Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIIHAN308F Mapping and Delivery Guide
Load and unload plant

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIIHAN308F - Load and unload plant
Description
Employability Skills
Learning Outcomes and Application This unit describes the skills and knowledge required to load and unload plant.This unit applies to those working in site-based roles.Prior to performing this activity, skills and knowledge should be developed for the individual plant. This can be achieved through completing the equivalent operator unit or being assisted by someone who has this knowledge. Refer to the Implementation Guide for further details. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors, and must be sourced from state jurisdictions prior to applying this unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to load and unload plant
  • Access, interpret and apply load handling documentation to ensure work activity is compliant
  • Obtain, interpret, clarify and confirm work requirements
  • Identify hazards and environmental issues, assess the risks and implement control measures in line with workplace policies
  • Select and wear personal protective equipment required for work activities
  • Obtain and display signage, and erect barriers to isolate the loading and unloading site from general traffic flow in line with safe work practices
       
Element: Load the plant in line with established requirements
  • Confirm the dimensions and capacity of the float or trailer to safely carry the plant
  • Select tools and loading equipment in line with work requirements
  • Identify faults, and rectify or report prior to commencement of work, within scope of own responsibility and according to workplace procedures
  • Confirm preparation procedures of the plant for transportation has been completed
  • Place and secure loading aids in line with workplace procedures
  • Confirm the loading procedure with operator and/or guide before loading commences
  • Move the plant item onto the trailer or float and halt at the designated position as per workplace procedures
  • Secure plant to trailer or float in line with workplace procedures
       
Element: Unload the plant in line with established requirements
  • Confirm the unloading procedure with operator and guide before unloading commences
  • Place and secure unloading aids, including ramps, in accordance with the trailer or float specifications
  • Slacken securing devices and remove according to workplace procedures
  • Move the plant item off the trailer or float and halt at the designated position
  • Stow loading aids including ramps, bridging materials and securing devices as per workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply load handling documentation to ensure work activity is compliant 
Obtain, interpret, clarify and confirm work requirements 
Identify hazards and environmental issues, assess the risks and implement control measures in line with workplace policies 
Select and wear personal protective equipment required for work activities 
Obtain and display signage, and erect barriers to isolate the loading and unloading site from general traffic flow in line with safe work practices 
Confirm the dimensions and capacity of the float or trailer to safely carry the plant 
Select tools and loading equipment in line with work requirements 
Identify faults, and rectify or report prior to commencement of work, within scope of own responsibility and according to workplace procedures 
Confirm preparation procedures of the plant for transportation has been completed 
Place and secure loading aids in line with workplace procedures 
Confirm the loading procedure with operator and/or guide before loading commences 
Move the plant item onto the trailer or float and halt at the designated position as per workplace procedures 
Secure plant to trailer or float in line with workplace procedures 
Confirm the unloading procedure with operator and guide before unloading commences 
Place and secure unloading aids, including ramps, in accordance with the trailer or float specifications 
Slacken securing devices and remove according to workplace procedures 
Move the plant item off the trailer or float and halt at the designated position 
Stow loading aids including ramps, bridging materials and securing devices as per workplace procedures 

Forms

Assessment Cover Sheet

RIIHAN308F - Load and unload plant
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIHAN308F - Load and unload plant

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: