Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

SISCAQU005 Mapping and Delivery Guide
Develop and implement aquatic facility maintenance procedures

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency SISCAQU005 - Develop and implement aquatic facility maintenance procedures
Description
Employability Skills
Learning Outcomes and Application This unit describes the performance outcomes, skills and knowledge required to develop, implement and evaluate maintenance schedules for an aquatic recreation facility.This unit applies to those working autonomously at aquatic leisure centres or community pools in roles such as program coordinators, swim school coordinators, recreation coordinators or duty managers. Work is performed according to relevant legislation, organisational policies and procedures.No occupational licensing, certification or specific legislative requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Skills must be demonstrated in:

a workplace or simulated aquatic facility or environment.

Assessment must ensure use of:

equipment and plant for which the candidate plans maintenance procedures

organisational policies, procedures and budget

equipment operating and maintenance instructions

resources to maintain facility and equipment.

Assessment activities that allow the individual to:

implement and monitor maintenance activity over time.

Assessors must satisfy the Standards for Registered Training Organisations’ requirements for assessors.

Prerequisites/co-requisites
Competency Field Aquatics
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan maintenance procedures.
  • Evaluate operational maintenance needs according to regulatory and business requirements.
  • Document uses and condition of the aquatic facility plant and equipment and identify priorities for action.
  • Identify potential sources of increased efficiency of the aquatic facility plant and equipment.
  • Identify human, physical and financial resources associated with needed maintenance of aquatic facility.
  • Integrate maintenance program with asset acquisition and disposal plans.
  • Schedule maintenance activities to minimise disruption to facility users and ensure that supplies are available.
  • Confirm, document and communicate maintenance procedures and costs according to organisational approval protocols.
       
Element: Implement maintenance procedures.
  • Monitor completion of inspection and maintenance schedules.
  • Identify and assess failed or unsafe aquatic facility plant and equipment and determine underlying cause within scope of own role.
  • Identify and evaluate emergency situations and respond according to local regulatory and organisational procedures.
  • Remove defective equipment and/or facilities from operation and complete repairs within designated responsibility.
  • Arrange for required repairs to be carried out by qualified and/or licensed contractors and record actions taken.
  • Monitor maintenance records and take corrective action as required.
  • Communicate maintenance actions to appropriate staff or personnel.
       
Element: Evaluate maintenance procedures.
  • Assess the effectiveness of maintenance systems against short and long-term maintenance requirements.
  • Identify and use alternative maintenance methods to maintain cost effectiveness.
  • Document and communicate improvements and changes to maintenance systems.
       
Element: Plan maintenance procedures.
  • Evaluate operational maintenance needs according to regulatory and business requirements.
  • Document uses and condition of the aquatic facility plant and equipment and identify priorities for action.
  • Identify potential sources of increased efficiency of the aquatic facility plant and equipment.
  • Identify human, physical and financial resources associated with needed maintenance of aquatic facility.
  • Integrate maintenance program with asset acquisition and disposal plans.
  • Schedule maintenance activities to minimise disruption to facility users and ensure that supplies are available.
  • Confirm, document and communicate maintenance procedures and costs according to organisational approval protocols.
       
Element: Implement maintenance procedures.
  • Monitor completion of inspection and maintenance schedules.
  • Identify and assess failed or unsafe aquatic facility plant and equipment and determine underlying cause within scope of own role.
  • Identify and evaluate emergency situations and respond according to local regulatory and organisational procedures.
  • Remove defective equipment and/or facilities from operation and complete repairs within designated responsibility.
  • Arrange for required repairs to be carried out by qualified and/or licensed contractors and record actions taken.
  • Monitor maintenance records and take corrective action as required.
  • Communicate maintenance actions to appropriate staff or personnel.
       
Element: Evaluate maintenance procedures.
  • Assess the effectiveness of maintenance systems against short and long-term maintenance requirements.
  • Identify and use alternative maintenance methods to maintain cost effectiveness.
  • Document and communicate improvements and changes to maintenance systems.
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan maintenance procedures.

1.1 Evaluate operational maintenance needs according to regulatory and business requirements.

1.2 Document uses and condition of the aquatic facility plant and equipment and identify priorities for action.

1.3 Identify potential sources of increased efficiency of the aquatic facility plant and equipment.

1.4 Identify human, physical and financial resources associated with needed maintenance of aquatic facility.

1.5 Integrate maintenance program with asset acquisition and disposal plans.

1.6 Schedule maintenance activities to minimise disruption to facility users and ensure that supplies are available.

1.7 Confirm, document and communicate maintenance procedures and costs according to organisational approval protocols.

2. Implement maintenance procedures.

2.1 Monitor completion of inspection and maintenance schedules.

2.2 Identify and assess failed or unsafe aquatic facility plant and equipment and determine underlying cause within scope of own role.

2.3 Identify and evaluate emergency situations and respond according to local regulatory and organisational procedures.

2.4 Remove defective equipment and/or facilities from operation and complete repairs within designated responsibility.

2.5 Arrange for required repairs to be carried out by qualified and/or licensed contractors and record actions taken.

2.6 Monitor maintenance records and take corrective action as required.

2.7 Communicate maintenance actions to appropriate staff or personnel.

3. Evaluate maintenance procedures.

3.1 Assess the effectiveness of maintenance systems against short and long-term maintenance requirements.

3.2 Identify and use alternative maintenance methods to maintain cost effectiveness.

3.3 Document and communicate improvements and changes to maintenance systems.

Evidence of the ability to complete tasks outlined in elements and performance criteria of this unit in the context of the job role, and:

develop and document maintenance procedures for at least one aquatic facility, incorporating consideration of:

circulation plant

heating systems

lighting or ventilation systems

disinfection systems

required supplies

servicing and repair

equipment replacement/redundancy

implement and evaluate maintenance procedures for at least one aquatic facility.

Demonstrated knowledge required to complete the tasks outlined in elements and performance criteria of this unit:

legislation and industry standards relevant to aquatic facility maintenance:

work health and safety/occupational health and safety

dangerous goods act and regulations

local government regulations

building codes and regulations

organisational policies and procedures:

standard operating conditions and levels

work health and safety/occupational health and safety

risk assessment and control

handling of hazardous chemicals

emergency evacuation

factors affecting the operating cost of an aquatic facility:

faulty operation

cleaning requirements

consumables

replacements (whole or part)

servicing and repair

utility costs

staff costs

contractor costs

plant and equipment manufacturer specifications in relation to operation, servicing and repair of:

circulation plant

heating systems

lighting and ventilation systems

disinfection systems

supplies

emergency situations that can occur with plant and equipment, and how to respond

project management techniques:

planning and scheduling

consultation and communication

evaluation.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan maintenance procedures.

1.1 Evaluate operational maintenance needs according to regulatory and business requirements.

1.2 Document uses and condition of the aquatic facility plant and equipment and identify priorities for action.

1.3 Identify potential sources of increased efficiency of the aquatic facility plant and equipment.

1.4 Identify human, physical and financial resources associated with needed maintenance of aquatic facility.

1.5 Integrate maintenance program with asset acquisition and disposal plans.

1.6 Schedule maintenance activities to minimise disruption to facility users and ensure that supplies are available.

1.7 Confirm, document and communicate maintenance procedures and costs according to organisational approval protocols.

2. Implement maintenance procedures.

2.1 Monitor completion of inspection and maintenance schedules.

2.2 Identify and assess failed or unsafe aquatic facility plant and equipment and determine underlying cause within scope of own role.

2.3 Identify and evaluate emergency situations and respond according to local regulatory and organisational procedures.

2.4 Remove defective equipment and/or facilities from operation and complete repairs within designated responsibility.

2.5 Arrange for required repairs to be carried out by qualified and/or licensed contractors and record actions taken.

2.6 Monitor maintenance records and take corrective action as required.

2.7 Communicate maintenance actions to appropriate staff or personnel.

3. Evaluate maintenance procedures.

3.1 Assess the effectiveness of maintenance systems against short and long-term maintenance requirements.

3.2 Identify and use alternative maintenance methods to maintain cost effectiveness.

3.3 Document and communicate improvements and changes to maintenance systems.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Evaluate operational maintenance needs according to regulatory and business requirements. 
Document uses and condition of the aquatic facility plant and equipment and identify priorities for action. 
Identify potential sources of increased efficiency of the aquatic facility plant and equipment. 
Identify human, physical and financial resources associated with needed maintenance of aquatic facility. 
Integrate maintenance program with asset acquisition and disposal plans. 
Schedule maintenance activities to minimise disruption to facility users and ensure that supplies are available. 
Confirm, document and communicate maintenance procedures and costs according to organisational approval protocols. 
Monitor completion of inspection and maintenance schedules. 
Identify and assess failed or unsafe aquatic facility plant and equipment and determine underlying cause within scope of own role. 
Identify and evaluate emergency situations and respond according to local regulatory and organisational procedures. 
Remove defective equipment and/or facilities from operation and complete repairs within designated responsibility. 
Arrange for required repairs to be carried out by qualified and/or licensed contractors and record actions taken. 
Monitor maintenance records and take corrective action as required. 
Communicate maintenance actions to appropriate staff or personnel. 
Assess the effectiveness of maintenance systems against short and long-term maintenance requirements. 
Identify and use alternative maintenance methods to maintain cost effectiveness. 
Document and communicate improvements and changes to maintenance systems. 
Evaluate operational maintenance needs according to regulatory and business requirements. 
Document uses and condition of the aquatic facility plant and equipment and identify priorities for action. 
Identify potential sources of increased efficiency of the aquatic facility plant and equipment. 
Identify human, physical and financial resources associated with needed maintenance of aquatic facility. 
Integrate maintenance program with asset acquisition and disposal plans. 
Schedule maintenance activities to minimise disruption to facility users and ensure that supplies are available. 
Confirm, document and communicate maintenance procedures and costs according to organisational approval protocols. 
Monitor completion of inspection and maintenance schedules. 
Identify and assess failed or unsafe aquatic facility plant and equipment and determine underlying cause within scope of own role. 
Identify and evaluate emergency situations and respond according to local regulatory and organisational procedures. 
Remove defective equipment and/or facilities from operation and complete repairs within designated responsibility. 
Arrange for required repairs to be carried out by qualified and/or licensed contractors and record actions taken. 
Monitor maintenance records and take corrective action as required. 
Communicate maintenance actions to appropriate staff or personnel. 
Assess the effectiveness of maintenance systems against short and long-term maintenance requirements. 
Identify and use alternative maintenance methods to maintain cost effectiveness. 
Document and communicate improvements and changes to maintenance systems. 

Forms

Assessment Cover Sheet

SISCAQU005 - Develop and implement aquatic facility maintenance procedures
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

SISCAQU005 - Develop and implement aquatic facility maintenance procedures

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: