Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TLIB2097 Mapping and Delivery Guide
Install and maintain guard rails

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency TLIB2097 - Install and maintain guard rails
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to install and maintain guard rails in accordance with safeworking and regulatory requirements, and workplace procedures.It includes determining job requirements, installing guard rails and completing all required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Guard rails include guard rails installed on:level crossings and sharp curves to prevent derailmentunderbridges and near vulnerable structures to limit lateral movement of derailed wagons.Work is performed under minimal supervision, generally within a team environment. It involves the application of routine operational principles and procedures when installing and maintaining guard rails, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

As a minimum, assessors must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

As a minimum, assessment must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in workplace operational situations or, where this is not available, in simulated workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment include:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, equipment and personal protective equipment currently used in industry

applicable documentation including workplace procedures, regulations, rail industry standards, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field B – Equipment Checking and Maintenance
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine job requirements
       
Element: Worksite is identified
       
Element: Hazards are identified, risks are assessed and control measures are implemented
       
Element: Obstructions are cleared from gangways/flangeways to ensure safe passage of trains
       
Element: Installation, replacement or repair method is selected in accordance with work requirements, rail industry standards and workplace procedures
       
Element: Plant, equipment and materials are prepared for work
       
Element: Install guard rail
       
Element: Existing rail is removed, as required, to enable fitting of new rail
       
Element: New or replacement guard rail is installed to required standards using suitable equipment and fastening system to restore functionality of guard rail
       
Element: Final job is checked for compliance to required standards to enable services to be restored safely
       
Element: Complete documentation
       
Element: Required documentation procedures and processes are confirmed
       
Element: Documentation is filled in legibly and proofread
       
Element: Documentation is processed in accordance with workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Worksite is identified

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Obstructions are cleared from gangways/flangeways to ensure safe passage of trains

1.4

Installation, replacement or repair method is selected in accordance with work requirements, rail industry standards and workplace procedures

1.5

Plant, equipment and materials are prepared for work

2

Install guard rail

2.1

Existing rail is removed, as required, to enable fitting of new rail

2.2

New or replacement guard rail is installed to required standards using suitable equipment and fastening system to restore functionality of guard rail

2.3

Final job is checked for compliance to required standards to enable services to be restored safely

3

Complete documentation

3.1

Required documentation procedures and processes are confirmed

3.2

Documentation is filled in legibly and proofread

3.3

Documentation is processed in accordance with workplace procedures

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant workplace procedures

ensuring completed work meets track geometry requirements

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

implementing contingency plans

installing and maintaining guard rails on underbridges, level crossings in open track in accordance with workplace requirements

interpreting and following operational instructions

modifying activities depending on operational contingencies, risk situations and environments

reading and interpreting relevant instructions, procedures, information and signs

reporting and/or rectifying identified problems, faults or malfunctions, in accordance with rail industry standards, regulatory requirements and workplace procedures

selecting appropriate material for guard rails

working systematically with required attention to detail without injury to self or others, or damage to materials or equipment.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

guard rail installation and maintenance techniques and processes

hazards that may exist when carrying out the installation and maintenance of guard rails, and ways of controlling the risks involved

principles of guard rail function

problems that may occur when installing and maintaining guard rails, and action that can be taken to report or resolve these problems

rail industry standards applicable to guard rails

relevant rail industry standard

relevant safety, work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

relevant technical manuals and instructions

workplace procedures for installing and maintaining guard rails.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine job requirements

1.1

Worksite is identified

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Obstructions are cleared from gangways/flangeways to ensure safe passage of trains

1.4

Installation, replacement or repair method is selected in accordance with work requirements, rail industry standards and workplace procedures

1.5

Plant, equipment and materials are prepared for work

2

Install guard rail

2.1

Existing rail is removed, as required, to enable fitting of new rail

2.2

New or replacement guard rail is installed to required standards using suitable equipment and fastening system to restore functionality of guard rail

2.3

Final job is checked for compliance to required standards to enable services to be restored safely

3

Complete documentation

3.1

Required documentation procedures and processes are confirmed

3.2

Documentation is filled in legibly and proofread

3.3

Documentation is processed in accordance with workplace procedures

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

TLIB2097 - Install and maintain guard rails
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLIB2097 - Install and maintain guard rails

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: