Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIINHB306A Mapping and Delivery Guide
Conduct large diameter auger drilling

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIINHB306A - Conduct large diameter auger drilling
Description This unit covers the conducting of large diameter auger drilling in civil construction and drilling industries. It includes planning and preparing for drilling, operating the drill, maintaining equipment, and responding to problems.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application Large flight augers include short-flight and bucket augers and are used for foundation construction drilling. This unit is appropriate for those working in a operational roles, at worksites within:Civil constructionDrilling
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not applicable. Not applicable.
Competency Field Refer to Unit Sector(s).
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for conducting of large diameter auger drilling
  • Access, interpret and apply compliance documentation relevant to the work activity
  • Obtain, confirm and apply work instructions for the allocated task
  • Identify, manage and report all potential hazards
  • Resolve coordination requirements with others at the site prior to commencing and during work activities
  • Induct site visitors as required by procedures
       
Element: Operate large diameter auger drill
  • Collar borehole, start hole, maintain hole alignment, take corrective action for deflections
  • Make up appropriate drill string
  • Handle additional drill stems, inserting them in the drill string
  • Use appropriate gears, rotation, feed and holdback so that flights or bucket are substantially full for the soil being drilled at any given depth
  • Interpret drilling factors to determine conditions at the bit
  • Make and break auger string and drive head connections safely
  • Maintain a clear hole and a clear bottom and deploy tools for cleaning hole bottom at completed depth
  • Interpret or calculate actual depth at any point during drilling, interpret depth of strata changes and identify fill depth in any bore
  • Select appropriate strategies for recovery of dropped augers
  • Recover drill string using winch and/or head/kelly
  • Insert surface casing and deepen hole using smaller diameter auger or bucket, if required
  • Disassemble drill string and change augers and bit components
  • Select bits for formation being drilled
  • Select appropriate augering method for situation
  • Maintain spoil removal from hole collar with appropriate safety protocols
  • Cover and secure bores to ensure safety of others and crew
  • Communicate effectively with crew, clients and management
  • Prepare and submit paperwork for daily activities
  • Ensure appropriate personal protective equipment and work clothing for the task is worn
  • Constantly maintain safe working conditions
  • Select and use water and drilling fluids as appropriate
  • Bell foundation piles, if required
  • Clean pile bases and insert reinforcement cages, if required
  • Deploy bucket augers through surface casing and when drilling under bentonite muds
  • Use spin off and side casting of spoil as appropriate
  • Record daily hole depths and progress
       
Element: Maintain equipment
  • Monitor external wear in drill string, rotate string elements to ensure even wear
  • Interchange drill bits and/or drill bit elements to maintain free cutting ability
  • Check all string and equipment elements for wear and proper function
  • Replace worn elements in string, bits and equipment and recycle 'out of specification' equipment for repair or redundancy
  • Apply lubrication as appropriate
  • Maintain good housekeeping on site and for equipment in storage
       
Element: Respond to problems
  • Identify possible operational problems in equipment or process
  • Identify symptoms of problems needing remedial action
  • Determine possible fault causes
  • Rectify problem using appropriate solution within area of responsibility
  • Follow through items initiated until final resolution has occurred
  • Report problems outside area of responsibility to designated person
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for conducting of large diameter auger drilling

implementation of requirements, procedures and techniques for the safe, effective and efficient completion of large diameter auger drilling tasks

working with others to undertake and complete the large diameter auger drilling tasks that meets all of the required outcomes

consistent timely completion of large diameter auger drilling that safely, effectively and efficiently meets the required outcomes

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes

consistently achieving the required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete large diameter auger drilling tasks

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to conduct large diameter auger drilling:

apply legislative, organisation and site requirements and procedures for the conducting of large diameter auger drilling

apply occupational health and safety requirements and procedures

apply techniques for rig carrier to positioning and movement between holes, and reaching several holes from the one set up position where turntable or boom deployment of rotary head is used

apply rig stabilisation and levelling techniques

identify components for various auger techniques and sizes

apply equipment assembly, inspection and servicing procedures

apply rig operating functions and controls with safety

apply water levels recording procedures

apply grout mixing techniques and placement application methods

apply mechanical and manual handling safety requirements and procedures

apply metric and imperial units conversion

apply mathematical calculations using addition, subtraction, multiplication and division

use a calculator to calculate hole volume

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to conduct large diameter auger drilling:

occupational health and safety responsibilities

environmental protection measures and aspects

basic geological formations expected and their properties

equipment and spares identification and characteristics

technical capabilities, system limitations, gauge readings and their interpretation

site hazards identification, assessment and control measures requirements and procedures

operational maintenance procedures for rig and equipment including pre-start checks

use of diagrams, plans and instructions for positioning, recording work or progress

use of tape measures and devices for assessing depth drilled

use of water, mud and foam injection for jet auger drilling and/or screw pipe drilling

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation

may include:

legislative, organisational and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Work instructions may come from:

briefings, handovers, plans and work orders and may be written or verbal, formal or informal and may include:

nature and scope of tasks

specifications

quality of finished works

achievement targets

operational conditions

obtaining of permits required

site layout

out of bounds areas

worksite inspection requirements

lighting conditions

plant or equipment defects

hazards and potential hazards

coordination requirements or issues

contamination control requirements

environmental control requirements

barricade and signage requirements

Hazards include:

underground services and other hazards

overhead utilities (e.g. electricity)

Hazard management includes:

appropriate personal protective equipment

following safe working practices

Coordination requirements may include

drill team

other equipment operators

maintenance personnel

supervisors

worksite personnel

Personal protective equipment includes:

steel-capped boots and hardhat

gloves

dust mask

eye and hearing protection

general protective and reflective clothing

Fluids may include:

water, mud foam used to assist cutting removal in screw pile or jet auger applications

Equipment may include:

short flight augers with a range of spirals

jet augers and long screw pile augers

bucket augers

belling or under-reaming tools (pier hole)

auger recovery tools

Operational problems may include:

straighten holes and starting straight holes

encountering excessive water

cork screwing effect when hold back not set properly

balancing bit cutting action with hole clearing action

occupational health and safety issues relating to rotating plant including catching long hair, loose clothing, finger injuries, safety with lifting and carrying

obstructions in hole

proximity to embankments

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation relevant to the work activity 
Obtain, confirm and apply work instructions for the allocated task 
Identify, manage and report all potential hazards 
Resolve coordination requirements with others at the site prior to commencing and during work activities 
Induct site visitors as required by procedures 
Collar borehole, start hole, maintain hole alignment, take corrective action for deflections 
Make up appropriate drill string 
Handle additional drill stems, inserting them in the drill string 
Use appropriate gears, rotation, feed and holdback so that flights or bucket are substantially full for the soil being drilled at any given depth 
Interpret drilling factors to determine conditions at the bit 
Make and break auger string and drive head connections safely 
Maintain a clear hole and a clear bottom and deploy tools for cleaning hole bottom at completed depth 
Interpret or calculate actual depth at any point during drilling, interpret depth of strata changes and identify fill depth in any bore 
Select appropriate strategies for recovery of dropped augers 
Recover drill string using winch and/or head/kelly 
Insert surface casing and deepen hole using smaller diameter auger or bucket, if required 
Disassemble drill string and change augers and bit components 
Select bits for formation being drilled 
Select appropriate augering method for situation 
Maintain spoil removal from hole collar with appropriate safety protocols 
Cover and secure bores to ensure safety of others and crew 
Communicate effectively with crew, clients and management 
Prepare and submit paperwork for daily activities 
Ensure appropriate personal protective equipment and work clothing for the task is worn 
Constantly maintain safe working conditions 
Select and use water and drilling fluids as appropriate 
Bell foundation piles, if required 
Clean pile bases and insert reinforcement cages, if required 
Deploy bucket augers through surface casing and when drilling under bentonite muds 
Use spin off and side casting of spoil as appropriate 
Record daily hole depths and progress 
Monitor external wear in drill string, rotate string elements to ensure even wear 
Interchange drill bits and/or drill bit elements to maintain free cutting ability 
Check all string and equipment elements for wear and proper function 
Replace worn elements in string, bits and equipment and recycle 'out of specification' equipment for repair or redundancy 
Apply lubrication as appropriate 
Maintain good housekeeping on site and for equipment in storage 
Identify possible operational problems in equipment or process 
Identify symptoms of problems needing remedial action 
Determine possible fault causes 
Rectify problem using appropriate solution within area of responsibility 
Follow through items initiated until final resolution has occurred 
Report problems outside area of responsibility to designated person 

Forms

Assessment Cover Sheet

RIINHB306A - Conduct large diameter auger drilling
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIINHB306A - Conduct large diameter auger drilling

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: