PSPLND002 Mapping and Delivery Guide
Compile and check survey plans

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency PSPLND002 - Compile and check survey plans
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills required to prepare a compiled survey plan to industry standards. This includes checking the plan to ensure compliance with organisational requirements and industry standards.This unit applies to those working as land surveyors.The skills and knowledge described in this unit must be applied within the legislative, regulatory and policy environment in which they are carried out. Organisational policies and procedures must be consulted and adhered to.Those undertaking this unit would work independently, while performing routine tasks in a familiar context.No licensing, legislative or certification requirements apply to unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

This unit contains no specific industry-mandated assessment conditions. Guidance on suggested and recommended conditions and methods can be found in the Implementation Guide.

Assessors must satisfy the NVR/AQTF mandatory competency requirements for assessors.

Prerequisites/co-requisites
Competency Field Public land administration
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Check a survey plan
  • Check survey plans to ensure compliance with specialised requirements and industry standards.
  • Refer any discrepancies or abnormalities to the appropriate personnel for verification or amendment.
  • Endorse approval.
       
Element: Compile a survey plan
  • Access and gather information and resources required.
  • Check the compiled plan to ensure it is mathematically correct.
  • Ensure the plan is endorsed by the appropriate personnel.
       
Element: Check a survey plan
  • Check survey plans to ensure compliance with specialised requirements and industry standards.
  • Refer any discrepancies or abnormalities to the appropriate personnel for verification or amendment.
  • Endorse approval.
       
Element: Compile a survey plan
  • Access and gather information and resources required.
  • Check the compiled plan to ensure it is mathematically correct.
  • Ensure the plan is endorsed by the appropriate personnel.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Check a survey plan

1.1 Check survey plans to ensure compliance with specialised requirements and industry standards.

1.2 Refer any discrepancies or abnormalities to the appropriate personnel for verification or amendment.

1.3 Endorse approval.

2. Compile a survey plan

2.1 Access and gather information and resources required.

2.2 Check the compiled plan to ensure it is mathematically correct.

2.3 Ensure the plan is endorsed by the appropriate personnel.

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.

compiling and preparing survey plans

interpreting survey plans

checking survey plans

calculating a survey close

converting imperial dimensions to metric

creating an easement or covenant

Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.

land titles office guidelines for plan preparation and lodgement

distance calculations and geometry

past and current survey techniques and practices

easement or covenant creation

public sector legislation, including work health and safety, environment, privacy and diversity in the context of compiling and checking survey plans


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section.

1. Check a survey plan

1.1 Check survey plans to ensure compliance with specialised requirements and industry standards.

1.2 Refer any discrepancies or abnormalities to the appropriate personnel for verification or amendment.

1.3 Endorse approval.

2. Compile a survey plan

2.1 Access and gather information and resources required.

2.2 Check the compiled plan to ensure it is mathematically correct.

2.3 Ensure the plan is endorsed by the appropriate personnel.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Check survey plans to ensure compliance with specialised requirements and industry standards. 
Refer any discrepancies or abnormalities to the appropriate personnel for verification or amendment. 
Endorse approval. 
Access and gather information and resources required. 
Check the compiled plan to ensure it is mathematically correct. 
Ensure the plan is endorsed by the appropriate personnel. 
Check survey plans to ensure compliance with specialised requirements and industry standards. 
Refer any discrepancies or abnormalities to the appropriate personnel for verification or amendment. 
Endorse approval. 
Access and gather information and resources required. 
Check the compiled plan to ensure it is mathematically correct. 
Ensure the plan is endorsed by the appropriate personnel. 

Forms

Assessment Cover Sheet

PSPLND002 - Compile and check survey plans
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

PSPLND002 - Compile and check survey plans

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: