RIIBHD304D Mapping and Delivery Guide
Set up and prepare for open-cut drilling operations

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency RIIBHD304D - Set up and prepare for open-cut drilling operations
Description
Employability Skills
Learning Outcomes and Application This unit describes a participant’s skills and knowledge required to set up and prepare for open-cut drilling operations in the Coal and Metalliferous mining and Extractive.This unit is appropriate for those working in operational roles of open-cut drilling. No licensing or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit is best assessed in the context of this sector’s work environment;

where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of this sector’s workplace performance, including environment, task skills, task management skills, contingency management skills and job role environment skills; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare drilling site
  • Access, interpret and apply open cut drilling documentation and ensure the work activity is compliant
  • Receive, interpret and clarify shift changeover details
  • Identify, manage and report potential hazards and risks according to work plan
  • Select and wears personal protective equipment
  • Conduct equipment pre-start checks to ensure equipment is ready for operation
  • Assess site conditions and historical information of past performance to determine and clarify drilling requirements
  • Locate and connect ancillary services
  • Stabilise drill to minimise delays and breakdowns and ensure safety of operating personnel and continuous drilling
  • Communicate with other personnel using approved communication methods
  • Adhere to emergency procedures to ensure safety of personnel, plant and equipment
       
Element: Mark out drill pattern
  • Erect physical barricades and signage to protect pattern from unauthorised personnel and equipment
  • Adjust drill pattern within authorised tolerances and drill pattern
  • Obtain authorisation for changes to drill pattern plan from relevant authority
  • Place indicators on drill pattern in preparation for hole drilling
  • Mark out drill pattern ensuring it is visible and aids the drilling process
  • Protect pre-existing drill holes according to characteristics of hole
  • Complete all written documentation clearly, concisely and on time
       
Element: Move equipment and materials to pattern
  • Prepare rig for moving
  • Determine route and destination prior to movement of equipment and materials
  • Identify and manage potential hazards to ensure safe transportation to drill site
  • Move equipment and attachments safely and avoid damage to equipment and site or injury to personnel
  • Align drill rig in appropriate position to access drill pattern efficiently
  • Connect ancillary services
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1 Prepare drilling site

1.1 Access, interpret and apply open cut drilling documentation and ensure the work activity is compliant

1.2 Receive, interpret and clarify shift changeover details

1.3 Identify, manage and report potential hazards and risks according to work plan

1.4 Select and wears personal protective equipment

1.5 Conduct equipment pre-start checks to ensure equipment is ready for operation

1.6 Assess site conditions and historical information of past performance to determine and clarify drilling requirements

1.7 Locate and connect ancillary services

1.8 Stabilise drill to minimise delays and breakdowns and ensure safety of operating personnel and continuous drilling

1.9 Communicate with other personnel using approved communication methods

1.10 Adhere to emergency procedures to ensure safety of personnel, plant and equipment

2 Mark out drill pattern

2.1 Erect physical barricades and signage to protect pattern from unauthorised personnel and equipment

2.2 Adjust drill pattern within authorised tolerances and drill pattern

2.3 Obtain authorisation for changes to drill pattern plan from relevant authority

2.4 Place indicators on drill pattern in preparation for hole drilling

2.5 Mark out drill pattern ensuring it is visible and aids the drilling process

2.6 Protect pre-existing drill holes according to characteristics of hole

2.7 Complete all written documentation clearly, concisely and on time

3 Move equipment and materials to pattern

3.1 Prepare rig for moving

3.2 Determine route and destination prior to movement of equipment and materials

3.3 Identify and manage potential hazards to ensure safe transportation to drill site

3.4 Move equipment and attachments safely and avoid damage to equipment and site or injury to personnel

3.5 Align drill rig in appropriate position to access drill pattern efficiently

3.6 Connect ancillary services

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

works effectively with others to set-up and prepare for open cut drilling operations that meet all of the required outcomes including:

uses a range of communication techniques and strategies to communicate and coordinate information and activity to others

demonstrates completion of setting up and preparing for open cut drilling operations that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

preparing the drilling site; marks out drill pattern

adjusting, marking out, and changing the drill pattern

carrying out risk assessment, identify hazard, establishes controls and reports

correctly interpret plans, reports, maps, specifications demonstrates correct driving and direct drilling techniques

preparing drill rig for moving,

moving all drill rig equipment and attachments

realign and position drill rig

The candidate must demonstrate knowledge of setting up and preparing for open-cut drilling operations through:

relevant legislative, organisation and site requirements and procedures

equipment processes, technical capability and limitations

equipment safety requirements

interpretation of geological and technical data

the mine operational system


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1 Prepare drilling site

1.1 Access, interpret and apply open cut drilling documentation and ensure the work activity is compliant

1.2 Receive, interpret and clarify shift changeover details

1.3 Identify, manage and report potential hazards and risks according to work plan

1.4 Select and wears personal protective equipment

1.5 Conduct equipment pre-start checks to ensure equipment is ready for operation

1.6 Assess site conditions and historical information of past performance to determine and clarify drilling requirements

1.7 Locate and connect ancillary services

1.8 Stabilise drill to minimise delays and breakdowns and ensure safety of operating personnel and continuous drilling

1.9 Communicate with other personnel using approved communication methods

1.10 Adhere to emergency procedures to ensure safety of personnel, plant and equipment

2 Mark out drill pattern

2.1 Erect physical barricades and signage to protect pattern from unauthorised personnel and equipment

2.2 Adjust drill pattern within authorised tolerances and drill pattern

2.3 Obtain authorisation for changes to drill pattern plan from relevant authority

2.4 Place indicators on drill pattern in preparation for hole drilling

2.5 Mark out drill pattern ensuring it is visible and aids the drilling process

2.6 Protect pre-existing drill holes according to characteristics of hole

2.7 Complete all written documentation clearly, concisely and on time

3 Move equipment and materials to pattern

3.1 Prepare rig for moving

3.2 Determine route and destination prior to movement of equipment and materials

3.3 Identify and manage potential hazards to ensure safe transportation to drill site

3.4 Move equipment and attachments safely and avoid damage to equipment and site or injury to personnel

3.5 Align drill rig in appropriate position to access drill pattern efficiently

3.6 Connect ancillary services

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply open cut drilling documentation and ensure the work activity is compliant 
Receive, interpret and clarify shift changeover details 
Identify, manage and report potential hazards and risks according to work plan 
Select and wears personal protective equipment 
Conduct equipment pre-start checks to ensure equipment is ready for operation 
Assess site conditions and historical information of past performance to determine and clarify drilling requirements 
Locate and connect ancillary services 
Stabilise drill to minimise delays and breakdowns and ensure safety of operating personnel and continuous drilling 
Communicate with other personnel using approved communication methods 
Adhere to emergency procedures to ensure safety of personnel, plant and equipment 
Erect physical barricades and signage to protect pattern from unauthorised personnel and equipment 
Adjust drill pattern within authorised tolerances and drill pattern 
Obtain authorisation for changes to drill pattern plan from relevant authority 
Place indicators on drill pattern in preparation for hole drilling 
Mark out drill pattern ensuring it is visible and aids the drilling process 
Protect pre-existing drill holes according to characteristics of hole 
Complete all written documentation clearly, concisely and on time 
Prepare rig for moving 
Determine route and destination prior to movement of equipment and materials 
Identify and manage potential hazards to ensure safe transportation to drill site 
Move equipment and attachments safely and avoid damage to equipment and site or injury to personnel 
Align drill rig in appropriate position to access drill pattern efficiently 
Connect ancillary services 

Forms

Assessment Cover Sheet

RIIBHD304D - Set up and prepare for open-cut drilling operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIBHD304D - Set up and prepare for open-cut drilling operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: