• PMAOPS222B - Operate and monitor pumping systems and equipment

Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

PMAOPS222B Mapping and Delivery Guide
Operate and monitor pumping systems and equipment

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency PMAOPS222B - Operate and monitor pumping systems and equipment
Description In a typical scenario a prime mover is used to drive a complete pumping system including pumps and ancillary equipment (eg, vibration monitors, lubrication pumps and equipment, gear boxes and barring gear). The pumps covered by this unit typically are used for hydrocarbon transmission lines.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application The operations technician would:identify and report operational problemsbe aware of and contribute to a safe working environmentcontribute to the safe and productive operation of the pumpmonitor, shut down and start up pump and ancillary equipment using relevant procedures.This unit only applies to pumping systems and equipment which are driven by prime movers and does not include systems with close coupled motors (see PMAOPS201B Operate fluid flow equipment).This unit includes starting up/shutting down the system and monitoring the performance of the equipment including responding to the requirements of emergency situations Generally the operator would be part of a team during start up and shut down procedures and would be expected to be capable of demonstrating competence in all parts of this unit. At all times they would be liaising and cooperating with other members of the team.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites PMAOPS221B Operate and monitor prime movers
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare for work.
  • Identify work requirements
  • Identify and control hazards
  • Coordinate with appropriate personnel
       
Element: Prepare equipment for operation
  • Check operation and function of pump and driver by applying principles of operation and procedures
  • Check the operational area to ensure that any potential hazards which may affect the operation of the equipment are removed
  • Conduct pre-start-up checks on the driver and pump to ensure that all nominated operational valves are correctly sequenced before commencing pumping operations, and that all safety requirements are met.
       
Element: Start up/shut down pump.
  • Commission pump protection devices and ancillary equipment in accordance with procedures.
  • Start up prime mover to procedures
  • Bring pump on line
  • Shut down pump as required
  • Perform emergency shut down when required.
       
Element: Monitor and assess pumping systems and equipment.
  • Verify the operational condition of all flanges, gaskets and seals to ensure that the operational integrity of these components is maintained within stated operational tolerances and to avoid any environmental damage
  • Monitor pumping installations/equipment to determine if the correct pump pressures, temperatures and flows conform to their required application
  • Monitor and regularly check pumping systems/ equipment performance and all components to identify any signs of excessive wear and diminution of performance
  • Check operational valves and valve assemblies for possible leakages
  • Monitor and identify variations in the operating conditions of the pumping systems/equipment through the interpretation of amperage operating data and equipment
  • Periodically check and clean filter systems to remove any potential blockages or impurities entering the pumping system/equipment and causing it to cavitate or malfunction during operation
  • Inspect and sample lubrication oil to check that operating levels are correct and to determine if any contamination has taken place which may affect the operational capacity of the pumping system/equipment.
  • Take appropriate action resulting from checks and monitoring.
       
Element: Identify maintenance requirements.
  • Conduct routine inspections and checks to ensure normal or stated pump operation is maintained
  • Identify equipment faults through observation of the operational equipment and periodic sampling and testing
  • Take appropriate action
  • Record operational data as required by procedures.
       
Element: Isolate and de-isolate plant.
  • Isolate plant
  • Make safe for required work
  • Check plant is ready to be returned to service
  • Prepare plant for return to service.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations, which will include disruptions to normal, smooth operation.

Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios, role plays and 3D virtual reality interactive systems. In the case of evacuation training or training for competencies practised in life threatening situations, simulation may be used for the bulk of the training.

This unit of competency requires an application of the knowledge contained in the use of pumps and their integral equipment, to the level needed to maintain control and recognise and resolve problems. This can be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk-throughs of abnormal operations) and off the plant.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.

Consistent performance should be demonstrated. In particular look to see that:

early warning signs of equipment/processes needing attention or with potential problems are recognised

the range of possible causes can be identified and analysed and the most likely cause determined

appropriate action is taken to ensure a timely return to full performance

obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.

These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations, which may have been generated from the past incident history of pump, incidents on similar pumps around the world, hazard analysis activities and similar sources.

Context of and specific resources for assessment

As a general rule assessment will require access to an operating an operating pump system over an extended period of time, or a suitable method of gathering evidence of operating competence over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.

Method of assessment

In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.

Guidance information for assessment

Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This describes the essential skills and knowledge and their level, required for this unit.

Required skills

Competence includes the ability to and be able to distinguish between causes of problems/alarms/fault indications such as:

instrument failure malfunction

electrical failure malfunction

mechanical failure malfunction

equipment design deficiencies

product parameters (temperature, viscosity, purity)

fouling or contamination, eg filters, exchangers, seal system, lubrication

cavitation

overheating (bearings, casing etc)

overload.

Required knowledge

The knowledge referred to in the Evidence Guide for this unit includes:

all items on a schematic of the pump system and the function of each

pumping system/equipment operating parameters

sampling and testing techniques

equipment terminology

plant or field layout or geography

safety systems and procedures

fault finding and troubleshooting techniques

job hazard analysis.

principles of operation of pump, ancillaries and components

physics and chemistry relevant to the pump, ancillaries and the materials processed

process parameters and limits, eg temperature, pressure, flow, pH

duty of care obligations

hierarchy of control

communication protocols, eg radio, phone, computer, paper, permissions/authorities

relevant alarms and actions

plant process idiosyncrasies

correct methods of starting, stopping, operating and controlling process

corrective action appropriate to the problem cause

function and troubleshooting of major components and their problems

types and causes of problems within operator's scope of skill level and responsibility.

The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.

Codes of practice/ standards

Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.

Context

This unit of competency includes all such items of equipment and unit operations which form part of the pumping system. For your plant this may include (select relevant items):

beam pumps

electrical submersible pumps

jet pumps

centrifugal pumps

positive displacement pumps, eg reciprocating pumps

various drivers (diesel engine, electric motor, steam turbine etc)

instrumentation

filters.

Typical problems

Typical problems for your plant may include:

variation in feed

vibration

control of level, temperature, pressure and flow

blockages

overheating

overloading.

Health, safety and environment (HSE)

All operations to which this unit applies are subject to stringent health, safety and environment requirements, which may be imposed through State or Federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify work requirements 
Identify and control hazards 
Coordinate with appropriate personnel 
Check operation and function of pump and driver by applying principles of operation and procedures 
Check the operational area to ensure that any potential hazards which may affect the operation of the equipment are removed 
Conduct pre-start-up checks on the driver and pump to ensure that all nominated operational valves are correctly sequenced before commencing pumping operations, and that all safety requirements are met. 
Commission pump protection devices and ancillary equipment in accordance with procedures. 
Start up prime mover to procedures 
Bring pump on line 
Shut down pump as required 
Perform emergency shut down when required. 
Verify the operational condition of all flanges, gaskets and seals to ensure that the operational integrity of these components is maintained within stated operational tolerances and to avoid any environmental damage 
Monitor pumping installations/equipment to determine if the correct pump pressures, temperatures and flows conform to their required application 
Monitor and regularly check pumping systems/ equipment performance and all components to identify any signs of excessive wear and diminution of performance 
Check operational valves and valve assemblies for possible leakages 
Monitor and identify variations in the operating conditions of the pumping systems/equipment through the interpretation of amperage operating data and equipment 
Periodically check and clean filter systems to remove any potential blockages or impurities entering the pumping system/equipment and causing it to cavitate or malfunction during operation 
Inspect and sample lubrication oil to check that operating levels are correct and to determine if any contamination has taken place which may affect the operational capacity of the pumping system/equipment. 
Take appropriate action resulting from checks and monitoring. 
Conduct routine inspections and checks to ensure normal or stated pump operation is maintained 
Identify equipment faults through observation of the operational equipment and periodic sampling and testing 
Take appropriate action 
Record operational data as required by procedures. 
Isolate plant 
Make safe for required work 
Check plant is ready to be returned to service 
Prepare plant for return to service. 

Forms

Assessment Cover Sheet

PMAOPS222B - Operate and monitor pumping systems and equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

PMAOPS222B - Operate and monitor pumping systems and equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: