RIICFW307A Mapping and Delivery Guide
Direct cast in-situ piling operations
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | RIICFW307A - Direct cast in-situ piling operations |
---|---|---|---|
Description | This unit covers directing of cast in-situ piling operations in the civil construction industry. It includes planning and preparing for the operations; directing the rig, locating and preparing pile positions; placing concrete; and carrying out post-operational requirements. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | The boring process for casting in-situ piles may include auger bored and they may be CFA piles. This unit is appropriate for those working in supporting roles in piling, at worksites within:Civil construction | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Not applicable. Not applicable. | ||
Competency Field | Refer to Unit Sector(s). |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare for assisting with operations |
| |||||||
Element: Directing the rig, locating and preparing pile positions |
| |||||||
Element: Assist with placing concrete |
| |||||||
Element: Carryout post-operational requirements |
|