Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

RIIWSV401D Mapping and Delivery Guide
Rig up and rig down for well servicing

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency RIIWSV401D - Rig up and rig down for well servicing
Description
Employability Skills
Learning Outcomes and Application This unit describes a participant’s skills and knowledge required to applying rig up and rig down for well servicing in Drilling.This unit is appropriate for those working in supervisory or technical specialist roles. Licensing, legislative, regulatory and certification requirements that may apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,

this unit is best assessed in the context of this sector’s work environment;

where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of this sector’s workplace performance, including environment, task skills, task management skills, contingency management skills and job role environment skills; and,

this unit must be assessed in compliance with relevant legislation/regulation and using policies, procedures, processes and operational manuals directly related to the industry sector for which it is being assessed; and,

assessment may be conducted in conjunction with the assessment of other Units of Competency; and,

assessment must confirm consistent performance can be applied in a range of relevant workplace circumstances; and,

assessors must demonstrate the performance evidence, and knowledge evidence as outlined in this Unit of Competency, and through the minimum years of current* work experience specified below in an Industry sector relevant to the outcomes of the unit; or,

where the assessor does not meet experience requirements a co-assessment or partnership arrangement must exist between the qualified assessor and an Industry subject matter expert. The Industry subject matter expert should hold the unit being assessed (or an equivalent unit) and/or demonstrate equivalence of skills and knowledge at the unit level. An Industry technical expert must also demonstrate skills and knowledge from the minimum years of current work experience specified below in the Industry sector, including time spent in roles related to the unit being assessed; and,

assessor and Industry subject matter expert requirements differ depending on the Australian Qualifications Framework Level (AQF) of the qualification being assessed and/or Industry Sector as follows:

Industry sector

AQF** Level

Required assessor or Industry subject matter expert experience

Drilling, Metalliferous Mining, Coal Mining, Extractive (Quarrying) and Civil Construction

1

1 Year

2

2 Years

Drilling, Coal Mining and Extractive (Quarrying)

3-6

3 Years

Metalliferous Mining and Civil Construction

3-6

5 Years

Other sectors

Where this Unit is being assessed outside of the Resources and Infrastructure Sectors assessor and/or Industry subject matter expert experience should be in-line with industry standards for the sector in which it is being assessed and where no Industry standard is specified should comply with any relevant regulation.

*Assessors can demonstrate current work experience through employment within Industry in a role relevant to the outcomes of the Unit; or, for external assessors this can be demonstrated through exposure to Industry by conducting frequent site assessments across various locations.

**Where a unit is being delivered outside of a Qualification the first numeric character in the Unit code should be considered to indicate the AQF level

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for operations
  • Access, interpret and apply compliance documentation and legislation and ensure the work activity is compliant
  • Obtain, read, clarify/confirm and apply work instructions
  • Identify, manage and report all potential hazards
  • Carry out gas testing
  • Confirm well bore stability
  • Resolve coordination requirements with others at the site prior to commencing and during work activities
  • Carry out pre rig-up procedure inspections (by rig manager, operator and crew) in accordance with standards for individual rigs
  • Coordinate movement of load and sequence of installation and location in accordance with rig movement plan
  • Check equipment for damage and/or loss by moving contractor and report and BI in accordance with requirements
       
Element: Rig up
  • Receive, acknowledge and action rig manager authorisation to commence rig-up operations
  • Receive detailed instructions on use and type of mud/fluid/air from the operator and distribute as appropriate and to required specifications
  • Identify potential rig-up problems and take corrective action
  • Keep rig manager informed of operations in accordance with legislative and company requirements
       
Element: Prepare for well servicing operations
  • Check rig and hoist equipment, report damage to rig manager and record in accordance with company policies and procedures
  • Conduct equipment checks for nippling-up or cross-checked with relevant procedures
  • Confirm and check handling equipment for correct sizing and if fit for purpose
  • Confirm availability of and inspect, clean, calibrate and record tubulars in accordance with requirements
  • Check well control equipment against work program requirements
  • Identify special tool requirements and check if fit for purpose and approved for use
       
Element: Prepare start operations
  • Load pipe racks with pipe/ down hole production equipment tubulars and position drill collars for immediate use
  • Inspect /tubulars down hole running tools and prepare for operation
  • Record in writing casing/tubular/down hole tallies and report to appropriate company officer
       
Element: Conduct operations in accordance with instructions
  • Determine optimum circulating rates and operational penetration rates and check deviations are in accordance with operators program
  • Check circulating equipment for immediate operation
  • Check fluid quantity requirements with sufficient being in reserve to kill well and keep hole on full trip
  • Record in writing correct fluid properties in tally book
  • Operate all equipment in accordance with manufacturer regulations and company procedures
  • Maintain a sound working relationship with third party contractors
       
Element: Rig down
  • Receive and action rig manager authorisation to commence rig-down operations
  • Identify potential rig-down problems and take corrective action
  • Keep rig manager informed of operations
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

1 Plan and prepare for operations

1.1 Access, interpret and apply compliance documentation and legislation and ensure the work activity is compliant

1.2 Obtain, read, clarify/confirm and apply work instructions

1.3 Identify, manage and report all potential hazards

1.4 Carry out gas testing

1.5 Confirm well bore stability

1.6 Resolve coordination requirements with others at the site prior to commencing and during work activities

1.7 Carry out pre rig-up procedure inspections (by rig manager, operator and crew) in accordance with standards for individual rigs

1.8 Coordinate movement of load and sequence of installation and location in accordance with rig movement plan

1.9 Check equipment for damage and/or loss by moving contractor and report and BI in accordance with requirements

2 Rig up

2.1 Receive, acknowledge and action rig manager authorisation to commence rig-up operations

2.2 Receive detailed instructions on use and type of mud/fluid/air from the operator and distribute as appropriate and to required specifications

2.3 Identify potential rig-up problems and take corrective action

2.4 Keep rig manager informed of operations in accordance with legislative and company requirements

3. Prepare for well servicing operations

3.1 Check rig and hoist equipment, report damage to rig manager and record in accordance with company policies and procedures

3.2 Conduct equipment checks for nippling-up or cross-checked with relevant procedures

3.3 Confirm and check handling equipment for correct sizing and if fit for purpose

3.4 Confirm availability of and inspect, clean, calibrate and record tubulars in accordance with requirements

3.5 Check well control equipment against work program requirements

3.6 Identify special tool requirements and check if fit for purpose and approved for use

4. Prepare start operations

4.1 Load pipe racks with pipe/ down hole production equipment tubulars and position drill collars for immediate use

4.2 Inspect /tubulars down hole running tools and prepare for operation

4.3 Record in writing casing/tubular/down hole tallies and report to appropriate company officer

5. Conduct operations in accordance with instructions

5.1 Determine optimum circulating rates and operational penetration rates and check deviations are in accordance with operators program

5.2 Check circulating equipment for immediate operation

5.3 Check fluid quantity requirements with sufficient being in reserve to kill well and keep hole on full trip

5.4 Record in writing correct fluid properties in tally book

5.5 Operate all equipment in accordance with manufacturer regulations and company procedures

5.6 Maintain a sound working relationship with third party contractors

6. Rig down

6.1 Receive and action rig manager authorisation to commence rig-down operations

6.2 Identify potential rig-down problems and take corrective action

6.3 Keep rig manager informed of operations

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

locates and applies relevant legislation, documentation, policies and procedures

works effectively with others to undertake and complete preparation for rig up and rig down for well servicing operations that meets all of the required outcomes including:

complying with written and verbal reporting requirements and procedures

communicating clearly and concisely with others to receive and clarify work instructions

communicating clearly and concisely with others to resolve coordination requirements throughout work activities

demonstrates completion of rigging up and rigging down for well servicing that safely, effectively and efficiently meets all of the required outcomes on more than one (1) occasion including:

carrying out gas testing, rig-up and rig-down procedures

monitoring and confirming well bore stability

coordinating load movements

conducting inspections on equipment, report faults and implement corrective actions

loading, inspecting and recording pipe racks with tubulars

identifying circulating and penetration rates

operating relevant plant and equipment

processing written records and reports

The candidate must demonstrate knowledge of rig up and rig down for well servicing through:

accessing, interpreting and applying the organisation and site requirements and procedures

application of the unit rigging and slinging

identifying rig specifications and measurements

performing metric-imperial conversion

determining the program to pre-start operations

identifying and resourcing equipment

carrying out and managing rig up procedures

maintaining fluid systems

performing routine well servicing operations


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

1 Plan and prepare for operations

1.1 Access, interpret and apply compliance documentation and legislation and ensure the work activity is compliant

1.2 Obtain, read, clarify/confirm and apply work instructions

1.3 Identify, manage and report all potential hazards

1.4 Carry out gas testing

1.5 Confirm well bore stability

1.6 Resolve coordination requirements with others at the site prior to commencing and during work activities

1.7 Carry out pre rig-up procedure inspections (by rig manager, operator and crew) in accordance with standards for individual rigs

1.8 Coordinate movement of load and sequence of installation and location in accordance with rig movement plan

1.9 Check equipment for damage and/or loss by moving contractor and report and BI in accordance with requirements

2 Rig up

2.1 Receive, acknowledge and action rig manager authorisation to commence rig-up operations

2.2 Receive detailed instructions on use and type of mud/fluid/air from the operator and distribute as appropriate and to required specifications

2.3 Identify potential rig-up problems and take corrective action

2.4 Keep rig manager informed of operations in accordance with legislative and company requirements

3. Prepare for well servicing operations

3.1 Check rig and hoist equipment, report damage to rig manager and record in accordance with company policies and procedures

3.2 Conduct equipment checks for nippling-up or cross-checked with relevant procedures

3.3 Confirm and check handling equipment for correct sizing and if fit for purpose

3.4 Confirm availability of and inspect, clean, calibrate and record tubulars in accordance with requirements

3.5 Check well control equipment against work program requirements

3.6 Identify special tool requirements and check if fit for purpose and approved for use

4. Prepare start operations

4.1 Load pipe racks with pipe/ down hole production equipment tubulars and position drill collars for immediate use

4.2 Inspect /tubulars down hole running tools and prepare for operation

4.3 Record in writing casing/tubular/down hole tallies and report to appropriate company officer

5. Conduct operations in accordance with instructions

5.1 Determine optimum circulating rates and operational penetration rates and check deviations are in accordance with operators program

5.2 Check circulating equipment for immediate operation

5.3 Check fluid quantity requirements with sufficient being in reserve to kill well and keep hole on full trip

5.4 Record in writing correct fluid properties in tally book

5.5 Operate all equipment in accordance with manufacturer regulations and company procedures

5.6 Maintain a sound working relationship with third party contractors

6. Rig down

6.1 Receive and action rig manager authorisation to commence rig-down operations

6.2 Identify potential rig-down problems and take corrective action

6.3 Keep rig manager informed of operations

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation and legislation and ensure the work activity is compliant 
Obtain, read, clarify/confirm and apply work instructions 
Identify, manage and report all potential hazards 
Carry out gas testing 
Confirm well bore stability 
Resolve coordination requirements with others at the site prior to commencing and during work activities 
Carry out pre rig-up procedure inspections (by rig manager, operator and crew) in accordance with standards for individual rigs 
Coordinate movement of load and sequence of installation and location in accordance with rig movement plan 
Check equipment for damage and/or loss by moving contractor and report and BI in accordance with requirements 
Receive, acknowledge and action rig manager authorisation to commence rig-up operations 
Receive detailed instructions on use and type of mud/fluid/air from the operator and distribute as appropriate and to required specifications 
Identify potential rig-up problems and take corrective action 
Keep rig manager informed of operations in accordance with legislative and company requirements 
Check rig and hoist equipment, report damage to rig manager and record in accordance with company policies and procedures 
Conduct equipment checks for nippling-up or cross-checked with relevant procedures 
Confirm and check handling equipment for correct sizing and if fit for purpose 
Confirm availability of and inspect, clean, calibrate and record tubulars in accordance with requirements 
Check well control equipment against work program requirements 
Identify special tool requirements and check if fit for purpose and approved for use 
Load pipe racks with pipe/ down hole production equipment tubulars and position drill collars for immediate use 
Inspect /tubulars down hole running tools and prepare for operation 
Record in writing casing/tubular/down hole tallies and report to appropriate company officer 
Determine optimum circulating rates and operational penetration rates and check deviations are in accordance with operators program 
Check circulating equipment for immediate operation 
Check fluid quantity requirements with sufficient being in reserve to kill well and keep hole on full trip 
Record in writing correct fluid properties in tally book 
Operate all equipment in accordance with manufacturer regulations and company procedures 
Maintain a sound working relationship with third party contractors 
Receive and action rig manager authorisation to commence rig-down operations 
Identify potential rig-down problems and take corrective action 
Keep rig manager informed of operations 

Forms

Assessment Cover Sheet

RIIWSV401D - Rig up and rig down for well servicing
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIWSV401D - Rig up and rig down for well servicing

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: