Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
TLIB1030 Mapping and Delivery Guide
Undertake general site maintenance
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | TLIB1030 - Undertake general site maintenance |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | This unit involves the skills and knowledge required to undertake general site housekeeping and maintenance in depots, sub-depots, factories, compounds and campsites according to safeworking and regulatory requirements and workplace procedures. It includes preparing for work, conducting site housekeeping functions, applying pest and vegetation control measures, and completing all work requirements.Work is performed under minimal supervision, generally within a team environment. No licensing, legislative or certification requirements apply to this unit at the time of publication. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. As a minimum, assessors must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations, current at the time of assessment. As a minimum, assessment must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations, current at the time of assessment. Assessment must occur in workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated workplace operational situations that replicate workplace conditions. Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate. Resources for assessment include: a range of relevant exercises, case studies and/or other simulations relevant and appropriate materials, tools, equipment and personal protective equipment currently used in industry applicable documentation including workplace procedures, regulations, codes of practice and operation manuals. |
||
Prerequisites/co-requisites | |||
Competency Field | B ‒ Equipment Checking and Maintenance |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for work | ||||||||
Element: Works order including drawings, sketches and material lists is received/accessed, analysed and confirmed as required by site inspection | ||||||||
Element: Resources, including equipment and materials, are identified and obtained | ||||||||
Element: Liaison and communication issues with other personnel at the site are resolved | ||||||||
Element: Hazards are identified prior to commencing work | ||||||||
Element: Site safety requirements are observed | ||||||||
Element: Conduct site housekeeping functions | ||||||||
Element: Stores, materials and equipment are loaded/off-loaded safely and secured | ||||||||
Element: Site, including stores and materials, is laid out to plan | ||||||||
Element: Stores and materials are checked for serviceability, cleaned as required and prepared for use | ||||||||
Element: Minor earthwork maintenance is conducted | ||||||||
Element: Excess materials and refuse are disposed of/returned, as required by workplace procedures | ||||||||
Element: Apply pest and vegetation control measures | ||||||||
Element: Pest and vegetation control requirements are identified and appropriate control measure is selected in accordance with workplace procedures | ||||||||
Element: Chemical control agents are prepared in accordance with safety requirements and workplace procedures | ||||||||
Element: Pest control measures are applied, monitored and varied to maintain effectiveness | ||||||||
Element: Control measures are applied, and pests and vegetation are removed/neutralised | ||||||||
Element: Complete work | ||||||||
Element: Worksite is rehabilitated | ||||||||
Element: Work completion details are finalised and recorded/advised to appropriate personnel |