Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TDMMR3407B Mapping and Delivery Guide
OPERATE DECK MACHINERY

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency TDMMR3407B - OPERATE DECK MACHINERY
Description UNIT DESCRIPTOR:This unit involves the skills and knowledge required of an Integrated Rating to operate deck machinery installed on a commercial vessel, including anchoring equipment, mooring equipment, cargo hatch covers, cranes and derricks, lifeboat davits, gangways and pilot ladders, ventilators and breathers, and fairleads and rollers.
Employability Skills Not applicable.
Learning Outcomes and Application The unit has application in the qualification for an Integrated Rating, i.e. Certificate III in Transport&Distribution(Maritime Operations - Integrated Rating).
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not applicable.
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Operate deck machinery
  • Pre-operational checks of deck machinery and associated systems are carried out in accordance with safety requirements and shipboard practices
  • Operation of deck machinery is performed in accordance with manufacturer's specifications and instructions and safety requirements
  • Any operational problems encountered in the use of deck machinery on the vessel are reported and/or rectified in accordance with procedures
  • Malfunctioning equipment is identified and the nature of the fault is investigated and the outcomes reported in accordance with procedures
  • Post-operational checks of deck machinery and associated systems are carried out in accordance with safety requirements and shipboard practices
  • Records of equipment status and identified defects and malfunctions are completed in accordance with procedures
       
Element: Carry out routine planned maintenance of deck machinery
  • Maintenance arrangements for deck machinery on the vessel are carried out in accordance with survey requirements and manufacturer's specifications
  • Operational problems or faults with the vessel's deck machinery are identified and the causes identified
  • Any restrictions to operations arising from identified malfunctions of the deck machinery are justified and reported as required
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

TDMMR3401B OPERATE DECK MACHINERY

The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, , the Range Statement and the Assessment Guidelines for this Training Package.

1

Critical aspects of evidence required to demonstrate competency in this unit:

Assessment must confirm appropriate knowledge and skills to:

a

Use and carry out planned routine maintenance of deck machinery

b

Identify typical problems related to the deck machinery operation and maintenance and take appropriate action in conjunction with other vessel personnel

c

Ensure the exercise of all required safety, environmental and hazard control precautions and procedures during deck machinery operation and maintenance

d

Communicate effectively with others during the operation and maintenance of deck machinery

2

Evidence required for demonstration of consistent performance

a

Performance is demonstrated consistently over a period of time and in a suitable range of contexts

b

Consistently applies underpinning knowledge and skills when:

1

using and carrying out planned routine maintenance of deck machinery

2

identifying and operational and maintenance problems and determining appropriate courses of action

3

ensuring the application of safety precautions relevant to use and maintenance of deck machinery

c

Shows evidence of application of relevant workplace procedures, including:

1

relevant sections of maritime regulations

2

ISM Safety Management Code procedures

3

OH&S regulations, pollution control and hazard prevention policies and procedures

4

job procedures and work instructions

5

relevant deck machinery manufacturer's guidelines relating to operation routine maintenance procedures

6

environmental protection procedures when carrying out maintenance operations

d

Action is taken promptly to report and/or rectify defective or malfunctioning deck machinery, equipment and components in accordance with manufacturer's instructions and established procedures

e

Work is completed systematically with required attention to detail

f

Recognises and adapts appropriately to cultural differences in the workplace, including modes of behaviour and interactions between crew and others

(continued)

TDMMR3407B OPERATE DECK MACHINERY

3

Context of assessment

a

Assessment of competency must comply with the assessment requirements of the relevant maritime regulations

b

Assessment of this unit must be undertaken within relevant marine authority approved and audited arrangements by a registered training organisation:

1

As a minimum, assessment of knowledge must be conducted through appropriate written/oral examinations, and

2

Appropriate practical assessment must occur:

i

at the registered training organisation; and/or

ii

on an appropriate working or training vessel

4

Specificresourcesrequired for assessment

Access is required to opportunities to:

a

participate in a range of exercises, case studies and other simulated practical and knowledge assessments that demonstrate the skills and knowledge to use and carry out planned routine maintenance of deck machinery on a vessel; and/or

b

use and carry out planned routine maintenance of deck machinery on an operational commercial or training vessel


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

REQUIRED KNOWLEDGE

This describes the knowledge required for this unit

1

Applicable sections of the relevant maritime regulations

2

Relevant OH&S and pollution control legislation and codes of practice

3

Principal design, safety features and component parts of deck machinery

4

Procedures for operating and carrying out planned maintenance of deck machinery

5

Procedures for isolating defective deck machinery or components

6

Repair and/or replacement procedures for deck machinery and components

7

Principles and procedures of machinery lubrication as they relate to deck machinery on a vessel, including:

a

application of grease

b

changing of gearbox lubricating oil

c

lubrication of a steel wire rope

d

applications and use of 'denso' tape

e

changing of lubricating and hydraulic oil

8

Procedures for the replacement of flexible hoses in deck machinery

9

Procedures for using hand and power tools for typical maintenance operations on deck machinery

10

Maintenance and repair hazards and problems and appropriate preventative and remedial action and solutions

11

Safety, environmental and hazard control precautions and procedures relevant to the operation and maintenance of deck machinery

12

Safe procedures for handling heavy machinery and component parts during maintenance of deck machinery

13

Purpose and content of material safety data sheets

14

Maritime communication techniques needed during the use and maintenance of deck machinery on a vessel

15

Maintenance records that must be maintained on a commercial vessel

REQUIRED SKILLS

This describes the basic skills required for this unit.

1

Use basic verbal and other forms of communication skills required during the operation of deck machinery

2

Read, interpret and apply manuals and standard operating procedures related to the operation and servicing of deck machinery

3

Complete any required records related to the operation of deck machinery on a vessel

4

Work safely and collaboratively with others during the operation of deck machinery on a vessel

5

Select and use relevant tools and equipment as per instructions

6

Recognise faulty equipment and take appropriate action as per operating instructions

7

Recognise routine problems and hazards while operating deck machinery and take appropriate action

8

Adapt to differences in vessels, equipment and standard operating procedures

9

Follow required work schedule as per company requirements

TDMMR3407B OPERATE DECK MACHINERY

The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.

VARIABLE

SCOPE

1. GENERAL CONTEXT

a.

Work must be carried out:

1

in compliance with the relevant regulatory requirements for the operation and maintenance of deck machinery

b.

Work is performed:

1

within established operational requirements, with responsibility for own outputs in relation to specified quality standards and limited responsibility for within a team in achieving the specified quality and quantity of outcomes

c.

Work involves:

1

the operation and planned routine maintenance of deck machinery on a vessel

2. WORKSITE ENVIRONMENT

a

Vessel may include:

1

any Australian or international commercial vessel

b

Operation and maintenance of the deck machinery may be carried out:

1

by day or night

2

while underway

3

during berthing and unberthing operations

4

while anchoring or mooring

5

while in port

6

while moored or at anchor

c

Maintenance may include:

1

planned maintenance systems

2

operational checks

3

recording

4

reporting

5

isolation

6

cleanliness

(continued)

TDMMR3407B OPERATE DECK MACHINERY

VARIABLE

SCOPE

c

Maintenance may include:

(continued)

7

use of correct tools, parts, and lubricants

8

worksite preparation

d

Deck machinery may include:

1

anchoring windlasses

2

mooring equipment

3

cargo hatch covers

4

cranes and derricks

5

lifeboat davits

6

gangways and pilot ladders

7

ventilators and breathers

8

fairleads and rollers

e

Hydraulic Components of deck machinery may include:

1

pump

2

reservoir

3

rams

4

motors

5

filters

6

coolers

7

valves,

8

control valves and relief valves

9

pipes and hoses

f

Maintenance tools and equipment may include:

1

hand and power tools

2

greasing and lubrication tools

3

protective clothing and equipment, including:

i

eye and ear protection

ii

safety boots and helmet

iii

dust and fume masks

TDMMR3407B OPERATE DECK MACHINERY

VARIABLE

SCOPE

g

Hazards when operating and maintaining deck machinery may include:

1

rotating and moving parts

2

high pressure systems

3

slippery deck

4

sharp tools and implements

5

power tools

6

electrical circuits

7

cleaning chemicals

8

oil

9

pollution

10

heat

11

cables and ropes

12

faulty machinery equipment handling equipment and lifting gear

13

using equipment beyond safe working limits

14

poor housekeeping procedures

15

non-compliance with safe working procedures

h

Documentation and recordsmay include:

1

ISM Code safety management system plans, procedures, checklists and instructions

2

planned maintenance system

3

OH&S regulations and policy

4

maintenance records

5

deck machinery manufacturer's instructions, specifications and recommended procedures

6

relevant Australian standards

i

Applicable legislation, regulations and codes may include:

1

sections of the IMO STCW 95 Convention and Code and AMSA Marine Orders related to deck operations and maintenance

2

relevant Commonwealth, State and Territory OH&S and pollution control legislation

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Pre-operational checks of deck machinery and associated systems are carried out in accordance with safety requirements and shipboard practices 
Operation of deck machinery is performed in accordance with manufacturer's specifications and instructions and safety requirements 
Any operational problems encountered in the use of deck machinery on the vessel are reported and/or rectified in accordance with procedures 
Malfunctioning equipment is identified and the nature of the fault is investigated and the outcomes reported in accordance with procedures 
Post-operational checks of deck machinery and associated systems are carried out in accordance with safety requirements and shipboard practices 
Records of equipment status and identified defects and malfunctions are completed in accordance with procedures 
Maintenance arrangements for deck machinery on the vessel are carried out in accordance with survey requirements and manufacturer's specifications 
Operational problems or faults with the vessel's deck machinery are identified and the causes identified 
Any restrictions to operations arising from identified malfunctions of the deck machinery are justified and reported as required 

Forms

Assessment Cover Sheet

TDMMR3407B - OPERATE DECK MACHINERY
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TDMMR3407B - OPERATE DECK MACHINERY

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: