Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIINHB501D Mapping and Delivery Guide
Plan drilling

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIINHB501D - Plan drilling
Description
Employability Skills
Learning Outcomes and Application This unit describes a participant’s skills and knowledge required to plan drilling in Drilling. This unit is appropriate for those working in management or technical specialist roles.No licensing, legislative or certification requirements apply to this unit at the time of publication
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for planning drilling program
  • Access, interpret and apply drilling planning documentation and ensure the work activity is compliant
  • Define and confirm precise scope of work expected by client and other relevant parties
  • Communicate with all parties clearly and concisely to ensure that priorities and special requirements are understood and acted upon
  • Negotiate an achievable and acceptable contract with the client within the scope of the driller’s legal requirements and legal responsibilities
  • Achieve and document agreement on the drilling plan, by communicating and clarifying intended objectives and contract requirements with all relevant parties
  • Develop, in consultation, a time schedule for all operations
       
Element: Inspect/research site for accessibility, services, hazards, legal and environmental problems
  • Establish size and nature of intended drill sites and designated routes to reach them
  • Assess topographical and geological features and identify preferred drilling sites
  • Locate and interpret specific relevant information from maps, diagrams or from other data
  • Identify legal and environmental limitations, and hazards applying to site and take appropriate action
  • Identify and honour locations of socially or environmentally sensitive areas according to the site agreement
  • Check availability and distance of water and/or other local supplies
       
Element: Select appropriate drilling method
  • Read and evaluate available data relevant to ground conditions
  • Select optimum method of drilling and down hole tools, in consultation with other personnel
       
Element: Prepare cost estimates, quotes and tenders
  • Prepare data for quote listing all necessary activities, materials and sub-contracting services needed
  • Allow a contingency sum for identifiable but uncertain factors
  • Use mathematical calculations and estimations to determine job costs
  • Document and present quote/tender
       
Element: Arrange permits and licences
  • Determine and obtain the required permits and licences
  • Follow correct application procedures
       
Element: Design and organise drilling program
  • Establish action plan to ensure completion of program to client satisfaction, within quality, time and cost parameters
  • Communicate scope of work to crew involved in drilling program
  • Prepare fieldwork instructions, detailing: project location, access, water supply, aims of project and detailed instructions
  • Note variations to scope of work/contractual requirements on log
  • Select appropriate and available crew and other resources for the job
  • Communicate, clearly and concisely, with crew(s) about job requirements, working conditions and role and responsibilities
  • Establish size and nature of intended drill rig sites, and routes for reaching them
  • Specify any access track, clearing or bench construction sizes and compaction required to support rigs and equipment
  • Clarify availability of site amenities and back up support
       
Element: Decide upon methods of controlling flow off site, disposing of wastes and restoring the site after the operations
       
Element: Prepare WHS plan for site
  • Prepare plan to eliminate/mitigate hazards to designated level
  • Ensure signs, hazards and warnings are observed and consequences understood
  • Determine and acquire required safety equipment
  • Incorporate safety rules and regulations, legislation and specific site instructions
  • Obtain sign-off on commitment to work health and safety (WHS) plan from crew
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare for planning drilling program

1.1 Access, interpret and apply drilling planning documentation and ensure the work activity is compliant

1.2 Define and confirm precise scope of work expected by client and other relevant parties

1.3 Communicate with all parties clearly and concisely to ensure that priorities and special requirements are understood and acted upon

1.4 Negotiate an achievable and acceptable contract with the client within the scope of the driller’s legal requirements and legal responsibilities

1.5 Achieve and document agreement on the drilling plan, by communicating and clarifying intended objectives and contract requirements with all relevant parties

1.6 Develop, in consultation, a time schedule for all operations

2. Inspect/research site for accessibility, services, hazards, legal and environmental problems

2.1 Establish size and nature of intended drill sites and designated routes to reach them

2.2 Assess topographical and geological features and identify preferred drilling sites

2.3 Locate and interpret specific relevant information from maps, diagrams or from other data

2.4 Identify legal and environmental limitations, and hazards applying to site and take appropriate action

2.5 Identify and honour locations of socially or environmentally sensitive areas according to the site agreement

2.6 Check availability and distance of water and/or other local supplies

3. Select appropriate drilling method

3.1 Read and evaluate available data relevant to ground conditions

3.2 Select optimum method of drilling and down hole tools, in consultation with other personnel

4. Prepare cost estimates, quotes and tenders

4.1 Prepare data for quote listing all necessary activities, materials and sub-contracting services needed

4.2 Allow a contingency sum for identifiable but uncertain factors

4.3 Use mathematical calculations and estimations to determine job costs

4.4 Document and present quote/tender

5. Arrange permits and licences

5.1 Determine and obtain the required permits and licences

5.2 Follow correct application procedures

6. Design and organise drilling program

6.1 Establish action plan to ensure completion of program to client satisfaction, within quality, time and cost parameters

6.2 Communicate scope of work to crew involved in drilling program

6.3 Prepare fieldwork instructions, detailing: project location, access, water supply, aims of project and detailed instructions

6.4 Note variations to scope of work/contractual requirements on log

6.5 Select appropriate and available crew and other resources for the job

6.6 Communicate, clearly and concisely, with crew(s) about job requirements, working conditions and role and responsibilities

6.7 Establish size and nature of intended drill rig sites, and routes for reaching them

6.8 Specify any access track, clearing or bench construction sizes and compaction required to support rigs and equipment

6.9 Clarify availability of site amenities and back up support

6.10Decide upon methods of controlling flow off site, disposing of wastes and restoring the site after the operations

7. Prepare WHS plan for site

7.1 Prepare plan to eliminate/mitigate hazards to designated level

7.2 Ensure signs, hazards and warnings are observed and consequences understood

7.3 Determine and acquire required safety equipment

7.4 Incorporate safety rules and regulations, legislation and specific site instructions

7.5 Obtain sign-off on commitment to work health and safety (WHS) plan from crew


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare for planning drilling program

1.1 Access, interpret and apply drilling planning documentation and ensure the work activity is compliant

1.2 Define and confirm precise scope of work expected by client and other relevant parties

1.3 Communicate with all parties clearly and concisely to ensure that priorities and special requirements are understood and acted upon

1.4 Negotiate an achievable and acceptable contract with the client within the scope of the driller’s legal requirements and legal responsibilities

1.5 Achieve and document agreement on the drilling plan, by communicating and clarifying intended objectives and contract requirements with all relevant parties

1.6 Develop, in consultation, a time schedule for all operations

2. Inspect/research site for accessibility, services, hazards, legal and environmental problems

2.1 Establish size and nature of intended drill sites and designated routes to reach them

2.2 Assess topographical and geological features and identify preferred drilling sites

2.3 Locate and interpret specific relevant information from maps, diagrams or from other data

2.4 Identify legal and environmental limitations, and hazards applying to site and take appropriate action

2.5 Identify and honour locations of socially or environmentally sensitive areas according to the site agreement

2.6 Check availability and distance of water and/or other local supplies

3. Select appropriate drilling method

3.1 Read and evaluate available data relevant to ground conditions

3.2 Select optimum method of drilling and down hole tools, in consultation with other personnel

4. Prepare cost estimates, quotes and tenders

4.1 Prepare data for quote listing all necessary activities, materials and sub-contracting services needed

4.2 Allow a contingency sum for identifiable but uncertain factors

4.3 Use mathematical calculations and estimations to determine job costs

4.4 Document and present quote/tender

5. Arrange permits and licences

5.1 Determine and obtain the required permits and licences

5.2 Follow correct application procedures

6. Design and organise drilling program

6.1 Establish action plan to ensure completion of program to client satisfaction, within quality, time and cost parameters

6.2 Communicate scope of work to crew involved in drilling program

6.3 Prepare fieldwork instructions, detailing: project location, access, water supply, aims of project and detailed instructions

6.4 Note variations to scope of work/contractual requirements on log

6.5 Select appropriate and available crew and other resources for the job

6.6 Communicate, clearly and concisely, with crew(s) about job requirements, working conditions and role and responsibilities

6.7 Establish size and nature of intended drill rig sites, and routes for reaching them

6.8 Specify any access track, clearing or bench construction sizes and compaction required to support rigs and equipment

6.9 Clarify availability of site amenities and back up support

6.10Decide upon methods of controlling flow off site, disposing of wastes and restoring the site after the operations

7. Prepare WHS plan for site

7.1 Prepare plan to eliminate/mitigate hazards to designated level

7.2 Ensure signs, hazards and warnings are observed and consequences understood

7.3 Determine and acquire required safety equipment

7.4 Incorporate safety rules and regulations, legislation and specific site instructions

7.5 Obtain sign-off on commitment to work health and safety (WHS) plan from crew

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply drilling planning documentation and ensure the work activity is compliant 
Define and confirm precise scope of work expected by client and other relevant parties 
Communicate with all parties clearly and concisely to ensure that priorities and special requirements are understood and acted upon 
Negotiate an achievable and acceptable contract with the client within the scope of the driller’s legal requirements and legal responsibilities 
Achieve and document agreement on the drilling plan, by communicating and clarifying intended objectives and contract requirements with all relevant parties 
Develop, in consultation, a time schedule for all operations 
Establish size and nature of intended drill sites and designated routes to reach them 
Assess topographical and geological features and identify preferred drilling sites 
Locate and interpret specific relevant information from maps, diagrams or from other data 
Identify legal and environmental limitations, and hazards applying to site and take appropriate action 
Identify and honour locations of socially or environmentally sensitive areas according to the site agreement 
Check availability and distance of water and/or other local supplies 
Read and evaluate available data relevant to ground conditions 
Select optimum method of drilling and down hole tools, in consultation with other personnel 
Prepare data for quote listing all necessary activities, materials and sub-contracting services needed 
Allow a contingency sum for identifiable but uncertain factors 
Use mathematical calculations and estimations to determine job costs 
Document and present quote/tender 
Determine and obtain the required permits and licences 
Follow correct application procedures 
Establish action plan to ensure completion of program to client satisfaction, within quality, time and cost parameters 
Communicate scope of work to crew involved in drilling program 
Prepare fieldwork instructions, detailing: project location, access, water supply, aims of project and detailed instructions 
Note variations to scope of work/contractual requirements on log 
Select appropriate and available crew and other resources for the job 
Communicate, clearly and concisely, with crew(s) about job requirements, working conditions and role and responsibilities 
Establish size and nature of intended drill rig sites, and routes for reaching them 
Specify any access track, clearing or bench construction sizes and compaction required to support rigs and equipment 
Clarify availability of site amenities and back up support 
 
Prepare plan to eliminate/mitigate hazards to designated level 
Ensure signs, hazards and warnings are observed and consequences understood 
Determine and acquire required safety equipment 
Incorporate safety rules and regulations, legislation and specific site instructions 
Obtain sign-off on commitment to work health and safety (WHS) plan from crew 

Forms

Assessment Cover Sheet

RIINHB501D - Plan drilling
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIINHB501D - Plan drilling

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: