Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIIHAN311D Mapping and Delivery Guide
Conduct operations with integrated tool carrier

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIIHAN311D - Conduct operations with integrated tool carrier
Description
Employability Skills
Learning Outcomes and Application This unit describes a participant’s skills and knowledge required to conduct operations with integrated tool carrier in Coal and Metalliferous mining.This unit is appropriate for those working in operational roles. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for integrated tool carrier operations
  • Access, interpret and apply integrated tool carrier documentation and ensure the work activity is compliant
  • Obtain, read, interpret, clarify and confirm work requirements
  • Select and wear personal protective equipment appropriate for work activities
  • Identify and select any required tools and equipment, check for serviceability and rectify or report, verbally or in writing, any faults prior to commencement
  • Identify and address potential risks, hazards and environmental issues, and implement control measures
  • Perform equipment pre-start and post-start checks
  • Carry out start-up procedures
  • Communicate with other equipment operators and personnel using approved communication methods
  • Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
       
Element: Lift and move load
  • Operate equipment safely within limitations
  • Monitor and manage equipment performance using appropriate indicators/gauges
  • Assess site conditions, position equipment and ensure safety of other equipment and personnel
  • Communicate with Dogman to ensure appropriate slings and lifting gear are selected
  • Communicate with Dogman to ensure load and equipment is secured and stable
  • Ensure approved signals are used to receive guidance on movement of equipment
  • Complete all written documentation clearly, concisely and on time
       
Element: Complete operations
  • Prepare integrated tool carrier for relocation
  • Move integrated tool carrier between worksites
  • Park integrated tool carrier and prepare for maintenance and shutdown
  • Inspect equipment for faults
       
Element: Select, remove and fit attachments
  • Select attachment for the work activity
  • Remove, fit and test attachment
  • Use attachment for intended purpose
  • Remove, clean and store attachment
       
Element: Carry out post-operational procedures
  • Inspect, fault find and report faults, verbally or in writing
  • Carry out routine operator servicing, maintenance and housekeeping tasks
  • Maintain and process written records and reports
  • Carry out minor operator maintenance to manufacturer's instructions and site requirements
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare for integrated tool carrier operations

1.1 Access, interpret and apply integrated tool carrier documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Select and wear personal protective equipment appropriate for work activities

1.4 Identify and select any required tools and equipment, check for serviceability and rectify or report, verbally or in writing, any faults prior to commencement

1.5 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.6 Perform equipment pre-start and post-start checks

1.7 Carry out start-up procedures

1.8 Communicate with other equipment operators and personnel using approved communication methods

1.9 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Lift and move load

2.1 Operate equipment safely within limitations

2.2 Monitor and manage equipment performance using appropriate indicators/gauges

2.3 Assess site conditions, position equipment and ensure safety of other equipment and personnel

2.4 Communicate with Dogman to ensure appropriate slings and lifting gear are selected

2.5 Communicate with Dogman to ensure load and equipment is secured and stable

2.6 Ensure approved signals are used to receive guidance on movement of equipment

2.7 Complete all written documentation clearly, concisely and on time

3. Complete operations

3.1 Prepare integrated tool carrier for relocation

3.2 Move integrated tool carrier between worksites

3.3 Park integrated tool carrier and prepare for maintenance and shutdown

3.4 Inspect equipment for faults

4. Select, remove and fit attachments

4.1 Select attachment for the work activity

4.2 Remove, fit and test attachment

4.3 Use attachment for intended purpose

4.4 Remove, clean and store attachment

5. Carry out post-operational procedures

5.1 Inspect, fault find and report faults, verbally or in writing

5.2 Carry out routine operator servicing, maintenance and housekeeping tasks

5.3 Maintain and process written records and reports

5.4 Carry out minor operator maintenance to manufacturer's instructions and site requirements


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare for integrated tool carrier operations

1.1 Access, interpret and apply integrated tool carrier documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Select and wear personal protective equipment appropriate for work activities

1.4 Identify and select any required tools and equipment, check for serviceability and rectify or report, verbally or in writing, any faults prior to commencement

1.5 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.6 Perform equipment pre-start and post-start checks

1.7 Carry out start-up procedures

1.8 Communicate with other equipment operators and personnel using approved communication methods

1.9 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Lift and move load

2.1 Operate equipment safely within limitations

2.2 Monitor and manage equipment performance using appropriate indicators/gauges

2.3 Assess site conditions, position equipment and ensure safety of other equipment and personnel

2.4 Communicate with Dogman to ensure appropriate slings and lifting gear are selected

2.5 Communicate with Dogman to ensure load and equipment is secured and stable

2.6 Ensure approved signals are used to receive guidance on movement of equipment

2.7 Complete all written documentation clearly, concisely and on time

3. Complete operations

3.1 Prepare integrated tool carrier for relocation

3.2 Move integrated tool carrier between worksites

3.3 Park integrated tool carrier and prepare for maintenance and shutdown

3.4 Inspect equipment for faults

4. Select, remove and fit attachments

4.1 Select attachment for the work activity

4.2 Remove, fit and test attachment

4.3 Use attachment for intended purpose

4.4 Remove, clean and store attachment

5. Carry out post-operational procedures

5.1 Inspect, fault find and report faults, verbally or in writing

5.2 Carry out routine operator servicing, maintenance and housekeeping tasks

5.3 Maintain and process written records and reports

5.4 Carry out minor operator maintenance to manufacturer's instructions and site requirements

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply integrated tool carrier documentation and ensure the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Select and wear personal protective equipment appropriate for work activities 
Identify and select any required tools and equipment, check for serviceability and rectify or report, verbally or in writing, any faults prior to commencement 
Identify and address potential risks, hazards and environmental issues, and implement control measures 
Perform equipment pre-start and post-start checks 
Carry out start-up procedures 
Communicate with other equipment operators and personnel using approved communication methods 
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency 
Operate equipment safely within limitations 
Monitor and manage equipment performance using appropriate indicators/gauges 
Assess site conditions, position equipment and ensure safety of other equipment and personnel 
Communicate with Dogman to ensure appropriate slings and lifting gear are selected 
Communicate with Dogman to ensure load and equipment is secured and stable 
Ensure approved signals are used to receive guidance on movement of equipment 
Complete all written documentation clearly, concisely and on time 
Prepare integrated tool carrier for relocation 
Move integrated tool carrier between worksites 
Park integrated tool carrier and prepare for maintenance and shutdown 
Inspect equipment for faults 
Select attachment for the work activity 
Remove, fit and test attachment 
Use attachment for intended purpose 
Remove, clean and store attachment 
Inspect, fault find and report faults, verbally or in writing 
Carry out routine operator servicing, maintenance and housekeeping tasks 
Maintain and process written records and reports 
Carry out minor operator maintenance to manufacturer's instructions and site requirements 

Forms

Assessment Cover Sheet

RIIHAN311D - Conduct operations with integrated tool carrier
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIHAN311D - Conduct operations with integrated tool carrier

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: