relevant organisational and statutory requirements. The skills and knowledge described in this unit must be applied within the legislative, regulatory and policy environment in which they are carried out. Organisational policies and procedures must be consulted and adhered to. Those undertaking this unit would work under indirect supervision while performing routine tasks, in a familiar context, and ensuring minimum damage to the environment. No licensing, legislative or certification requirements apply to unit at the time of publication. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. Competency should be assessed in an actual workplace or in a simulated environment, with access to equipment and infrastructure appropriate to the outcome. Competency should be demonstrated over time to ensure the candidate is assessed across a variety of situations. Assessors must satisfy the NVR/AQTF mandatory competency requirements for assessors. |
||
Prerequisites/co-requisites | |||
Competency Field | Networks |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare work |
| |||||||
Element: Read metering equipment |
| |||||||
Element: Install flow control and metering devices |
| |||||||
Element: Maintain flow control and metering devices |
| |||||||
Element: Finalise work and complete documentation |
| |||||||
Element: Plan and prepare work |
| |||||||
Element: Read metering equipment |
| |||||||
Element: Install flow control and metering devices |
| |||||||
Element: Maintain flow control and metering devices |
| |||||||
Element: Finalise work and complete documentation |
|