Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIIWBP601D Mapping and Delivery Guide
Establish and maintain waste and by-product management system

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIIWBP601D - Establish and maintain waste and by-product management system
Description
Employability Skills
Learning Outcomes and Application This unit describes a participant’s skills and knowledge required to establish and maintain a waste and by-product management system in the Coal and Metalliferous mining and Extractive.This unit is appropriate for those working in management or technical specialist roles.No licensing, legislation or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit must be assessed in the context of this sector’s work environment; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare to establish and maintain a waste and by-product management system
  • Access, interpret and apply waste and by-product management system documentation and ensure the work activity is compliant
  • Identify and analyse organisation goals, objectives and strategies
  • Identify the requirements for and purpose of waste and by-product managements system
  • Develop and implement strategies, which translate the objective into the planning process
       
Element: Facilitate site environmental investigations
  • Establish information requirements and ensure information sources are identified and accessed
  • Establish strategies and systems to support analysis of the worksite environments
  • Ensure worksite environments are investigated to identify and assess the factors that impact on waste and by-product development
  • Ensure market opportunities are identified and explored to assist the organisation to forecast trends and options
  • Ensure threats and opportunities are identified, analysed and used to optimise project outcomes
  • Ensure titles searches are undertaken
  • Ensure legal obligations are identified and documented
       
Element: Establishing of water recycling procedures
  • Ensure a detailed scoping of the work requirement and key selection criteria is conducted, including hazard identification and risk analysis
  • Ensure procedures for need, quantity, quality, source and means of treatment of water for production needs are developed and implemented
  • Ensure procedures for water quality and watercourse groundwater contamination are develop and implemented
  • Ensure site treatment works are designed and located for contaminated drainage or development/processing waters, to meet requirements
  • Ensure procedures with appropriate inlet/outlet works and means of improving the natural settlement process are developed and implemented
  • Ensure work schedules for operational best practice associated and water quality specifications are developed and implemented
       
Element: Establish tailing disposal and water recycling operation procedures
  • Ensure a procedure for treated site water reuse is developed and implemented
  • Ensure a program for regular inspections of the water recycling system is developed and implemented
  • Ensure procedures for tailings reuse are developed and implemented
       
Element: Facilitate the design of dam systems
  • Ensure the requirements for and purpose of dam management systems are identified
  • Ensure a specification for the dam management system is developed from a comprehensive analysis of site requirements
  • Ensure dam de-commissioning procedures are developed
       
Element: Facilitate the selection of equipment for waste and by-product management systems
  • Ensure the requirements for and purpose of waste and by-product equipment is identified against system requirements
  • Ensure a detailed scoping of the work requirement and key selection criteria, including hazard identification and risk analysis, is conducted and developed
  • Develop specifications for the required waste and by-product equipment
  • Ensure equipment is selected on the basis of performance against specification requirements
       
Element: Establish installation and commissioning procedures
  • Establish a procedure for hazard identification and risk evaluation
  • Ensure the integration of new and existing systems and process is planned and implemented to achieve optimum performance
  • Ensure safe operating procedures and rules are developed from a detailed analysis of requirements
  • Ensure procedures for installing and commissioning waste and by-product systems and equipment are developed and implemented
  • Ensure a program, including systems and procedures, to satisfy identified training requirements is implemented
  • Ensure emergency response and evacuation systems, plans and procedures are implemented
       
Element: Establish systems for the operation and maintenance of waste and by-product management systems and equipment
  • Ensure operational procedures for systems and equipment are developed, implemented and incorporated into site documentation.
  • Ensure maintenance procedures for systems and equipment are developed, implemented and incorporated into site documentation.
  • Ensure procedures for reviewing and modifying work processes are develop and implemented
       
Element: Establish systems for audit and review of waste and by-product systems and equipment
  • Establish and ensure implementation of procedures to evaluate and confirm system/equipment compliance
  • Ensure that future waste and by-product systems and equipment requirements are identified, assessed and incorporated into planning processes
  • Establish and ensure the implementation of procedures to confirm the currency and compliance of waste and by-product maintenance and safety standards
  • Establish and ensure implementation of the system for recording and reporting of waste and by-product and equipment information
  • Audit the waste and by-product training program for currency and relevance
  • Establish and ensure implementation of procedures for incorporating feedback into the audit/review system
  • Audit emergency response and evacuation systems plans and procedures for compliance
  • Establish and ensure implementation of procedures for response to instances of non-compliance or other discrepancies/deficiencies
       
Element: Plan and prepare to establish and maintain a waste and by-product management system
  • Access, interpret and apply waste and by-product management system documentation and ensure the work activity is compliant
  • Identify and analyse organisation goals, objectives and strategies
  • Identify the requirements for and purpose of waste and by-product managements system
  • Develop and implement strategies, which translate the objective into the planning process
       
Element: Facilitate site environmental investigations
  • Establish information requirements and ensure information sources are identified and accessed
  • Establish strategies and systems to support analysis of the worksite environments
  • Ensure worksite environments are investigated to identify and assess the factors that impact on waste and by-product development
  • Ensure market opportunities are identified and explored to assist the organisation to forecast trends and options
  • Ensure threats and opportunities are identified, analysed and used to optimise project outcomes
  • Ensure titles searches are undertaken
  • Ensure legal obligations are identified and documented
       
Element: Establishing of water recycling procedures
  • Ensure a detailed scoping of the work requirement and key selection criteria is conducted, including hazard identification and risk analysis
  • Ensure procedures for need, quantity, quality, source and means of treatment of water for production needs are developed and implemented
  • Ensure procedures for water quality and watercourse groundwater contamination are develop and implemented
  • Ensure site treatment works are designed and located for contaminated drainage or development/processing waters, to meet requirements
  • Ensure procedures with appropriate inlet/outlet works and means of improving the natural settlement process are developed and implemented
  • Ensure work schedules for operational best practice associated and water quality specifications are developed and implemented
       
Element: Establish tailing disposal and water recycling operation procedures
  • Ensure a procedure for treated site water reuse is developed and implemented
  • Ensure a program for regular inspections of the water recycling system is developed and implemented
  • Ensure procedures for tailings reuse are developed and implemented
       
Element: Facilitate the design of dam systems
  • Ensure the requirements for and purpose of dam management systems are identified
  • Ensure a specification for the dam management system is developed from a comprehensive analysis of site requirements
  • Ensure dam de-commissioning procedures are developed
       
Element: Facilitate the selection of equipment for waste and by-product management systems
  • Ensure the requirements for and purpose of waste and by-product equipment is identified against system requirements
  • Ensure a detailed scoping of the work requirement and key selection criteria, including hazard identification and risk analysis, is conducted and developed
  • Develop specifications for the required waste and by-product equipment
  • Ensure equipment is selected on the basis of performance against specification requirements
       
Element: Establish installation and commissioning procedures
  • Establish a procedure for hazard identification and risk evaluation
  • Ensure the integration of new and existing systems and process is planned and implemented to achieve optimum performance
  • Ensure safe operating procedures and rules are developed from a detailed analysis of requirements
  • Ensure procedures for installing and commissioning waste and by-product systems and equipment are developed and implemented
  • Ensure a program, including systems and procedures, to satisfy identified training requirements is implemented
  • Ensure emergency response and evacuation systems, plans and procedures are implemented
       
Element: Establish systems for the operation and maintenance of waste and by-product management systems and equipment
  • Ensure operational procedures for systems and equipment are developed, implemented and incorporated into site documentation.
  • Ensure maintenance procedures for systems and equipment are developed, implemented and incorporated into site documentation.
  • Ensure procedures for reviewing and modifying work processes are develop and implemented
       
Element: Establish systems for audit and review of waste and by-product systems and equipment
  • Establish and ensure implementation of procedures to evaluate and confirm system/equipment compliance
  • Ensure that future waste and by-product systems and equipment requirements are identified, assessed and incorporated into planning processes
  • Establish and ensure the implementation of procedures to confirm the currency and compliance of waste and by-product maintenance and safety standards
  • Establish and ensure implementation of the system for recording and reporting of waste and by-product and equipment information
  • Audit the waste and by-product training program for currency and relevance
  • Establish and ensure implementation of procedures for incorporating feedback into the audit/review system
  • Audit emergency response and evacuation systems plans and procedures for compliance
  • Establish and ensure implementation of procedures for response to instances of non-compliance or other discrepancies/deficiencies
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1. Plan and prepare to establish and maintain a waste and by-product management system

