Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIICRC203A Mapping and Delivery Guide
Install sub-soil drainage

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency RIICRC203A - Install sub-soil drainage
Description This unit covers the installation of sub-soil drainage in the civil construction industry. It includes planning and preparing, setting out and excavating trenches, installing bedding materials, installing sub-soil drainage, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit is appropriate for those working in an operational role at worksites within:Civil construction
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not applicable. Not applicable.
Competency Field Refer to Unit Sector(s).
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare
  • Access, interpret and apply compliance documentation relevant to the work activity
  • Identify and apply relevant drawings and job specifications to all work activities
  • Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
  • Identify, obtain and implement signage requirements from the project traffic management plan
  • Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
  • Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
       
Element: Set out and excavate trenches
  • Check trench depths and grades to ensure conformity with plans and specifications
  • Set out and clearly mark trench location
  • Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering
       
Element: Install bedding materials
  • Determine bedding material type and depth from plans and specifications
  • Lay bedding materials to specified depths and grades
       
Element: Install sub-soil drainage
  • Place geo-textile according to specifications
  • Prepare drain sections and fittings
  • Lay subsoil drain
  • Provide inspection opening and flush out points according to plans
  • Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems
  • Install packing and prepare system for backfilling
  • Monitor backfill procedure to ensure work completed to specification
       
Element: Clean up
  • Clear work area and recycle or dispose of materials in accordance with project environmental management plan
  • Clean, check, maintain and store plant, tools and equipment
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for sub-soil drainage installations

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of sub-soil drainage installation

working with others to undertake and complete the installation of sub-soil drainage in a way that meets all of the required outcomes

consistent timely completion of sub-soil drainage installation that safely, effectively and efficiently meets the required outcomes

installation of a minimum of 100 metres of sub-soil drain in two separate locations, including end structures or outlets to design specifications

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistent achievement of required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete the installation of sub-soil drainage

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to install sub-soil drainage:

apply legislative, organisation and site requirements and procedures for installing sub-soil drainage

organise work activities

select and use relevant tools and equipment safely

identify and report on hazards related to the worksite and work activity

communicate effectively to receive and clarify work instructions

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to install sub-soil drainage:

site and equipment safety requirements

sub-soil drainage systems and installation procedures

concrete and concreting

equipment types, characteristics, technical capabilities and limitations

site isolation and traffic control responsibilities and authorities

materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

JSAs/safe work method statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Safety requirements may include:

OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances

safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public

safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distances are kept from excavations, and areas secured from unauthorised access or movement

recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials

emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational First Aid requirements and evacuation

Tools and equipment may include:

levelling equipment

tape measures

shovels

hand saws

cutting knives

crow bars

hammers

trowels

formwork

Environmental requirements may include:

organisational/project environmental management plan

waste management

water quality protection

noise

vibration

dust

clean-up management

Bedding materials may include:

aggregate

sand

Subsoil drainage systems may include:

strip filter drains and perforated pipes with or without geo-textile fabric

granular materials enclosed in geo-textile fabric

Materials may include:

marking materials

strip filter drains

perforated pipes

geo-textile fabric

pipe jointing materials

backfill and bedding materials

marker post

concrete

stones

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation relevant to the work activity 
Identify and apply relevant drawings and job specifications to all work activities 
Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task 
Identify, obtain and implement signage requirements from the project traffic management plan 
Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults 
Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task 
Check trench depths and grades to ensure conformity with plans and specifications 
Set out and clearly mark trench location 
Communicate with plant operator to ensure correct excavation of trenches, placement of shoring and battering 
Determine bedding material type and depth from plans and specifications 
Lay bedding materials to specified depths and grades 
Place geo-textile according to specifications 
Prepare drain sections and fittings 
Lay subsoil drain 
Provide inspection opening and flush out points according to plans 
Fit out and/or connect end structures/outlets/clean outs to culverts, storm water or subsoil drain systems 
Install packing and prepare system for backfilling 
Monitor backfill procedure to ensure work completed to specification 
Clear work area and recycle or dispose of materials in accordance with project environmental management plan 
Clean, check, maintain and store plant, tools and equipment 

Forms

Assessment Cover Sheet

RIICRC203A - Install sub-soil drainage
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICRC203A - Install sub-soil drainage

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: