PMBWELD310B Mapping and Delivery Guide
Design PVC plastic pressure pipelines
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | PMBWELD310B - Design PVC plastic pressure pipelines |
---|---|---|---|
Description | This competency covers the designing of relevant elements of polyvinylchloride (PVC) plastics pressure pipes and pipeline components under industrial conditions in the field.This competency is performed by operators as part of a work team. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | Application of this unitThis competency applies to operators who are involved in the design of relevant elements of polyvinylchloride (PVC) plastics pressure pipes and pipeline components to quality assurance requirements whilst maintaining personal and immediate site safety.The key features in attaining the required quality are:identifying alternative PVC materials being used in the installation as being suitable for specific applicationsdetermining the appropriate products from relevant national standards for the specific applicationassessing quality of completed installations by determining appropriate testing and commissioning procedures.End applications include pipe lines for transmitting gas and liquids. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | PrerequisitesThis unit has the prerequisite of PMBWELD308B Install PVC plastic pressure pipelines. | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Identify PVC pipe materials as being suitable for specific pressure applications. |
| |||||||
Element: Determine appropriate products from national standards. |
| |||||||
Element: Assess quality of completed installation by determining appropriate testing and commissioning procedures. |
|