Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

PPMRES250 Mapping and Delivery Guide
Distribute woodchips

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency PPMRES250 - Distribute woodchips
Description
Employability Skills
Learning Outcomes and Application This unit of competency describes the outcomes required to plan and distribute woodchips to storage facilities for the production of pulp.The unit applies to production support operators who distribute woodchips in a pulp or paper manufacturing facility.Licensing, legislative, regulatory, or certification requirements apply to this unit in some states & territories at the time of publication and may differ according to jurisdiction
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

The following resources must be made available:

access to the full range of equipment involved in distributing woodchips in a pulp or paper manufacturing facility

applicable work health and safety (WHS) and isolation work place procedures, environmental guidelines and safe working requirements, risks and hazard identification and workplace housekeeping requirements

personal protective equipment required for distributing woodchips

relevant personnel for the purposes of communicating information

sample workplace documentation, procedures and reports relevant to distributing woodchips including SOP, environmental sustainability requirements/practices, plant manufacturing operating manuals, enterprise policies and procedures, oil or chemical spills and disposal guidelines, plant isolation documentation, safe work documentation

Competency is to be assessed in the workplace or in a productive environment that accurately reflects performance in a workplace.

Assessor requirements

Assessors must:

hold the appropriate assessor competency standards as outlined in regulations; and

be able to demonstrate vocational competencies at least to the level being assessed; and

be able to demonstrate how they are continuing to develop their VET knowledge and skills as well as maintaining their industry currency and assessor competence.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan woodchip distribution
  • Check work order and equipment for woodchip distribution, in accordance with productivity requirements and workplace health and safety (WHS) requirements.
  • Estimate future storage size requirement from production and distribution schedules.
  • Plan filling or distribution patterns to enable maximum woodchip storage.
  • Identify requirements for specific sequences in filling deposit areas.
  • Plan and confirm direction and extent for distribution and contraction, with relevant personnel.
  • Estimate chip distribution requirements considering the reach and limitations of the chip slinging and chip moving equipment.
       
Element: Start up transfer equipment and chip distributor
  • Complete pre-startup checks for conveyors, chip distributor, and wheeled or tracked vehicles
  • Remove isolations.
  • Check deposit areas to ensure clearance for startup.
  • Inform other operators of impending startup.
  • Start conveyors and chip spreading processes and confirm correct transfer of woodchips.
       
Element: Distribute woodchips to storage facility
  • Prepare equipment for distribution of woodchips.
  • Inspect storage to identify hazards within the vehicle operational area.
  • Communicate notice of impending operation to relevant personnel.
  • Maneuver woodchip distribution to enable filling or distribution over required area.
  • Distribute woodchips to storage facilities.
       
Element: Plan woodchip distribution
  • Check work order and equipment for woodchip distribution, in accordance with productivity requirements and workplace health and safety (WHS) requirements.
  • Estimate future storage size requirement from production and distribution schedules.
  • Plan filling or distribution patterns to enable maximum woodchip storage.
  • Identify requirements for specific sequences in filling deposit areas.
  • Plan and confirm direction and extent for distribution and contraction, with relevant personnel.
  • Estimate chip distribution requirements considering the reach and limitations of the chip slinging and chip moving equipment.
       
Element: Start up transfer equipment and chip distributor
  • Complete pre-startup checks for conveyors, chip distributor, and wheeled or tracked vehicles
  • Remove isolations.
  • Check deposit areas to ensure clearance for startup.
  • Inform other operators of impending startup.
  • Start conveyors and chip spreading processes and confirm correct transfer of woodchips.
       
Element: Distribute woodchips to storage facility
  • Prepare equipment for distribution of woodchips.
  • Inspect storage to identify hazards within the vehicle operational area.
  • Communicate notice of impending operation to relevant personnel.
  • Maneuver woodchip distribution to enable filling or distribution over required area.
  • Distribute woodchips to storage facilities.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Plan woodchip distribution

1.1. Check work order and equipment for woodchip distribution, in accordance with productivity requirements and workplace health and safety (WHS) requirements.

1.2. Estimate future storage size requirement from production and distribution schedules.

1.3. Plan filling or distribution patterns to enable maximum woodchip storage.

1.4. Identify requirements for specific sequences in filling deposit areas.

1.5. Plan and confirm direction and extent for distribution and contraction, with relevant personnel.

1.6. Estimate chip distribution requirements considering the reach and limitations of the chip slinging and chip moving equipment.

2. Start up transfer equipment and chip distributor

2.1. Complete pre-startup checks for conveyors, chip distributor, and wheeled or tracked vehicles

2.2. Remove isolations.

2.3. Check deposit areas to ensure clearance for startup.

2.4. Inform other operators of impending startup.

2.5. Start conveyors and chip spreading processes and confirm correct transfer of woodchips.

3. Distribute woodchips to storage facility

3.1. Prepare equipment for distribution of woodchips.

3.2. Inspect storage to identify hazards within the vehicle operational area.

3.3. Communicate notice of impending operation to relevant personnel.

3.4. Maneuver woodchip distribution to enable filling or distribution over required area.

3.5. Distribute woodchips to storage facilities.

A person demonstrating competency in this unit must satisfy all of the elements, performance criteria and foundation skills of this unit, and must be able to provide evidence that they can:

distribute woodchips to storage facilities, at least twice in line with required enterprise intervals

identify wood types and grades

select and direct woodchips to appropriate area

use transfer equipment and distribute woodchips

use electronic and other control systems to control equipment and processes during woodchip distribution

operate high risk load shifting equipment, in operations, as required

communicate effectively and work safely with others, in the work area when undertaking distribution.

A person competent in this unit must be able to demonstrate knowledge of:

productivity requirements, relevant workplace health and safety (WHS) procedures, risks and hazards identification and environmental workplace procedures relevant to woodchip distribution, in a pulp or paper mill

woodchip distribution area layout and associated services including operating parameters, variation and associated adjustments within level of responsibility

woodchip pile segregation purpose and techniques

equipment fault identification and corrective action relevant to woodchip production

electronic and other control systems, operation and application to make appropriate adjustments, for woodchip distribution system.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1. Plan woodchip distribution

1.1. Check work order and equipment for woodchip distribution, in accordance with productivity requirements and workplace health and safety (WHS) requirements.

1.2. Estimate future storage size requirement from production and distribution schedules.

1.3. Plan filling or distribution patterns to enable maximum woodchip storage.

1.4. Identify requirements for specific sequences in filling deposit areas.

1.5. Plan and confirm direction and extent for distribution and contraction, with relevant personnel.

1.6. Estimate chip distribution requirements considering the reach and limitations of the chip slinging and chip moving equipment.

2. Start up transfer equipment and chip distributor

2.1. Complete pre-startup checks for conveyors, chip distributor, and wheeled or tracked vehicles

2.2. Remove isolations.

2.3. Check deposit areas to ensure clearance for startup.

2.4. Inform other operators of impending startup.

2.5. Start conveyors and chip spreading processes and confirm correct transfer of woodchips.

3. Distribute woodchips to storage facility

3.1. Prepare equipment for distribution of woodchips.

3.2. Inspect storage to identify hazards within the vehicle operational area.

3.3. Communicate notice of impending operation to relevant personnel.

3.4. Maneuver woodchip distribution to enable filling or distribution over required area.

3.5. Distribute woodchips to storage facilities.

Not Applicable

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Check work order and equipment for woodchip distribution, in accordance with productivity requirements and workplace health and safety (WHS) requirements. 
Estimate future storage size requirement from production and distribution schedules. 
Plan filling or distribution patterns to enable maximum woodchip storage. 
Identify requirements for specific sequences in filling deposit areas. 
Plan and confirm direction and extent for distribution and contraction, with relevant personnel. 
Estimate chip distribution requirements considering the reach and limitations of the chip slinging and chip moving equipment. 
Complete pre-startup checks for conveyors, chip distributor, and wheeled or tracked vehicles 
Remove isolations. 
Check deposit areas to ensure clearance for startup. 
Inform other operators of impending startup. 
Start conveyors and chip spreading processes and confirm correct transfer of woodchips. 
Prepare equipment for distribution of woodchips. 
Inspect storage to identify hazards within the vehicle operational area. 
Communicate notice of impending operation to relevant personnel. 
Maneuver woodchip distribution to enable filling or distribution over required area. 
Distribute woodchips to storage facilities. 
Check work order and equipment for woodchip distribution, in accordance with productivity requirements and workplace health and safety (WHS) requirements. 
Estimate future storage size requirement from production and distribution schedules. 
Plan filling or distribution patterns to enable maximum woodchip storage. 
Identify requirements for specific sequences in filling deposit areas. 
Plan and confirm direction and extent for distribution and contraction, with relevant personnel. 
Estimate chip distribution requirements considering the reach and limitations of the chip slinging and chip moving equipment. 
Complete pre-startup checks for conveyors, chip distributor, and wheeled or tracked vehicles 
Remove isolations. 
Check deposit areas to ensure clearance for startup. 
Inform other operators of impending startup. 
Start conveyors and chip spreading processes and confirm correct transfer of woodchips. 
Prepare equipment for distribution of woodchips. 
Inspect storage to identify hazards within the vehicle operational area. 
Communicate notice of impending operation to relevant personnel. 
Maneuver woodchip distribution to enable filling or distribution over required area. 
Distribute woodchips to storage facilities. 

Forms

Assessment Cover Sheet

PPMRES250 - Distribute woodchips
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

PPMRES250 - Distribute woodchips

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: