Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIINHB317D Mapping and Delivery Guide
Install underground in-seam directional drilling standpipes

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIINHB317D - Install underground in-seam directional drilling standpipes
Description
Employability Skills
Learning Outcomes and Application This unit describes a participant’s skills and knowledge required to install underground in-seam directional drilling standpipes in Coal mining and Drilling. This unit is appropriate for those working in driller roles.No licensing, legislative or certification requirements apply to this unit at the time of publication
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for installing underground in-seam directional drilling standpipe
  • Access, interpret and apply install unground in-seam directional drilling standpipes documentation and the work activity is compliant
  • Obtain, read, interpret, clarify and confirm work requirements
  • Identify and address potential risks, hazards and environmental issues and implement control measures
  • Select and wear personal protective equipment appropriate for work activities
  • Communicate and coordinate activities with others throughout the work activity
  • Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
       
Element: Perform rib consolidation
  • Carry out pre-start and start up procedures
  • Identify, select and apply rig operational controls
  • Prepare for rib consolidation drilling
  • Carry out rib consolidation drilling
  • Monitor and adjust drilling technique according to conditions
  • Identify and remedy operational problems
  • Insert and seal grouting tubes into rib consolidation holes
  • Inject grout through the grouting tubes until visible evidence that grout has migrated into any coal rib fractures or cracks
  • Carryout individual grouting completion procedure
       
Element: Drill and ream hole and install standpipe
  • Prepare for drilling and reaming
  • Choose drill bit and reamer appropriate to the geology
  • Carry out pilot hole drilling and ream standpipe hole
  • Monitor and adjust drilling technique according to conditions
  • Prepare and install standpipe
  • Grout in standpipe
  • Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment
       
Element: Complete equipment maintenance and housekeeping
  • Carry out shutdown procedures and secure equipment
  • Monitor the drill rods for wear and damage and dress and grease threads
  • Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action
  • Clean and maintain all grouting equipment
  • Ensure housekeeping activities are completed
  • Process records
       
Element: Plan and prepare for installing underground in-seam directional drilling standpipe
  • Access, interpret and apply install unground in-seam directional drilling standpipes documentation and the work activity is compliant
  • Obtain, read, interpret, clarify and confirm work requirements
  • Identify and address potential risks, hazards and environmental issues and implement control measures
  • Select and wear personal protective equipment appropriate for work activities
  • Communicate and coordinate activities with others throughout the work activity
  • Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
       
Element: Perform rib consolidation
  • Carry out pre-start and start up procedures
  • Identify, select and apply rig operational controls
  • Prepare for rib consolidation drilling
  • Carry out rib consolidation drilling
  • Monitor and adjust drilling technique according to conditions
  • Identify and remedy operational problems
  • Insert and seal grouting tubes into rib consolidation holes
  • Inject grout through the grouting tubes until visible evidence that grout has migrated into any coal rib fractures or cracks
  • Carryout individual grouting completion procedure
       
Element: Drill and ream hole and install standpipe
  • Prepare for drilling and reaming
  • Choose drill bit and reamer appropriate to the geology
  • Carry out pilot hole drilling and ream standpipe hole
  • Monitor and adjust drilling technique according to conditions
  • Prepare and install standpipe
  • Grout in standpipe
  • Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment
       
Element: Complete equipment maintenance and housekeeping
  • Carry out shutdown procedures and secure equipment
  • Monitor the drill rods for wear and damage and dress and grease threads
  • Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action
  • Clean and maintain all grouting equipment
  • Ensure housekeeping activities are completed
  • Process records
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare for installing underground in-seam directional drilling standpipe

1.1 Access, interpret and apply install unground in-seam directional drilling standpipes documentation and the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Communicate and coordinate activities with others throughout the work activity

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Perform rib consolidation

2.1 Carry out pre-start and start up procedures

2.2 Identify, select and apply rig operational controls

2.3 Prepare for rib consolidation drilling

2.4 Carry out rib consolidation drilling

2.5 Monitor and adjust drilling technique according to conditions

2.6 Identify and remedy operational problems

2.7 Insert and seal grouting tubes into rib consolidation holes

2.8 Inject grout through the grouting tubes until visible evidence that grout has migrated into any coal rib fractures or cracks

2.9 Carryout individual grouting completion procedure

3. Drill and ream hole and install standpipe

3.1 Prepare for drilling and reaming

3.2 Choose drill bit and reamer appropriate to the geology

3.3 Carry out pilot hole drilling and ream standpipe hole

3.4 Monitor and adjust drilling technique according to conditions

3.5 Prepare and install standpipe

3.6 Grout in standpipe

3.7 Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

4. Complete equipment maintenance and housekeeping

4.1 Carry out shutdown procedures and secure equipment

4.2 Monitor the drill rods for wear and damage and dress and grease threads

4.3 Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action

4.4 Clean and maintain all grouting equipment

4.5 Ensure housekeeping activities are completed

4.6 Process records

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient completion of the installation of underground in-seam directional drilling standpipe including:

applying safe manual handling practices

identifying, selecting and applying rig operational controls

operating hand borers

operating grouting equipment

conducting inspection and monitoring

conducting equipment maintenance

reading, interpreting and applying drill plans

works effectively with others to undertake and complete the installation of underground in-seam directional drilling standpipe that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to resolve coordination requirements prior to commencing and during work activities

demonstrates completion of installation of underground in-seam directional drilling standpipes that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

carrying out rib consolidation drilling

inserting and sealing grouting tubes into rib consolidation holes

choosing drill bit and reamer appropriate to the geology

carrying out pilot hole drilling and ream standpipe hole

monitoring and adjusting drilling technique according to conditions

grouting in standpipe

The candidate must demonstrate knowledge in installing underground in-seam directional drilling standpipes through:

accessing, interpreting and applying the organisation and site requirements and procedures for:

work, health and safety

environmental issues

operating drill rig

housekeeping

potential underground directional drilling hazards

the manufacturer’s requirements and procedures

the specific handling requirements for underground drilling equipment

basic geology types and their impact on underground in-seam directional drilling operations

drill bits for different geology types

reamers for different geology types

importance and functions of the standpipe

being prepared for fire/accident/emergency


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare for installing underground in-seam directional drilling standpipe

1.1 Access, interpret and apply install unground in-seam directional drilling standpipes documentation and the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues and implement control measures

1.4 Select and wear personal protective equipment appropriate for work activities

1.5 Communicate and coordinate activities with others throughout the work activity

1.6 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency

2. Perform rib consolidation

2.1 Carry out pre-start and start up procedures

2.2 Identify, select and apply rig operational controls

2.3 Prepare for rib consolidation drilling

2.4 Carry out rib consolidation drilling

2.5 Monitor and adjust drilling technique according to conditions

2.6 Identify and remedy operational problems

2.7 Insert and seal grouting tubes into rib consolidation holes

2.8 Inject grout through the grouting tubes until visible evidence that grout has migrated into any coal rib fractures or cracks

2.9 Carryout individual grouting completion procedure

3. Drill and ream hole and install standpipe

3.1 Prepare for drilling and reaming

3.2 Choose drill bit and reamer appropriate to the geology

3.3 Carry out pilot hole drilling and ream standpipe hole

3.4 Monitor and adjust drilling technique according to conditions

3.5 Prepare and install standpipe

3.6 Grout in standpipe

3.7 Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment

4. Complete equipment maintenance and housekeeping

4.1 Carry out shutdown procedures and secure equipment

4.2 Monitor the drill rods for wear and damage and dress and grease threads

4.3 Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action

4.4 Clean and maintain all grouting equipment

4.5 Ensure housekeeping activities are completed

4.6 Process records

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply install unground in-seam directional drilling standpipes documentation and the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues and implement control measures 
Select and wear personal protective equipment appropriate for work activities 
Communicate and coordinate activities with others throughout the work activity 
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency 
Carry out pre-start and start up procedures 
Identify, select and apply rig operational controls 
Prepare for rib consolidation drilling 
Carry out rib consolidation drilling 
Monitor and adjust drilling technique according to conditions 
Identify and remedy operational problems 
Insert and seal grouting tubes into rib consolidation holes 
Inject grout through the grouting tubes until visible evidence that grout has migrated into any coal rib fractures or cracks 
Carryout individual grouting completion procedure 
Prepare for drilling and reaming 
Choose drill bit and reamer appropriate to the geology 
Carry out pilot hole drilling and ream standpipe hole 
Monitor and adjust drilling technique according to conditions 
Prepare and install standpipe 
Grout in standpipe 
Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment 
Carry out shutdown procedures and secure equipment 
Monitor the drill rods for wear and damage and dress and grease threads 
Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action 
Clean and maintain all grouting equipment 
Ensure housekeeping activities are completed 
Process records 
Access, interpret and apply install unground in-seam directional drilling standpipes documentation and the work activity is compliant 
Obtain, read, interpret, clarify and confirm work requirements 
Identify and address potential risks, hazards and environmental issues and implement control measures 
Select and wear personal protective equipment appropriate for work activities 
Communicate and coordinate activities with others throughout the work activity 
Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency 
Carry out pre-start and start up procedures 
Identify, select and apply rig operational controls 
Prepare for rib consolidation drilling 
Carry out rib consolidation drilling 
Monitor and adjust drilling technique according to conditions 
Identify and remedy operational problems 
Insert and seal grouting tubes into rib consolidation holes 
Inject grout through the grouting tubes until visible evidence that grout has migrated into any coal rib fractures or cracks 
Carryout individual grouting completion procedure 
Prepare for drilling and reaming 
Choose drill bit and reamer appropriate to the geology 
Carry out pilot hole drilling and ream standpipe hole 
Monitor and adjust drilling technique according to conditions 
Prepare and install standpipe 
Grout in standpipe 
Continually monitor hazards and risks , and ensure safety of self, other personnel, plant and equipment 
Carry out shutdown procedures and secure equipment 
Monitor the drill rods for wear and damage and dress and grease threads 
Monitor all drill equipment and hoses and ancillary equipment and carryout remedial action 
Clean and maintain all grouting equipment 
Ensure housekeeping activities are completed 
Process records 

Forms

Assessment Cover Sheet

RIINHB317D - Install underground in-seam directional drilling standpipes
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIINHB317D - Install underground in-seam directional drilling standpipes

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: