Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIICTT306A Mapping and Delivery Guide
Install cure in-place linings for existing pipeline systems

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency RIICTT306A - Install cure in-place linings for existing pipeline systems
Description This unit covers the installing cure in-place linings for existing pipeline systems in civil construction. It includes the planning and preparing for operations, surveying the site, completing the cure in-place lining and cleaning up when undertaking the rehabilitation of existing services pipeline system.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application This unit includes thermal cure, UV cure and ambient cure liners for repairing or renovating non-man-entry pits, including gas, sewer and water. Cure in-place linings may include but not be limited to a resin impregnated sock inserted in the pipe and subsequently forced against the wall using water or air. Curing occurs by heat or ultra violet light. Cure in-place linings may be used for pipes between 50 mm and 750 mm and may also be used for pipes which are not roundThis unit is appropriate for those working in operational roles, at worksites within:Civil Construction
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not applicable. Not applicable.
Competency Field Refer to Unit Sector(s).
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare
  • Access, interpret and apply compliance documentation relevant to installing cure in-place linings for existing pipeline systems
  • Obtain, confirm and apply work instructions, including plans, specifications, quality requirements and operational details to the allotted task
  • Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
  • Identify, obtain and implement signage requirements from the project traffic management plan
  • Ensure plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, check for serviceability and rectify or report any faults
  • Identify and confirm environmental protection requirements from the project environmental management plan, and apply to the allotted task
       
Element: Perform site survey
  • Notify and obtain approval of property owners and occupiers for entry onto their property
  • Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities
  • Located Underground utilities
  • Maintain system serviceability during rehabilitation works in accordance with asset owners' policies, allowable duration of service interruption, and project specifications
  • Survey and record existing site conditions
       
Element: Initiate rehabilitation work
  • Prepare entry and exit pits where specified in accordance with site and OHS requirements
  • Follow confined space entry procedures
  • Monitor installation process and finished product to ensure conformity to the design requirements in accordance with manufacturer's specifications and project specifications
       
Element: Complete cure in-place lining Complete cure in-place lining
  • Determine fault with the aid of plans, drawings, CCTV recordings or other mechanisms
  • Select resin impregnated liners appropriate to the fault
  • Apply pressure cleaning to the designated location
  • Install cure in-place lining material to comply with design requirements and manufacturer's specifications
  • Conduct curing process to comply with manufacturer's specifications
  • Correctly secure and seal termination at ends of process in accordance with manufacturer's specifications
  • Open junctions for inspection and operation
  • Monitor installation process and finished product to ensure conformity to the design requirements in accordance
       
Element: Clean up
  • Clear work area and dispose of or recycle materials in accordance with project environmental management plan
  • Clean, check, maintain and store plant, tools and equipment
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for installing cure in-place linings for existing pipeline systems

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of at least two different cure in-place linings for existing pipeline systems

working with others to undertake and complete the installation of cure in-place linings for existing pipeline systems that meets all of the required outcomes

consistent timely completion of the installing of cure in-place linings for existing pipeline systems that safely, effectively and efficiently meets the required outcomes

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistently achieving the required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete the installation of cure in-place linings for existing pipeline systems

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to install cure in-place linings for existing pipeline systems:

apply legislative, organisation and site requirements and procedures

apply site and equipment safety requirements

apply laser control equipment

apply manual handling

apply confined space entry

use remote unit

interpret engineering drawings, plans and specifications

apply equipment types, characteristics, technical capabilities and limitations

apply operational, maintenance and basic diagnostic procedures

apply site isolation and traffic control responsibilities

apply materials safety data sheets and materials handling methods

apply project quality requirements

identify pipeline systems

apply JSA's/safe work method statement

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to install cure in-place linings for existing pipeline systems:

site and equipment safety requirements

laser control equipment

manual handling

confined space entry

use of remote unit

processes for interpreting engineering drawings

equipment types, characteristics, technical capabilities and limitations

operational, maintenance and basic diagnostic procedures

site isolation and traffic control responsibilities and authorities

materials safety data sheets and materials handling methods

project quality requirements

civil construction terminology

cure in-place linings requirements and procedures

pipeline systems

JSA's/safe work method statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation

may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Signage may include:

site safety signage

temporary signage for the benefit of motorists and pedestrians

barricades

traffic conditions signage

Tools and equipment may include:

pumps

compressors

hoses

tape measures

marking equipment

crow bars

spanners

adjustable

wrenches

shovels

picks

hammers (sledge/hand)

string lines

spirit levels

dumpy levels

theodolites

brooms

hacksaws

hand saws

electronic tracking devices

slings and cranes

Environmental protection requirements may include:

organisational/project environmental management plan

waste management

water quality protection

noise

vibration

dust

clean-up management

Monitoring of boring may include:

sounder

beacon

hand wired guidance system

magnetometry

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation relevant to installing cure in-place linings for existing pipeline systems 
Obtain, confirm and apply work instructions, including plans, specifications, quality requirements and operational details to the allotted task 
Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task 
Identify, obtain and implement signage requirements from the project traffic management plan 
Ensure plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, check for serviceability and rectify or report any faults 
Identify and confirm environmental protection requirements from the project environmental management plan, and apply to the allotted task 
Notify and obtain approval of property owners and occupiers for entry onto their property 
Determine site conditions by visual inspection, plans, discussion with land owners and information from service utilities 
Located Underground utilities 
Maintain system serviceability during rehabilitation works in accordance with asset owners' policies, allowable duration of service interruption, and project specifications 
Survey and record existing site conditions 
Prepare entry and exit pits where specified in accordance with site and OHS requirements 
Follow confined space entry procedures 
Monitor installation process and finished product to ensure conformity to the design requirements in accordance with manufacturer's specifications and project specifications 
Determine fault with the aid of plans, drawings, CCTV recordings or other mechanisms 
Select resin impregnated liners appropriate to the fault 
Apply pressure cleaning to the designated location 
Install cure in-place lining material to comply with design requirements and manufacturer's specifications 
Conduct curing process to comply with manufacturer's specifications 
Correctly secure and seal termination at ends of process in accordance with manufacturer's specifications 
Open junctions for inspection and operation 
Monitor installation process and finished product to ensure conformity to the design requirements in accordance 
Clear work area and dispose of or recycle materials in accordance with project environmental management plan 
Clean, check, maintain and store plant, tools and equipment 

Forms

Assessment Cover Sheet

RIICTT306A - Install cure in-place linings for existing pipeline systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIICTT306A - Install cure in-place linings for existing pipeline systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: