RIIWMG203A Mapping and Delivery Guide
Drain and dewater civil construction site
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | RIIWMG203A - Drain and dewater civil construction site |
---|---|---|---|
Description | This unit covers draining and/or dewatering of civil construction project sites. It includes: planning and preparing; positioning sedimentation control; remove surface water; constructing sump and wells; removing water from sumps or wells, trenches and pits; and cleaning up. | ||
Employability Skills | This unit contains employability skills. | ||
Learning Outcomes and Application | This unit specifies the competency required to drain and/or dewater civil construction project sites for environmental protection purposes and the control of water, which may affect construction. It is appropriate for those working in a operational roles, at worksites within:Civil construction | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Not applicable. Not applicable. | ||
Competency Field | Refer to Unit Sector(s). |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan and prepare |
| |||||||
Element: Position sedimentation control |
| |||||||
Element: Remove surface water |
| |||||||
Element: Construct sump/wells |
| |||||||
Element: Remove water from sumps/wells, trenches and pits |
| |||||||
Element: Clean up |
|