Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
PMC553042C Mapping and Delivery Guide
Set up and optimise secondary process
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | PMC553042C - Set up and optimise secondary process |
---|---|---|---|
Description | This unit of competency covers the setup, monitoring and tuning of equipment or process to optimise performance, including the rectification of non-routine equipment and quality problems. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | This unit of competency applies to experienced operators, leading hands or supervisors who are responsible for setting up and adjusting glass secondary processes from the requirements as set out in production schedules and specifications. The operator is able to run trials and adjust all of the equipment settings to have the production equipment perform satisfactorily.This unit does NOT apply to the set up and optimisation of primary glass furnace processes, which is covered by PMC553040C Set up and optimise glass forming process.This competency is typically performed by operators working either independently or as part of a work team. At all times they would be liaising with other members of the team. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare the process for production |
| |||||||
Element: Set up fabrication process |
| |||||||
Element: Monitor, interpret data and adjust operation |
| |||||||
Element: Sample, test and record product data |
| |||||||
Element: Rectify equipment and quality problems |
| |||||||
Element: Shut down equipment |
| |||||||
Element: Control hazards |
|