1.1 Access, interpret and apply waste and by-product management system documentation and ensure the work activity is compliant

1.2 Identify and analyse organisation goals, objectives and strategies

1.3 Identify the requirements for and purpose of waste and by-product managements system

1.4 Develop and implement strategies, which translate the objective into the planning process

2. Facilitate site environmental investigations

2.1 Establish information requirements and ensure information sources are identified and accessed

2.2 Establish strategies and systems to support analysis of the worksite environments

2.3 Ensure worksite environments are investigated to identify and assess the factors that impact on waste and by-product development

2.4 Ensure market opportunities are identified and explored to assist the organisation to forecast trends and options

2.5 Ensure threats and opportunities are identified, analysed and used to optimise project outcomes

2.6 Ensure titles searches are undertaken

2.7 Ensure legal obligations are identified and documented

3. Establishing of water recycling procedures

3.1 Ensure a detailed scoping of the work requirement and key selection criteria is conducted, including hazard identification and risk analysis

3.2 Ensure procedures for need, quantity, quality, source and means of treatment of water for production needs are developed and implemented

3.3 Ensure procedures for water quality and watercourse groundwater contamination are develop and implemented

3.4 Ensure site treatment works are designed and located for contaminated drainage or development/processing waters, to meet requirements

3.5 Ensure procedures with appropriate inlet/outlet works and means of improving the natural settlement process are developed and implemented

3.6 Ensure work schedules for operational best practice associated and water quality specifications are developed and implemented

4. Establish tailing disposal and water recycling operation procedures

4.1 Ensure a procedure for treated site water reuse is developed and implemented

4.2 Ensure a program for regular inspections of the water recycling system is developed and implemented

4.3 Ensure procedures for tailings reuse are developed and implemented

5. Facilitate the design of dam systems

5.1 Ensure the requirements for and purpose of dam management systems are identified

5.2 Ensure a specification for the dam management system is developed from a comprehensive analysis of site requirements

5.3 Ensure dam de-commissioning procedures are developed

6. Facilitate the selection of equipment for waste and by-product management systems

6.1 Ensure the requirements for and purpose of waste and by-product equipment is identified against system requirements

6.2 Ensure a detailed scoping of the work requirement and key selection criteria, including hazard identification and risk analysis, is conducted and developed

6.3 Develop specifications for the required waste and by-product equipment

6.4 Ensure equipment is selected on the basis of performance against specification requirements

7. Establish installation and commissioning procedures

7.1 Establish a procedure for hazard identification and risk evaluation

7.2 Ensure the integration of new and existing systems and process is planned and implemented to achieve optimum performance

7.3 Ensure safe operating procedures and rules are developed from a detailed analysis of requirements

7.4 Ensure procedures for installing and commissioning waste and by-product systems and equipment are developed and implemented

7.5 Ensure a program, including systems and procedures, to satisfy identified training requirements is implemented

7.6 Ensure emergency response and evacuation systems, plans and procedures are implemented

8. Establish systems for the operation and maintenance of waste and by-product management systems and equipment

8.1 Ensure operational procedures for systems and equipment are developed, implemented and incorporated into site documentation.

8.2 Ensure maintenance procedures for systems and equipment are developed, implemented and incorporated into site documentation.

8.3 Ensure procedures for reviewing and modifying work processes are develop and implemented

9. Establish systems for audit and review of waste and by-product systems and equipment

9.1 Establish and ensure implementation of procedures to evaluate and confirm system/equipment compliance

9.2 Ensure that future waste and by-product systems and equipment requirements are identified, assessed and incorporated into planning processes

9.3 Establish and ensure the implementation of procedures to confirm the currency and compliance of waste and by-product maintenance and safety standards

9.4 Establish and ensure implementation of the system for recording and reporting of waste and by-product and equipment information

9.5 Audit the waste and by-product training program for currency and relevance

9.6 Establish and ensure implementation of procedures for incorporating feedback into the audit/review system

9.7 Audit emergency response and evacuation systems plans and procedures for compliance

9.8 Establish and ensure implementation of procedures for response to instances of non-compliance or other discrepancies/deficiencies

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

implements the requirements, procedures and techniques for the safe, effective and efficient establishing and maintenance of waste and by-product management systems including:

facilitating the site environmental investigation

facilitating the design of dam systems

developing, implementing, communicating and maintaining system procedures

selecting the required plant and equipment

information management

accessing, analysing and reviewing waste management systems

auditing waste management performance

coordinating human, financial and physical resources

evaluating new and used equipment

identifying and applying people and process management techniques

using conflict resolution

negotiation with internal/external stakeholders

providing team leadership

demonstrates completion of the establishment and maintenance of waste and by-product management systems that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

identifying, assessing and selecting program components

identifying required information and scope of work

identifying, assessing and selecting system options, including;

design of dams

selection of equipment

installation and commissioning procedures

accessing, interpreting and analysing research, information and requirements

identifying and applying strategies and systems to investigate the worksite

ensuring worksite environmental investigations are completed

developing contingency and site plans and procedures for the system

developing and implementing information and training systems

monitoring, recording and reporting on system performance

The candidate must demonstrate knowledge in establishing and maintaining a waste and by-product management system through:

accessing, interpreting and applying dam design and construction techniques

accessing, interpreting and applying site plans

identifying site products and services

identifying and applying operations techniques

identifying and applying training and assessment systems

accessing, interpreting and applying water recycling techniques


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1. Plan and prepare to establish and maintain a waste and by-product management system

1.1 Access, interpret and apply waste and by-product management system documentation and ensure the work activity is compliant

1.2 Identify and analyse organisation goals, objectives and strategies

1.3 Identify the requirements for and purpose of waste and by-product managements system

1.4 Develop and implement strategies, which translate the objective into the planning process

2. Facilitate site environmental investigations

2.1 Establish information requirements and ensure information sources are identified and accessed

2.2 Establish strategies and systems to support analysis of the worksite environments

2.3 Ensure worksite environments are investigated to identify and assess the factors that impact on waste and by-product development

2.4 Ensure market opportunities are identified and explored to assist the organisation to forecast trends and options

2.5 Ensure threats and opportunities are identified, analysed and used to optimise project outcomes

2.6 Ensure titles searches are undertaken

2.7 Ensure legal obligations are identified and documented

3. Establishing of water recycling procedures

3.1 Ensure a detailed scoping of the work requirement and key selection criteria is conducted, including hazard identification and risk analysis

3.2 Ensure procedures for need, quantity, quality, source and means of treatment of water for production needs are developed and implemented

3.3 Ensure procedures for water quality and watercourse groundwater contamination are develop and implemented

3.4 Ensure site treatment works are designed and located for contaminated drainage or development/processing waters, to meet requirements

3.5 Ensure procedures with appropriate inlet/outlet works and means of improving the natural settlement process are developed and implemented

3.6 Ensure work schedules for operational best practice associated and water quality specifications are developed and implemented

4. Establish tailing disposal and water recycling operation procedures

4.1 Ensure a procedure for treated site water reuse is developed and implemented

4.2 Ensure a program for regular inspections of the water recycling system is developed and implemented

4.3 Ensure procedures for tailings reuse are developed and implemented

5. Facilitate the design of dam systems

5.1 Ensure the requirements for and purpose of dam management systems are identified

5.2 Ensure a specification for the dam management system is developed from a comprehensive analysis of site requirements

5.3 Ensure dam de-commissioning procedures are developed

6. Facilitate the selection of equipment for waste and by-product management systems

6.1 Ensure the requirements for and purpose of waste and by-product equipment is identified against system requirements

6.2 Ensure a detailed scoping of the work requirement and key selection criteria, including hazard identification and risk analysis, is conducted and developed

6.3 Develop specifications for the required waste and by-product equipment

6.4 Ensure equipment is selected on the basis of performance against specification requirements

7. Establish installation and commissioning procedures

7.1 Establish a procedure for hazard identification and risk evaluation

7.2 Ensure the integration of new and existing systems and process is planned and implemented to achieve optimum performance

7.3 Ensure safe operating procedures and rules are developed from a detailed analysis of requirements

7.4 Ensure procedures for installing and commissioning waste and by-product systems and equipment are developed and implemented

7.5 Ensure a program, including systems and procedures, to satisfy identified training requirements is implemented

7.6 Ensure emergency response and evacuation systems, plans and procedures are implemented

8. Establish systems for the operation and maintenance of waste and by-product management systems and equipment

8.1 Ensure operational procedures for systems and equipment are developed, implemented and incorporated into site documentation.

8.2 Ensure maintenance procedures for systems and equipment are developed, implemented and incorporated into site documentation.

8.3 Ensure procedures for reviewing and modifying work processes are develop and implemented

9. Establish systems for audit and review of waste and by-product systems and equipment

9.1 Establish and ensure implementation of procedures to evaluate and confirm system/equipment compliance

9.2 Ensure that future waste and by-product systems and equipment requirements are identified, assessed and incorporated into planning processes

9.3 Establish and ensure the implementation of procedures to confirm the currency and compliance of waste and by-product maintenance and safety standards

9.4 Establish and ensure implementation of the system for recording and reporting of waste and by-product and equipment information

9.5 Audit the waste and by-product training program for currency and relevance

9.6 Establish and ensure implementation of procedures for incorporating feedback into the audit/review system

9.7 Audit emergency response and evacuation systems plans and procedures for compliance

9.8 Establish and ensure implementation of procedures for response to instances of non-compliance or other discrepancies/deficiencies

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply waste and by-product management system documentation and ensure the work activity is compliant 
Identify and analyse organisation goals, objectives and strategies 
Identify the requirements for and purpose of waste and by-product managements system 
Develop and implement strategies, which translate the objective into the planning process 
Establish information requirements and ensure information sources are identified and accessed 
Establish strategies and systems to support analysis of the worksite environments 
Ensure worksite environments are investigated to identify and assess the factors that impact on waste and by-product development 
Ensure market opportunities are identified and explored to assist the organisation to forecast trends and options 
Ensure threats and opportunities are identified, analysed and used to optimise project outcomes 
Ensure titles searches are undertaken 
Ensure legal obligations are identified and documented 
Ensure a detailed scoping of the work requirement and key selection criteria is conducted, including hazard identification and risk analysis 
Ensure procedures for need, quantity, quality, source and means of treatment of water for production needs are developed and implemented 
Ensure procedures for water quality and watercourse groundwater contamination are develop and implemented 
Ensure site treatment works are designed and located for contaminated drainage or development/processing waters, to meet requirements 
Ensure procedures with appropriate inlet/outlet works and means of improving the natural settlement process are developed and implemented 
Ensure work schedules for operational best practice associated and water quality specifications are developed and implemented 
Ensure a procedure for treated site water reuse is developed and implemented 
Ensure a program for regular inspections of the water recycling system is developed and implemented 
Ensure procedures for tailings reuse are developed and implemented 
Ensure the requirements for and purpose of dam management systems are identified 
Ensure a specification for the dam management system is developed from a comprehensive analysis of site requirements 
Ensure dam de-commissioning procedures are developed 
Ensure the requirements for and purpose of waste and by-product equipment is identified against system requirements 
Ensure a detailed scoping of the work requirement and key selection criteria, including hazard identification and risk analysis, is conducted and developed 
Develop specifications for the required waste and by-product equipment 
Ensure equipment is selected on the basis of performance against specification requirements 
Establish a procedure for hazard identification and risk evaluation 
Ensure the integration of new and existing systems and process is planned and implemented to achieve optimum performance 
Ensure safe operating procedures and rules are developed from a detailed analysis of requirements 
Ensure procedures for installing and commissioning waste and by-product systems and equipment are developed and implemented 
Ensure a program, including systems and procedures, to satisfy identified training requirements is implemented 
Ensure emergency response and evacuation systems, plans and procedures are implemented 
Ensure operational procedures for systems and equipment are developed, implemented and incorporated into site documentation. 
Ensure maintenance procedures for systems and equipment are developed, implemented and incorporated into site documentation. 
Ensure procedures for reviewing and modifying work processes are develop and implemented 
Establish and ensure implementation of procedures to evaluate and confirm system/equipment compliance 
Ensure that future waste and by-product systems and equipment requirements are identified, assessed and incorporated into planning processes 
Establish and ensure the implementation of procedures to confirm the currency and compliance of waste and by-product maintenance and safety standards 
Establish and ensure implementation of the system for recording and reporting of waste and by-product and equipment information 
Audit the waste and by-product training program for currency and relevance 
Establish and ensure implementation of procedures for incorporating feedback into the audit/review system 
Audit emergency response and evacuation systems plans and procedures for compliance 
Establish and ensure implementation of procedures for response to instances of non-compliance or other discrepancies/deficiencies 
Access, interpret and apply waste and by-product management system documentation and ensure the work activity is compliant 
Identify and analyse organisation goals, objectives and strategies 
Identify the requirements for and purpose of waste and by-product managements system 
Develop and implement strategies, which translate the objective into the planning process 
Establish information requirements and ensure information sources are identified and accessed 
Establish strategies and systems to support analysis of the worksite environments 
Ensure worksite environments are investigated to identify and assess the factors that impact on waste and by-product development 
Ensure market opportunities are identified and explored to assist the organisation to forecast trends and options 
Ensure threats and opportunities are identified, analysed and used to optimise project outcomes 
Ensure titles searches are undertaken 
Ensure legal obligations are identified and documented 
Ensure a detailed scoping of the work requirement and key selection criteria is conducted, including hazard identification and risk analysis 
Ensure procedures for need, quantity, quality, source and means of treatment of water for production needs are developed and implemented 
Ensure procedures for water quality and watercourse groundwater contamination are develop and implemented 
Ensure site treatment works are designed and located for contaminated drainage or development/processing waters, to meet requirements 
Ensure procedures with appropriate inlet/outlet works and means of improving the natural settlement process are developed and implemented 
Ensure work schedules for operational best practice associated and water quality specifications are developed and implemented 
Ensure a procedure for treated site water reuse is developed and implemented 
Ensure a program for regular inspections of the water recycling system is developed and implemented 
Ensure procedures for tailings reuse are developed and implemented 
Ensure the requirements for and purpose of dam management systems are identified 
Ensure a specification for the dam management system is developed from a comprehensive analysis of site requirements 
Ensure dam de-commissioning procedures are developed 
Ensure the requirements for and purpose of waste and by-product equipment is identified against system requirements 
Ensure a detailed scoping of the work requirement and key selection criteria, including hazard identification and risk analysis, is conducted and developed 
Develop specifications for the required waste and by-product equipment 
Ensure equipment is selected on the basis of performance against specification requirements 
Establish a procedure for hazard identification and risk evaluation 
Ensure the integration of new and existing systems and process is planned and implemented to achieve optimum performance 
Ensure safe operating procedures and rules are developed from a detailed analysis of requirements 
Ensure procedures for installing and commissioning waste and by-product systems and equipment are developed and implemented 
Ensure a program, including systems and procedures, to satisfy identified training requirements is implemented 
Ensure emergency response and evacuation systems, plans and procedures are implemented 
Ensure operational procedures for systems and equipment are developed, implemented and incorporated into site documentation. 
Ensure maintenance procedures for systems and equipment are developed, implemented and incorporated into site documentation. 
Ensure procedures for reviewing and modifying work processes are develop and implemented 
Establish and ensure implementation of procedures to evaluate and confirm system/equipment compliance 
Ensure that future waste and by-product systems and equipment requirements are identified, assessed and incorporated into planning processes 
Establish and ensure the implementation of procedures to confirm the currency and compliance of waste and by-product maintenance and safety standards 
Establish and ensure implementation of the system for recording and reporting of waste and by-product and equipment information 
Audit the waste and by-product training program for currency and relevance 
Establish and ensure implementation of procedures for incorporating feedback into the audit/review system 
Audit emergency response and evacuation systems plans and procedures for compliance 
Establish and ensure implementation of procedures for response to instances of non-compliance or other discrepancies/deficiencies 

Forms

Assessment Cover Sheet

RIIWBP601D - Establish and maintain waste and by-product management system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIWBP601D - Establish and maintain waste and by-product management system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: