Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

SFIAQU410 Mapping and Delivery Guide
Implement a program to operate, maintain or upgrade a recirculating aquaculture system

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency SFIAQU410 - Implement a program to operate, maintain or upgrade a recirculating aquaculture system
Description
Employability Skills
Learning Outcomes and Application This unit of competency describes the skills and knowledge required to plan, implement and monitor a program for the operation, maintenance or upgrade of a recirculating aquaculture system.This unit applies to individuals with the technical expertise to operate the system or facility, trial new processes and supervise staff within an aquaculture environment.All work must be carried out to comply with workplace procedures, according to state/territory health and safety, food safety, biosecurity and environmental regulations, legislation and standards that apply to the workplace.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessment of the skills in this unit of competency must take place under the following conditions:

physical conditions:

skills must be demonstrated in an aquaculture workplace or an environment that accurately represents workplace conditions

resources, equipment and materials:

recirculating aquaculture system to be maintained or upgraded

specifications:

documentation relevant to the operations, maintenance or upgrade program, including design specifications for the components, system or facility to be maintained or upgraded

workplace forms and recording technology

relationships:

evidence of interactions with senior personnel and staff.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan operation and maintenance of a recirculating aquaculture system
  • Confirm operations, maintenance or design or upgrade specifications in the culture or holding system or facility with senior personnel
  • Draw up work plans or schedules, order materials and arrange labour and appropriate equipment according to specifications and in consultation with senior personnel
  • Check raw and prefabricated materials against delivery manifest or specifications
  • Prepare worksite according to specifications, and secure for safety or loss prevention
  • Assess potential risks, including environmental and water quality parameters for the cultured or held stock, and prepare contingency plans
  • Brief staff members on work objectives relevant to the site, equipment being used and type of maintenance or upgrade activities
  • Quantify costs and confirm budget with senior personnel
       
Element: Implement operations, maintenance or upgrade program
  • Implement work plan to minimise disruption to workplace operations and stress to cultured or held stock
  • Monitor progress of maintenance or upgrade program against the work plan, and adjust for unforeseen circumstances
  • Confirm availability of required materials, resource and supply provisions, and labour
  • Anticipate, avoid or minimise hazards and environmental implications and other potential problems through contingency planning
       
Element: Monitor operations, maintenance or upgrade activities
  • Monitor operations, maintenance or upgrade activities and component or system performances against maintenance or upgrade plan
  • Monitor costs within workplace budget requirements
  • Give feedback to staff members on work progress and performance
  • Prepare records or reports to management on project progress
  • Check and ensure that the maintained or upgraded system or facility fits maintenance or design specifications, is operable and complies with biosecurity regulatory requirements
  • Check budget for operations, maintenance or upgrade, and report major discrepancies to senior personnel
       
Element: Finalise and review operations, maintenance and upgrade activities
  • Supervise clean-up of work area, including repairs and storage of equipment
  • Record relevant operations, maintenance and upgrade data, observations or information, and check any abnormal records
  • Prepare required reports for senior personnel
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

An individual demonstrating competency must satisfy all of the elements and performance criteria in this unit.

There must be evidence that the individual has planned and implemented a program to operate, maintain or upgrade a recirculating aquaculture system on at least one occasion, including:

documenting a work plan for the operations, maintenance or upgrade of the system that includes contingency plans and resources and labour requirements

monitoring the operations, maintenance or upgrade for the system against work specifications and plan, ensuring it complies with biosecurity regulatory requirements

effectively communicating information about operations, maintenance or upgrades to the work team and senior personnel

maintaining accurate records and reports on progress and budget.

An individual must be able to demonstrate the knowledge required to perform the tasks outlined in the elements and performance criteria of this unit. This includes knowledge of:

relevant legislative requirements relating to recirculating aquaculture systems

approaches to coordinating operations

impacts of inputs on systems and component operation and on maximum operation loads

requirements for record-keeping, data collection and analysis

forward planning and risk management for events, such as blackouts, brownouts and equipment breakdowns

importance of optimised production to achieve sound economic outcomes

mechanical and technical aspects of recirculation systems, including energy use, mass balance, water hydraulics and flow, and pumps and pipe work

monitoring basic and advanced environmental and water quality parameters.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Confirm operations, maintenance or design or upgrade specifications in the culture or holding system or facility with senior personnel 
Draw up work plans or schedules, order materials and arrange labour and appropriate equipment according to specifications and in consultation with senior personnel 
Check raw and prefabricated materials against delivery manifest or specifications 
Prepare worksite according to specifications, and secure for safety or loss prevention 
Assess potential risks, including environmental and water quality parameters for the cultured or held stock, and prepare contingency plans 
Brief staff members on work objectives relevant to the site, equipment being used and type of maintenance or upgrade activities 
Quantify costs and confirm budget with senior personnel 
Implement work plan to minimise disruption to workplace operations and stress to cultured or held stock 
Monitor progress of maintenance or upgrade program against the work plan, and adjust for unforeseen circumstances 
Confirm availability of required materials, resource and supply provisions, and labour 
Anticipate, avoid or minimise hazards and environmental implications and other potential problems through contingency planning 
Monitor operations, maintenance or upgrade activities and component or system performances against maintenance or upgrade plan 
Monitor costs within workplace budget requirements 
Give feedback to staff members on work progress and performance 
Prepare records or reports to management on project progress 
Check and ensure that the maintained or upgraded system or facility fits maintenance or design specifications, is operable and complies with biosecurity regulatory requirements 
Check budget for operations, maintenance or upgrade, and report major discrepancies to senior personnel 
Supervise clean-up of work area, including repairs and storage of equipment 
Record relevant operations, maintenance and upgrade data, observations or information, and check any abnormal records 
Prepare required reports for senior personnel 

Forms

Assessment Cover Sheet

SFIAQU410 - Implement a program to operate, maintain or upgrade a recirculating aquaculture system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

SFIAQU410 - Implement a program to operate, maintain or upgrade a recirculating aquaculture system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: