Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIICRC322D Mapping and Delivery Guide
Receive, check and record concrete deliveries

Version 1.0
Issue Date: March 2024


Qualification -
Unit of Competency RIICRC322D - Receive, check and record concrete deliveries
Description
Employability Skills
Learning Outcomes and Application This unit describes a participant’s skills and knowledge required to receive, check and record concrete deliveries in Civil Construction.This unit is appropriate for those working in operational roles. No licensing, legislation or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare to receive, check and record concrete deliveries
  • Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant
  • Obtain, read, interpret, clarify and confirm work requirements
  • Identify and address potential risks, hazards and environmental issues, and implement control measures
  • Select and wear correct personal protective equipment appropriate for work activities
  • Identify, obtain, confirm and implement signage requirements
  • Select and check for faults to plant, tools and equipment, to carry out tasks
       
Element: Receive concrete
  • Identify survey datum points required to accurately locate material placement
  • Check delivery documents for accuracy against ordered material
  • Check delivery docket for compliance with test results
  • Check for compliance of delivery docket with batching times
  • Direct required action for non-compliant loads
  • Direct concrete delivery vehicle to location for discharge
  • Monitor movements and hazards and identify and communicate changes to the work environment during the work process
       
Element: Tip/discharge concrete
  • Maintain safe working area around pour location
  • Establish actual pour location of discharged load
  • Discharge concrete from delivery vehicle directly or via chute or material handling equipment
  • Discharge concrete to required placement level
  • Visually assess load for uniformity and consistency to test results recorded on delivery docket
  • Direct delivery vehicle safely away from pour location once discharge is complete
       
Element: Record information
  • Record appropriate details from the delivery docket
  • Record the time and location of the discharge of the load
  • Record additional information as required by worksite procedures
  • Compete end of day records and dockets and pass onto appropriate site personnel completed days records
       
Element: Clean up
  • Clean work area and dispose of, reuse or recycle materials
  • Clean, check, maintain and store tools and equipment
       
Element: Plan and prepare to receive, check and record concrete deliveries
  • Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant
  • Obtain, read, interpret, clarify and confirm work requirements
  • Identify and address potential risks, hazards and environmental issues, and implement control measures
  • Select and wear correct personal protective equipment appropriate for work activities
  • Identify, obtain, confirm and implement signage requirements
  • Select and check for faults to plant, tools and equipment, to carry out tasks
       
Element: Receive concrete
  • Identify survey datum points required to accurately locate material placement
  • Check delivery documents for accuracy against ordered material
  • Check delivery docket for compliance with test results
  • Check for compliance of delivery docket with batching times
  • Direct required action for non-compliant loads
  • Direct concrete delivery vehicle to location for discharge
  • Monitor movements and hazards and identify and communicate changes to the work environment during the work process
       
Element: Tip/discharge concrete
  • Maintain safe working area around pour location
  • Establish actual pour location of discharged load
  • Discharge concrete from delivery vehicle directly or via chute or material handling equipment
  • Discharge concrete to required placement level
  • Visually assess load for uniformity and consistency to test results recorded on delivery docket
  • Direct delivery vehicle safely away from pour location once discharge is complete
       
Element: Record information
  • Record appropriate details from the delivery docket
  • Record the time and location of the discharge of the load
  • Record additional information as required by worksite procedures
  • Compete end of day records and dockets and pass onto appropriate site personnel completed days records
  • Clean work area and dispose of, reuse or recycle materials
  • Clean, check, maintain and store tools and equipment
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare to receive, check and record concrete deliveries

1.1 Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults to plant, tools and equipment, to carry out tasks

2. Receive concrete

2.1 Identify survey datum points required to accurately locate material placement

2.2 Check delivery documents for accuracy against ordered material

2.3 Check delivery docket for compliance with test results

2.4 Check for compliance of delivery docket with batching times

2.5 Direct required action for non-compliant loads

2.6 Direct concrete delivery vehicle to location for discharge

2.7 Monitor movements and hazards and identify and communicate changes to the work environment during the work process

3. Tip/discharge concrete

3.1 Maintain safe working area around pour location

3.2 Establish actual pour location of discharged load

3.3 Discharge concrete from delivery vehicle directly or via chute or material handling equipment

3.4 Discharge concrete to required placement level

3.5 Visually assess load for uniformity and consistency to test results recorded on delivery docket

3.6 Direct delivery vehicle safely away from pour location once discharge is complete

4. Record information

4.1 Record appropriate details from the delivery docket

4.2 Record the time and location of the discharge of the load

4.3 Record additional information as required by worksite procedures

4.4 Compete end of day records and dockets and pass onto appropriate site personnel completed days records

5. Clean up

5.1 Clean work area and dispose of, reuse or recycle materials

5.2 Clean, check, maintain and store tools and equipment

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies applicable documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient concrete deliveries including:

accessing, interpreting and applying documentation for Receive, check and record concrete deliveries

identifying and applying relevant specifications to all work activities

identifying, addressing and reporting potential hazards and risks

selecting and checking for faults all plant, tools and equipment to carry out tasks

identifying, addressing and reporting environmental issues

works effectively with others to check concrete deliveries meet all of the required outcomes including:

preparing for and organising work activities to meet all task requirements

communicating clearly and concisely with others to receive and clarify work instructions

using a range of communication techniques and aids to advise others of work activity and exclusion zones

monitoring movements and hazards and identifying and communicating changes to the work environment during the work process

demonstrates completion of receiving, checking and recording concrete deliveries that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

receiving concrete according to site procedures

tipping/discharging concrete safely and in the correct location

recording all required information

cleaning the work area

cleaning, checking, maintaining and storing tools and equipment in line with relevant site procedures

carrying out all receive, check and record concrete deliveries activities to site procedures and standards

The candidate must demonstrate knowledge in receiving, checking and recording concrete deliveries through:

accessing, interpreting and applying organisation and site requirements and procedures for concrete deliveries for:

identifying and managing risks

identifying, addressing and reporting environmental issues

setting up work activity

site isolation, signage and erecting barriers

work health and safety

selecting and checking for faults, all tools and equipment to carry out tasks

carrying out work to specifications

applying effective techniques to receiving, checking and recording concrete deliveries


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare to receive, check and record concrete deliveries

1.1 Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults to plant, tools and equipment, to carry out tasks

2. Receive concrete

2.1 Identify survey datum points required to accurately locate material placement

2.2 Check delivery documents for accuracy against ordered material

2.3 Check delivery docket for compliance with test results

2.4 Check for compliance of delivery docket with batching times

2.5 Direct required action for non-compliant loads

2.6 Direct concrete delivery vehicle to location for discharge

2.7 Monitor movements and hazards and identify and communicate changes to the work environment during the work process

3. Tip/discharge concrete

3.1 Maintain safe working area around pour location

3.2 Establish actual pour location of discharged load

3.3 Discharge concrete from delivery vehicle directly or via chute or material handling equipment

3.4 Discharge concrete to required placement level

3.5 Visually assess load for uniformity and consistency to test results recorded on delivery docket

3.6 Direct delivery vehicle safely away from pour location once discharge is complete

4. Record information

4.1 Record appropriate details from the delivery docket

4.2 Record the time and location of the discharge of the load

4.3 Record additional information as required by worksite procedures

4.4 Compete end of day records and dockets and pass onto appropriate site personnel completed days records

5. Clean up

5.1 Clean work area and dispose of, reuse or recycle materials

5.2 Clean, check, maintain and store tools and equipment

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear correct personal protective equipment appropriate for work activities 
Identify, obtain, confirm and implement signage requirements 
Select and check for faults to plant, tools and equipment, to carry out tasks 
Identify survey datum points required to accurately locate material placement 
Check delivery documents for accuracy against ordered material 
Check delivery docket for compliance with test results 
Check for compliance of delivery docket with batching times 
Direct required action for non-compliant loads 
Direct concrete delivery vehicle to location for discharge 
Monitor movements and hazards and identify and communicate changes to the work environment during the work process 
Maintain safe working area around pour location 
Establish actual pour location of discharged load 
Discharge concrete from delivery vehicle directly or via chute or material handling equipment 
Discharge concrete to required placement level 
Visually assess load for uniformity and consistency to test results recorded on delivery docket 
Direct delivery vehicle safely away from pour location once discharge is complete 
Record appropriate details from the delivery docket 
Record the time and location of the discharge of the load 
Record additional information as required by worksite procedures 
Compete end of day records and dockets and pass onto appropriate site personnel completed days records 
Clean work area and dispose of, reuse or recycle materials 
Clean, check, maintain and store tools and equipment 
Access, interpret and apply documentation for receiving, checking and recording concrete deliveries and ensure the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Select and wear correct personal protective equipment appropriate for work activities 
Identify, obtain, confirm and implement signage requirements 
Select and check for faults to plant, tools and equipment, to carry out tasks 
Identify survey datum points required to accurately locate material placement 
Check delivery documents for accuracy against ordered material 
Check delivery docket for compliance with test results 
Check for compliance of delivery docket with batching times 
Direct required action for non-compliant loads 
Direct concrete delivery vehicle to location for discharge 
Monitor movements and hazards and identify and communicate changes to the work environment during the work process 
Maintain safe working area around pour location 
Establish actual pour location of discharged load 
Discharge concrete from delivery vehicle directly or via chute or material handling equipment 
Discharge concrete to required placement level 
Visually assess load for uniformity and consistency to test results recorded on delivery docket 
Direct delivery vehicle safely away from pour location once discharge is complete 
Record appropriate details from the delivery docket 
Record the time and location of the discharge of the load 
Record additional information as required by worksite procedures 
Compete end of day records and dockets and pass onto appropriate site personnel completed days records 
Clean work area and dispose of, reuse or recycle materials 
Clean, check, maintain and store tools and equipment 

Forms

Assessment Cover Sheet

RIICRC322D - Receive, check and record concrete deliveries
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICRC322D - Receive, check and record concrete deliveries

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: