Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

SFLDEC007 Mapping and Delivery Guide
Construct wired floristry products

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency SFLDEC007 - Construct wired floristry products
Description
Employability Skills
Learning Outcomes and Application This unit describes the performance outcomes, skills and knowledge required to construct a range of wired floristry products to pre-determined designs. This key construction function requires the ability to access and interpret job specifications, adapt as required, prepare for construction, select the correct components, and assemble, evaluate and present a range of floral arrangements.Products could be custom made in response to a customer brief or display or stock items made for general sale. They could be individual floristry products or part of a range of products for a special occasion.This unit applies to all floristry industry businesses including retail floristry shops, studio or online businesses. It applies to florists who work with some level of independence and under limited supervision and guidance from others.The florist constructing the product may or may not have designed it but will evaluate and modify the floral design during construction to resolve technical problems or make enhancements.No occupational licensing, certification or specific legislative requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Skills must be demonstrated in a floristry design, preparation and product construction environment. This can be:

an industry workplace

a simulated industry environment operated within a training organisation.

Assessment must ensure use of:

a commercial range of these floristry tools and equipment:

binding and floral tape

containers to mix cleaning products

cutting tools:

knives

rose de-thorners

scissors

secateurs

fine to heavy gauge wire

wire cutters

a diverse, commercial range of fresh flower and plant materials:

non-Australian species whether they are grown in Australia or overseas

Australian species

a diverse, commercial range of:

cleaning products

wrapping and packaging materials:

bows

boxes

cellophane

paper

polypropylene and decorative wraps

ribbons and decorative tying materials

detailed job specifications for the required range of wired floristry products

cleaning product Safety Data Sheets (SDS) or plain English workplace documents or diagrams that interpret SDS content

assessment activities that allow the individual to work with commercial speed, timing and productivity to construct floristry products within nominated deadlines.

Assessors must satisfy the Standards for Registered Training Organisation’s requirements for assessors, and:

hold a qualification or Statement of Attainment in Floristry which includes this unit of competency or equivalent; and

have worked as a florist in the industry for at least three years where they have applied this unit of competency or equivalent.

Prerequisites/co-requisites
Competency Field Design and Construction
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Interpret the design and job specifications.
  • Interpret job specifications and itemised job costing.
  • Discuss, with relevant personnel, design and construction requirements, including cost and production deadlines.
  • Read, view or discuss job specifications regularly during construction phase to comply with product requirements.
       
Element: Select flower, plant and presentation materials.
  • Recognise and select flower, plant and presentation materials according to job specifications and costing.
  • Sort items in preparation for construction.
  • Identify potential problems for meeting design requirements and adjust as required.
       
Element: Prepare to construct the floristry product.
  • Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.
  • Clean product construction area to avoid spoilage of flower and plant materials.
  • Check flower and plant materials have been correctly prepared and conditioned.
  • Recognise and report any spoilt materials and rectify according to level of individual responsibility.
  • Select tools, equipment and other construction components.
  • Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.
       
Element: Construct wired floral designs.
  • Select wired floristry techniques according to job specifications.
  • Produce wired floristry products considering and applying elements and principles of design.
  • Determine and use appropriate support methods.
  • Secure floral arrangement according to job specifications.
  • Evaluate and modify the floral design according to need, considering and applying elements and principles of design.
       
Element: Evaluate and present the wired floristry product.
  • Assess finished floristry product for compliance with job specifications, for technical and aesthetic quality and adjust as required.
  • Attach and secure presentation items to floral product.
  • Select and use wrapping and packaging materials according to job specifications, adjust to enhance presentation and to ensure safe transportation, as required.
  • Consider and apply elements and principles of design when wrapping, packing and varying presentation of the wired floristry product.
  • Dispose of hazardous and other waste safely to minimise negative environmental impacts.
  • Evaluate presentation of finished wired floristry product before displaying, despatching or providing to the customer.
  • Prepare basic reports to justify variations to original design and to inform future improvements.
       
Element: Interpret the design and job specifications.
  • Interpret job specifications and itemised job costing.
  • Discuss, with relevant personnel, design and construction requirements, including cost and production deadlines.
  • Read, view or discuss job specifications regularly during construction phase to comply with product requirements.
       
Element: Select flower, plant and presentation materials.
  • Recognise and select flower, plant and presentation materials according to job specifications and costing.
  • Sort items in preparation for construction.
  • Identify potential problems for meeting design requirements and adjust as required.
       
Element: Prepare to construct the floristry product.
  • Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.
  • Clean product construction area to avoid spoilage of flower and plant materials.
  • Check flower and plant materials have been correctly prepared and conditioned.
  • Recognise and report any spoilt materials and rectify according to level of individual responsibility.
  • Select tools, equipment and other construction components.
  • Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.
       
Element: Construct wired floral designs.
  • Select wired floristry techniques according to job specifications.
  • Produce wired floristry products considering and applying elements and principles of design.
  • Determine and use appropriate support methods.
  • Secure floral arrangement according to job specifications.
  • Evaluate and modify the floral design according to need, considering and applying elements and principles of design.
       
Element: Evaluate and present the wired floristry product.
  • Assess finished floristry product for compliance with job specifications, for technical and aesthetic quality and adjust as required.
  • Attach and secure presentation items to floral product.
  • Select and use wrapping and packaging materials according to job specifications, adjust to enhance presentation and to ensure safe transportation, as required.
  • Consider and apply elements and principles of design when wrapping, packing and varying presentation of the wired floristry product.
  • Dispose of hazardous and other waste safely to minimise negative environmental impacts.
  • Evaluate presentation of finished wired floristry product before displaying, despatching or providing to the customer.
  • Prepare basic reports to justify variations to original design and to inform future improvements.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Interpret the design and job specifications.

1.1 Interpret job specifications and itemised job costing.

1.2 Discuss, with relevant personnel, design and construction requirements, including cost and production deadlines.

1.3 Read, view or discuss job specifications regularly during construction phase to comply with product requirements.

2. Select flower, plant and presentation materials.

2.1 Recognise and select flower, plant and presentation materials according to job specifications and costing.

2.2 Sort items in preparation for construction.

2.3 Identify potential problems for meeting design requirements and adjust as required.

3. Prepare to construct the floristry product.

3.1 Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.

3.2 Clean product construction area to avoid spoilage of flower and plant materials.

3.3 Check flower and plant materials have been correctly prepared and conditioned.

3.4 Recognise and report any spoilt materials and rectify according to level of individual responsibility.

3.5 Select tools, equipment and other construction components.

3.6 Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.

4. Construct wired floral designs.

4.1 Select wired floristry techniques according to job specifications.

4.2 Produce wired floristry products considering and applying elements and principles of design.

4.3 Determine and use appropriate support methods.

4.4 Secure floral arrangement according to job specifications.

4.5 Evaluate and modify the floral design according to need, considering and applying elements and principles of design.

5. Evaluate and present the wired floristry product.

5.1 Assess finished floristry product for compliance with job specifications, for technical and aesthetic quality and adjust as required.

5.2 Attach and secure presentation items to floral product.

5.3 Select and use wrapping and packaging materials according to job specifications, adjust to enhance presentation and to ensure safe transportation, as required.

5.4 Consider and apply elements and principles of design when wrapping, packing and varying presentation of the wired floristry product.

5.5 Dispose of hazardous and other waste safely to minimise negative environmental impacts.

5.6 Evaluate presentation of finished wired floristry product before displaying, despatching or providing to the customer.

5.7 Prepare basic reports to justify variations to original design and to inform future improvements.

Evidence of the ability to complete tasks outlined in elements and performance criteria of this unit in the context of the job role, and:

correctly interpret designs and follow job specifications to construct each of these wired floristry products which must be of consistent quality and varying sizes:

button hole

corsage

posy

trail

shower

shoulder spray

wrist spray

circlet

head piece

cake decoration

construct wired floristry products using these techniques across the above suite of products:

support wiring for flower and plant materials with a stem

wiring for flower and plant materials without a stem

stitching

pinning

specialised wiring

cross wiring

use fresh flower and plant materials across the above suite of products:

non-Australian species whether they are grown in Australia or overseas

Australian species.

Demonstrated knowledge required to complete the tasks outlined in elements and performance criteria of this unit:

key characteristics of elements and principles of design, their key interrelationships and use in wired floristry products:

elements of design:

texture

form

colour

space

line

principles of design:

harmony

rhythm

balance

dominance

scale

proportion

contrast

essential features and use of these design guidelines or forms and categories for wired floristry products:

decorative

vegetative

formal-linear

radial

parallel

essential features and use of these construction techniques for wired floristry products:

wiring techniques:

support wiring for flower and plant materials with a stem

wiring for flower and plant materials without a stem

stitching

pinning

specialised wiring

cross wiring

techniques for:

wrapping for enhancement

packaging and protecting flower and plant materials

essential features and use of a wide variety of fresh and dry flower and plant materials:

non-Australian species whether they are grown in Australia or overseas

Australian species

features of spoilt and unsuitable flower and plant materials

complementary nature of flower and plant materials to modify design during construction

handling techniques to avoid spoilage of flower, plant and presentation materials

essential features and use of a wide variety of presentation materials used to enhance wired floristry products

types and correct use of personal protection equipment for constructing floristry products

safe handling techniques for:

toxic flower and plant materials

flower and plant materials treated with toxic fungicides and pesticides

cleaning products

floristry tools

cleaning techniques and uses of cleaning products for floristry construction areas

cleaning products:

role, use and basic content of Safety Data Sheets (SDS) or plain English workplace documents or diagrams that interpret SDS content

safe practices for storing

environmentally sound disposal methods for hazardous waste

potential environmental impacts of constructing wired floristry products and practices for:

reducing water and energy use

reducing wastage of floristry raw materials

environmentally sound disposal methods for these types of floristry construction waste:

wrapping and packaging materials

recyclable materials

spoiled and diseased flower and plant materials

flower and plant materials that have a propensity to propagate weeds.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Interpret the design and job specifications.

1.1 Interpret job specifications and itemised job costing.

1.2 Discuss, with relevant personnel, design and construction requirements, including cost and production deadlines.

1.3 Read, view or discuss job specifications regularly during construction phase to comply with product requirements.

2. Select flower, plant and presentation materials.

2.1 Recognise and select flower, plant and presentation materials according to job specifications and costing.

2.2 Sort items in preparation for construction.

2.3 Identify potential problems for meeting design requirements and adjust as required.

3. Prepare to construct the floristry product.

3.1 Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury.

3.2 Clean product construction area to avoid spoilage of flower and plant materials.

3.3 Check flower and plant materials have been correctly prepared and conditioned.

3.4 Recognise and report any spoilt materials and rectify according to level of individual responsibility.

3.5 Select tools, equipment and other construction components.

3.6 Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts.

4. Construct wired floral designs.

4.1 Select wired floristry techniques according to job specifications.

4.2 Produce wired floristry products considering and applying elements and principles of design.

4.3 Determine and use appropriate support methods.

4.4 Secure floral arrangement according to job specifications.

4.5 Evaluate and modify the floral design according to need, considering and applying elements and principles of design.

5. Evaluate and present the wired floristry product.

5.1 Assess finished floristry product for compliance with job specifications, for technical and aesthetic quality and adjust as required.

5.2 Attach and secure presentation items to floral product.

5.3 Select and use wrapping and packaging materials according to job specifications, adjust to enhance presentation and to ensure safe transportation, as required.

5.4 Consider and apply elements and principles of design when wrapping, packing and varying presentation of the wired floristry product.

5.5 Dispose of hazardous and other waste safely to minimise negative environmental impacts.

5.6 Evaluate presentation of finished wired floristry product before displaying, despatching or providing to the customer.

5.7 Prepare basic reports to justify variations to original design and to inform future improvements.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Interpret job specifications and itemised job costing. 
Discuss, with relevant personnel, design and construction requirements, including cost and production deadlines. 
Read, view or discuss job specifications regularly during construction phase to comply with product requirements. 
Recognise and select flower, plant and presentation materials according to job specifications and costing. 
Sort items in preparation for construction. 
Identify potential problems for meeting design requirements and adjust as required. 
Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury. 
Clean product construction area to avoid spoilage of flower and plant materials. 
Check flower and plant materials have been correctly prepared and conditioned. 
Recognise and report any spoilt materials and rectify according to level of individual responsibility. 
Select tools, equipment and other construction components. 
Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts. 
Select wired floristry techniques according to job specifications. 
Produce wired floristry products considering and applying elements and principles of design. 
Determine and use appropriate support methods. 
Secure floral arrangement according to job specifications. 
Evaluate and modify the floral design according to need, considering and applying elements and principles of design. 
Assess finished floristry product for compliance with job specifications, for technical and aesthetic quality and adjust as required. 
Attach and secure presentation items to floral product. 
Select and use wrapping and packaging materials according to job specifications, adjust to enhance presentation and to ensure safe transportation, as required. 
Consider and apply elements and principles of design when wrapping, packing and varying presentation of the wired floristry product. 
Dispose of hazardous and other waste safely to minimise negative environmental impacts. 
Evaluate presentation of finished wired floristry product before displaying, despatching or providing to the customer. 
Prepare basic reports to justify variations to original design and to inform future improvements. 
Interpret job specifications and itemised job costing. 
Discuss, with relevant personnel, design and construction requirements, including cost and production deadlines. 
Read, view or discuss job specifications regularly during construction phase to comply with product requirements. 
Recognise and select flower, plant and presentation materials according to job specifications and costing. 
Sort items in preparation for construction. 
Identify potential problems for meeting design requirements and adjust as required. 
Use floristry tools, equipment and hazardous substances safely and use personal protective equipment to avoid injury. 
Clean product construction area to avoid spoilage of flower and plant materials. 
Check flower and plant materials have been correctly prepared and conditioned. 
Recognise and report any spoilt materials and rectify according to level of individual responsibility. 
Select tools, equipment and other construction components. 
Use energy and water resources efficiently during preparation and construction to reduce negative environmental impacts. 
Select wired floristry techniques according to job specifications. 
Produce wired floristry products considering and applying elements and principles of design. 
Determine and use appropriate support methods. 
Secure floral arrangement according to job specifications. 
Evaluate and modify the floral design according to need, considering and applying elements and principles of design. 
Assess finished floristry product for compliance with job specifications, for technical and aesthetic quality and adjust as required. 
Attach and secure presentation items to floral product. 
Select and use wrapping and packaging materials according to job specifications, adjust to enhance presentation and to ensure safe transportation, as required. 
Consider and apply elements and principles of design when wrapping, packing and varying presentation of the wired floristry product. 
Dispose of hazardous and other waste safely to minimise negative environmental impacts. 
Evaluate presentation of finished wired floristry product before displaying, despatching or providing to the customer. 
Prepare basic reports to justify variations to original design and to inform future improvements. 

Forms

Assessment Cover Sheet

SFLDEC007 - Construct wired floristry products
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

SFLDEC007 - Construct wired floristry products

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: